|
0
<br />COCO
<br />1.11
<br />S:plowe\cadV15pro'I 15-1536 TUBNBERRY CROSSING 2ND \15-1536 CAD \15-15.36 BASE 0.dwq
<br />PART II.C. - TERMINATION OF COVERAGE
<br />1. TERMINATION OF COVERAGE WHEN CONSTRUCTION IS COMPLETE: ALL PERMITTEE(S) MUST SUBMIT A
<br />NOTICE OF TERMINATION (NOT) TO THE MPCA ON A FORM PROVIDED BY THE COMMISSIONER WITHIN 30
<br />DAYS AFTER ALL ACTIVITIES REQUIRED FOR FINAL STABILIZATION (SEE PART IV.G.) ARE COMPLETE. THE
<br />PERMITTEE(S)' COVERAGE UNDER THIS PERMIT TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF
<br />THE NOT.
<br />2. TERMINATION OF COVERAGE WHEN TRANSFER OF OWNERSHIP OCCURS: ALL PERMITTEE(S) MUST
<br />SUBMIT A NOT ON A FORM PROVIDED BY THE COMMISSIONER WITHIN 30 DAYS AFTER SELLING OR
<br />OTHERWISE LEGALLY TRANSFERRING THE ENTIRE SITE, INCLUDING PERMIT RESPONSIBILITY FOR ROADS
<br />(E.G., STREET SWEEPING) AND STORMWATER INFRASTRUCTURE FINAL CLEAN OUT, OR TRANSFERRING
<br />PORTIONS OF A SITE TO ANOTHER PARTY. THE PERMITTEE(S)' COVERAGE UNDER THIS PERMIT
<br />TERMINATES AT MIDNIGHT ON THE SUBMISSION DATE OF THE NOT.
<br />3. PERMITTEE(S) MAY TERMINATE PERMIT COVERAGE PRIOR TO COMPLETION OF ALL CONSTRUCTION
<br />ACTIVITY IF ALL OF THE FOLLOWING CONDITIONS ARE MET. AFTER THE PERMIT IS TERMINATED UNDER
<br />THIS PART, IF THERE IS ANY SUBSEQUENT DEVELOPMENT ON THE REMAINING PORTIONS OF THE SITE
<br />WHERE CONSTRUCTION ACTIVITY WAS NOT COMPLETE, NEW PERMIT COVERAGE MUST BE OBTAINED IF
<br />THE SUBSEQUENT DEVELOPMENT ITSELF OR AS PART OF THE REMAINING COMMON PLAN OF
<br />DEVELOPMENT OR SALE WILL RESULT IN LAND DISTURBING ACTIVITIES OF ONE (1) OR MORE ACRES IN
<br />SIZE.
<br />A. CONSTRUCTION ACTIVITY HAS CEASED FOR AT LEAST 90 DAYS.
<br />B. AT LEAST 90 PERCENT (BY AREA) OF ALL ORIGINALLY PROPOSED CONSTRUCTION ACTIVITY HAS
<br />BEEN COMPLETED AND PERMANENT COVER ESTABLISHED ON THOSE AREAS.
<br />C. ON AREAS WHERE CONSTRUCTION ACTIVITY IS NOT COMPLETE, PERMANENT COVER HAS BEEN
<br />ESTABLISHED.
<br />D. THE SITE IS IN COMPLIANCE WITH PART IV.G.2. AND PART IV.G.3. AND WHERE APPLICABLE, PART
<br />IV.G.4. OR PART IV.G.5.
<br />4. PERMITTEE(S) MAY TERMINATE COVERAGE UPON APPROVAL BY THE MPCA IF INFORMATION IS
<br />SUBMITTED TO THE MPCA DOCUMENTING THAT TERMINATION IS APPROPRIATE BECAUSE THE PROJECT IS
<br />CANCELED.
<br />PART III.A.3 - TRAINING DOCUMENTATION
<br />TRAINING DOCUMENTATION: THE PERMITTEE(S) SHALL ENSURE THE INDIVIDUALS IDENTIFIED IN PART III.F.
<br />HAVE BEEN TRAINED IN ACCORDANCE WITH THIS PERMIT'S TRAINING REQUIREMENTS. THE PERMITTEE(S)
<br />SHALL ENSURE THE TRAINING IS RECORDED IN OR WITH THE SWPPP BEFORE THE START OF
<br />CONSTRUCTION OR AS SOON AS THE PERSONNEL FOR THE PROJECT HAVE BEEN DETERMINED.
