Laserfiche WebLink
Item <br />No. <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />Quantity <br />Quantity to <br />Date <br />Current <br />Quantity <br />Amount to <br />Date <br />51 <br />2506.602 <br />CONNECT INTO EXISTING DRAINAGE STRUCTURE <br />EACH <br />$1,637.00 <br />1 <br />1 <br />0 <br />$1,637.00 <br />52 <br />2506.516 <br />CASTING ASSEMBLY <br />EACH <br />$736.00 <br />9 <br />12 <br />0 <br />$8,832.00 <br />53 <br />2506.522 <br />ADJUST FRAME & RING CASTING <br />EACH <br />$624.00 <br />5 <br />3 <br />0 <br />$1,872.00 <br />54 <br />2506.602 <br />CONSTRUCT POND OVERFLOW <br />EACH <br />$1,601.00 <br />1 <br />1 <br />0 <br />$1,601.00 <br />55 <br />2511.501 <br />RANDOM RIPRAP CLASS III <br />CU YD <br />$107.00 <br />30 <br />48.8 <br />0 <br />$5,221.60 <br />56 <br />2521.501 <br />4" CONCRETE WALK <br />SQ FT <br />$4.30 <br />2490 <br />3202.85 <br />0 <br />$13,772.26 <br />57 <br />2521.501 <br />4" CONCRETE WALK SPECIAL (COLORED CONCRETE) <br />SO FT <br />$5.10 <br />3449 <br />1541 <br />0 <br />$7,859.10 <br />58 <br />2521.511 <br />2" BITUMINOUS TRAIL <br />SQ FT <br />$0.92 <br />7059 <br />9867.9 <br />0 <br />$9,078.47 <br />59 <br />2531.507 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />SQ YD <br />$46.00 <br />84 <br />156.5 <br />0 <br />$7,199.00 <br />60 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN 6418 <br />LIN FT <br />$10.90 <br />3002 <br />3138 <br />0 <br />$34,204.20 <br />61 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN 6618 <br />LIN FT <br />$22.50 <br />100 <br />0 <br />0 <br />$0.00 <br />62 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN D412 <br />LIN FT <br />$11.80 <br />470 <br />470 <br />0 <br />$5,546.00 <br />63 <br />2531.618 <br />TRUNCATED DOMES <br />SQ FT <br />$36.00 <br />96 <br />96 <br />0 <br />$3,456.00 <br />64 <br />2540.602 <br />INSTALL MAIL BOX AND SUPPORT <br />EACH <br />$51.00 <br />7 <br />10 <br />0 <br />$510.00 <br />65 <br />2540.602 <br />MAILBOX SUPPORT <br />EACH <br />$102.00 <br />7 <br />0 <br />0 <br />$0.00 <br />66 <br />2554.509 <br />GUIDE POST TYPE B <br />EACH <br />$61.00 <br />1 <br />0 <br />0 <br />$0.00 <br />67 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$35,803.00 <br />1 <br />1 <br />0 <br />$35,803.00 <br />68 <br />2564.531 <br />SIGN PANELS TYPE C <br />SQ FT <br />$35.80 <br />60.5 <br />60.5 <br />0 <br />$2,165.90 <br />69 <br />2564.537 <br />INSTALL SIGN TYPE C <br />EACH <br />$87.00 <br />3 <br />3 <br />0 <br />$261.00 <br />70 <br />2564.602 <br />INSTALL DELINEATOR <br />EACH <br />$77.00 <br />4 <br />4 <br />0 <br />$308.00 <br />71 <br />2565.511 <br />TRAFFIC CONTROL SIGNAL SYSTEM B <br />SIG SYS <br />5170,829.00 <br />1 <br />1 <br />0 <br />$170,829.00 <br />72 <br />2565.601 <br />EMERGENCY VEHICLE PREEMPTION SYSTEM 6 <br />LUMP SUM <br />54,501 00 <br />1 <br />1 <br />0 <br />$4,501.00 <br />73 <br />2565.601 <br />TRAFFIC CONTROL INTERCONNECTION <br />LUMP SUM <br />615,344.00 <br />1 <br />1 <br />0 <br />$15,344.00 <br />74 <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />553.00 <br />11 <br />11 <br />0 <br />$583.00 <br />75 <br />2573.540 <br />FILTER LOG TYPE COMPOST LOG <br />LIN FT <br />$1.53 <br />2400 <br />420 <br />0 <br />$642.60 <br />76 <br />2573.601 <br />CULVERT END PROTECTION <br />LUMP SUM <br />$133.00 <br />1 <br />1 <br />0 <br />$133.00 <br />77 <br />2573.602 <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />EACH <br />$693.00 <br />1 <br />0 <br />0 <br />$0.00 <br />78 <br />2575.501 <br />SEEDING <br />ACRE <br />61,535.00 <br />0.85 <br />1.09 <br />0 <br />$1,673.15 <br />79 <br />2575.502 <br />SEED MIXTURE 350 <br />POUND <br />$4.30 <br />72 <br />136 <br />0 <br />$584.80 <br />80 <br />2575.511 <br />MULCH MATERIAL TYPE 3 <br />TON <br />$382.30 <br />1.7 <br />0 <br />0 <br />$0.00 <br />81 <br />2575.519 <br />DISK ANCHORING <br />ACRE <br />$183.60 <br />0.85 <br />0 <br />0 <br />$0.00 <br />82 <br />2575.532 <br />FERTILIZER TYPE 4 <br />POUND <br />$1.00 <br />128 <br />225 <br />0 <br />$225.00 <br />83 <br />2582.501 <br />PAVT MSSG (RT ARROW) PREFORMED THERMOPLASTIC <br />EACH <br />5307.00 <br />11 <br />8 <br />0 <br />$2,456.00 <br />84 <br />2582.501 <br />PAVT MSSG (LT ARROW) PREFORMED THERMOPLASTIC <br />EACH <br />$307.00 <br />6 <br />4 <br />0 <br />$1,228.00 <br />85 <br />2582.502 <br />4" SOLID LINE WHITE-EPDXY <br />LIN FT <br />$0.39 <br />6390 <br />4983 <br />0 <br />$1,943.37 <br />86 <br />2582.502 <br />4" SOLID LINE YELLOW-EPDXY <br />LIN FT <br />$0.39 <br />1080 <br />1085 <br />0 <br />$423.15 <br />87 <br />2582.502 <br />4" DOUBLE SOLID LINE YELLOW-EPDXY <br />LIN FT <br />$0.78 <br />3125 <br />2527 <br />0 <br />$1,971.06 <br />88 <br />2582.502 <br />24" SOLID LINE WHITE -PREFORMED THERMOPLASTIC <br />LIN FT <br />$21.30 <br />125 <br />131 <br />0 <br />$2,790.30 <br />89 <br />2582.502 <br />24" SOLID LINE YELLOW -PREFORMED THERMOPLASTIC <br />LIN FT <br />$21.80 <br />380 <br />256 <br />0 <br />$5,580.80 <br />90 <br />2582.503 <br />CROSSWALK MARKING- PREFORMED THERMOPLASTIC <br />SQ FT <br />$11.76 <br />756 <br />828 <br />0 <br />$9,737.28 <br />Totals For Section Project 1 - Birch Street (CSAH 34) Ware Road: <br />$704,026.78 <br />Project 2 - Lake Drive (CSAR 23) Main Street (CSAH 14) <br />91 <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />553,000.00 <br />1 <br />1 <br />0 <br />$53,000.00 <br />92 <br />2101.502 <br />CLEARING <br />TREE <br />$161.00 <br />19 <br />15 <br />0 <br />$2,415.00 <br />93 <br />2101.507 <br />GRUBBING <br />TREE <br />$46.00 <br />19 <br />15 <br />0 <br />5690.00 <br />94 <br />2102.502 <br />PAVEMENT MARKING REMOVAL - (STOP BAR) <br />LIN FT <br />$3.10 <br />110 <br />70 <br />0 <br />$217.00 <br />95 <br />2102.604 <br />PAVEMENT MARKING REMOVAL - (CROSSWALK) <br />SQ FT <br />$3.10 <br />180 <br />180 <br />0 <br />$558.00 <br />96 <br />2104.501 <br />REMOVE PIPE CULVERTS <br />LIN FT <br />$11.20 <br />110 <br />152 <br />0 <br />$1,702.40 <br />97 <br />2104.501 <br />REMOVE SEWER PIPE (STORM) <br />LIN FT <br />$15.30 <br />100 <br />96 <br />0 <br />$1,468.80 <br />98 <br />2104.501 <br />REMOVE CONCRETE CURB AND GUTTER <br />LIN FT <br />$2.13 <br />1449 <br />1370.5 <br />0 <br />$2,919.17 <br />Page 3 <br />