<br />DOCUMENTATION SHALL INCLUDE:
<br />A. NAMES OF THE PERSONNEL ASSOCIATED WITH THIS PROJECT THAT ARE REQUIRED TO BE TRAINED
<br />PER PART III.F.1. OF THIS PERMIT.
<br />B. DATES OF TRAINING AND NAME OF INSTRUCTOR(S) AND ENTITY PROVIDING TRAINING.
<br />C. CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER OF HOURS OF TRAINING.
<br />PART III.B - SWPPP AMENDMENTS
<br />THE PERMITTEE(S) MUST AMEND THE SWPPP AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS,
<br />SUCH AS ADDITIONAL OR MODIFIED BMPS THAT ARE DESIGNED TO CORRECT PROBLEMS IDENTIFIED OR
<br />ADDRESS SITUATIONS WHENEVER:
<br />1. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION, MAINTENANCE, WEATHER OR SEASONAL
<br />CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON THE DISCHARGE OF POLLUTANTS TO SURFACE
<br />WATERS OR UNDERGROUND WATERS.
<br />2. INSPECTIONS OR INVESTIGATIONS BY SITE OWNER OR OPERATORS, USEPA OR MPCA OFFICIALS
<br />INDICATE THE SWPPP IS NOT EFFECTIVE IN ELIMINATING OR SIGNIFICANTLY MINIMIZING THE DISCHARGE
<br />OF POLLUTANTS TO SURFACE WATERS OR UNDERGROUND WATERS OR THAT THE DISCHARGES ARE
<br />CAUSING WATER QUALITY STANDARD EXCEEDANCES (E.G., NUISANCE CONDITIONS AS DEFINED IN MINN.
<br />R. 7050.0210, SUBP. 2).
<br />3. THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF MINIMIZING POLLUTANTS IN
<br />STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY, OR THE SWPPP IS NOT
<br />CONSISTENT WITH THE TERMS AND CONDITIONS OF THIS PERMIT.
<br />4. AT ANY TIME AFTER PERMIT COVERAGE IS EFFECTIVE, THE MPCA MAY DETERMINE THAT THE
<br />PROJECT'S STORMWATER DISCHARGES MAY CAUSE, HAVE REASONABLE POTENTIAL TO CAUSE, OR
<br />CONTRIBUTE TO NON -ATTAINMENT OF ANY APPLICABLE WATER QUALITY STANDARD, OR THAT THE
<br />SWPPP DOES NOT INCORPORATE THE APPLICABLE REQUIREMENTS IN PART III.A.8., (IMPAIRED WATERS
<br />AND TMDLS). IF A WATER QUALITY STANDARD CHANGES DURING THE TERM OF THIS PERMIT, THE MPCA
<br />WILL MAKE A DETERMINATION AS TO WHETHER A MODIFICATION OF THE SWPPP IS NECESSARY TO
<br />ADDRESS THE NEW STANDARD. IF THE MPCA MAKES SUCH DETERMINATION(S) OR ANY OF THE
<br />DETERMINATIONS IN PARTS III.6.1.-3., THE MPCA WILL NOTIFY THE PERMITTEE(S) IN WRITING. IN
<br />RESPONSE, THE PERMITTEE(S) MUST AMEND THE SWPPP TO ADDRESS THE IDENTIFIED CONCERNS AND
<br />SUBMIT INFORMATION REQUESTED BY THE MPCA, WHICH MAY INCLUDE AN INDIVIDUAL PERMIT
<br />APPLICATION. IF THE MPCA'S WRITTEN NOTIFICATION REQUIRES A RESPONSE, FAILURE TO RESPOND
<br />WITHIN THE SPECIFIED TIMEFRAME CONSTITUTES A PERMIT VIOLATION.
<br />PART III.C. - TEMPORARY SEDIMENT BASINS
<br />WHERE FIVE (5) OR MORE ACRES OF DISTURBED SOIL DRAIN TO A COMMON LOCATION, THE PERMITTEE(S) MUST
<br />PROVIDE A TEMPORARY SEDIMENT BASIN TO PROVIDE TREATMENT TO THE RUNOFF BEFORE IT LEAVES THE
<br />CONSTRUCTION SITE OR ENTERS SURFACE WATERS. A TEMPORARY SEDIMENT BASIN MAY BE CONVERTED TO A
<br />PERMANENT BASIN AFTER CONSTRUCTION IS COMPLETE. THE TEMPORARY BASIN IS NO LONGER REQUIRED WHEN
<br />PERMANENT COVER HAS REDUCED THE ACREAGE OF DISTURBED SOIL TO LESS THAN FIVE (5) ACRES DRAINING TO A
<br />COMMON LOCATION. THE PERMITTEE(S) IS/ARE ENCOURAGED, BUT NOT REQUIRED, TO INSTALL TEMPORARY SEDIMENT
<br />BASINS WHERE APPROPRIATE IN AREAS WITH STEEP SLOPES OR HIGHLY ERODIBLE SOILS EVEN IF LESS THAN FIVE (5)
<br />ACRES DRAINS TO ONE AREA. THE BASINS MUST BE DESIGNED AND CONSTRUCTED ACCORDING TO THE FOLLOWING
<br />REQUIREMENTS:
<br />1. THE BASINS MUST PROVIDE LIVE STORAGE FOR A CALCULATED VOLUME OF RUNOFF FROM A TWO-YEAR, 24-HOUR
<br />STORM FROM EACH ACRE DRAINED TO THE BASIN, EXCEPT THAT IN NO CASE SHALL THE BASIN PROVIDE LESS THAN
<br />1,800 CUBIC FEET OF LIVE STORAGE FROM EACH ACRE DRAINED TO THE BASIN.
<br />2. WHERE THE CALCULATION IN PART III.C.1. HAS NOT BEEN PERFORMED, A TEMPORARY SEDIMENT BASIN PROVIDING
<br />3,600 CUBIC FEET OF LIVE STORAGE PER ACRE DRAINED TO THE BASIN SHALL BE PROVIDED FOR THE ENTIRE
<br />DRAINAGE AREA OF THE TEMPORARY BASIN.
<br />3. TEMPORARY BASIN OUTLETS MUST BE DESIGNED TO PREVENT SHORT-CIRCUITING AND THE DISCHARGE OF
<br />FLOATING DEBRIS. THE BASIN MUST BE DESIGNED WITH THE ABILITY TO ALLOW COMPLETE BASIN DRAWDOWN FOR
<br />MAINTENANCE ACTIVITIES, AND MUST INCLUDE A STABILIZED EMERGENCY OVERFLOW TO PREVENT FAILURE OF POND
<br />INTEGRITY. THE OUTLET STRUCTURE MUST BE DESIGNED TO WITHDRAW WATER FROM THE SURFACE IN ORDER TO
<br />MINIMIZE THE DISCHARGE OF POLLUTANTS, EXCEPT THAT THE USE OF A SURFACE WITHDRAWAL MECHANISM FOR
<br />DISCHARGE OF THE BASIN MAY BE TEMPORARILY SUSPENDED DURING FROZEN CONDITIONS. ENERGY DISSIPATION MUST
<br />BE PROVIDED FOR THE BASIN OUTLET (SEE PART IV.B.5.).
<br />4. SEDIMENT BASINS MUST BE SITUATED OUTSIDE OF SURFACE WATERS AND ANY BUFFER ZONE REQUIRED UNDER
<br />APPENDIX A.C.3, AND MUST BE DESIGNED TO AVOID DRAINING WATER FROM WETLANDS UNLESS THE IMPACT TO THE
<br />WETLAND IS IN COMPLIANCE WITH THE REQUIREMENTS OF APPENDIX A, PART D.
<br />5. THE TEMPORARY BASINS MUST BE CONSTRUCTED AND MADE OPERATIONAL PRIOR TO 10 OR MORE ACRES OF
<br />DISTURBED SOIL DRAINING TO A COMMON LOCATION.
<br />6. WHERE A TEMPORARY SEDIMENT BASIN MEETING THE REQUIREMENTS OF THIS PART IS INFEASIBLE, EQUIVALENT
<br />SEDIMENT CONTROLS SUCH AS SMALLER SEDIMENT BASINS, AND/OR SEDIMENT TRAPS, SILT FENCES, VEGETATIVE
<br />BUFFER STRIPS, OR ANY APPROPRIATE COMBINATION OF MEASURES ARE REQUIRED FOR ALL DOWN-SLOPE
<br />BOUNDARIES OF THE CONSTRUCTION AREA AND FOR SIDE -SLOPE BOUNDARIES AS DICTATED BY INDIVIDUAL SITE
<br />CONDITIONS. IN DETERMINING WHETHER INSTALLING A SEDIMENT BASIN IS INFEASIBLE, THE PERMITTEE(S) MUST
<br />CONSIDER PUBLIC SAFETY AND MAY CONSIDER FACTORS SUCH AS SITE SOILS, SLOPE, AND AVAILABLE AREA ON SITE.
<br />THIS DETERMINATION OF INFEASIBILITY MUST BE DOCUMENTED IN THE SWPPP PRE PART III.A.5.
<br />PART III.E - RECORD RETENTION
<br />THE SWPPP (ORIGINAL OR COPIES) INCLUDING, ALL CHANGES TO IT, AND INSPECTIONS AND
<br />MAINTENANCE RECORDS MUST BE KEPT AT THE SITE DURING CONSTRUCTION BY THE PERMITTEE(S)
<br />WHO HAS/HAVE OPERATIONAL CONTROL OF THAT PORTION OF THE SITE. THE SWPPP CAN BE KEPT IN
<br />EITHER THE FIELD OFFICE OR IN AN ON-SITE VEHICLE DURING NORMAL WORKING HOURS.
<br />ALL OWNER(S) MUST KEEP THE FOLLOWING RECORDS ON FILE FOR THREE (3) YEARS AFTER SUBMITTAL
<br />OF THE NOT AS OUTLINED IN PART II.C. THIS DOES NOT INCLUDE ANY RECORDS AFTER SUBMITTAL OF
<br />1. THE FINAL SWPPP
<br />2. ANY OTHER STORMWATER RELATED PERMITS REQUIRED FOR THE PROJECT
<br />3. RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION (PART IV.E.
<br />INSPECTIONS AND MAINTENANCE)
<br />PART III.E - RECORD RETENTION (CONT)
<br />4. ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN IMPLEMENTED,
<br />INCLUDING ALL RIGHT-OF-WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS
<br />REGARDING PERPETUAL MAINTENANCE AND
<br />5. ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER
<br />MANAGEMENT SYSTEMS.
<br />PART III.F. - TRAINING REQUIREMENTS
<br />THE PERMITTEE(S) SHALL ENSURE THE FOLLOWING INDIVIDUALS IDENTIFIED IN THIS PART HAVE BEEN
<br />TRAINED IN ACCORDANCE WITH THIS PERMIT'S TRAINING REQUIREMENTS.
<br />1. WHO MUST BE TRAINED:
<br />A. INDIVIDUAL(S) PREPARING THE SWPPP FOR THE PROJECT
<br />B. INDIVIDUAL(S) OVERSEEING IMPLEMENTATION OF, REVISING, AND AMENDING THE SWPPP AND
<br />INDIVIDUAL(S) PERFORMING INSPECTIONS AS REQUIRED IN PART IV.E. ONE OF THESE INDIVIDUAL(S)
<br />MUST BE AVAILABLE FOR AN ONSITE INSPECTION WITHIN 72 HOURS UPON REQUEST BY THE MPCA.
<br />C. INDIVIDUAL(S) PERFORMING OR SUPERVISING THE INSTALLATION, MAINTENANCE AND REPAIR OF
<br />BMPS. AT LEAST ONE INDIVIDUAL ON A PROJECT MUST BE TRAINED IN THESE JOB DUTIES.
<br />2. TRAINING CONTENT: THE CONTENT AND EXTENT OF TRAINING MUST BE COMMENSURATE WITH THE
<br />INDIVIDUAL'S JOB DUTIES AND RESPONSIBILITIES WITH REGARD TO ACTIVITIES COVERED UNDER THIS
<br />PERMIT FOR THE PROJECT. AT LEAST ONE INDIVIDUAL PRESENT ON THE PERMITTED PROJECT SITE (OR
<br />AVAILABLE TO THE PROJECT SITE IN 72 HOURS) MUST BE TRAINED IN THE JOB DUTIES DESCRIBED IN
<br />PART III.F.1.B. AND PART III.F.1.C.
<br />3. THE PERMITTEE(S) SHALL ENSURE THAT THE INDIVIDUALS ARE TRAINED BY LOCAL, STATE, FEDERAL
<br />AGENCIES, PROFESSIONAL ORGANIZATIONS, OR OTHER ENTITIES WITH EXPERTISE IN EROSION
<br />PREVENTION, SEDIMENT CONTROL, PERMANENT STORMWATER MANAGEMENT AND THE MINNESOTA
<br />NPDES/SDS CONSTRUCTION STORMWATER PERMIT. AN UPDATE REFRESHER -TRAINING MUST BE
<br />ATTENDED EVERY THREE (3) YEARS STARTING THREE (3) YEARS FROM THE ISSUANCE DATE OF THIS
<br />PERMIT.
<br />IV.B. EROSION PREVENTION PRACTICES
<br />1. THE PERMITTEE(S) MUST PLAN FOR AND IMPLEMENT APPROPRIATE BMPS SUCH AS CONSTRUCTION
<br />PHASING, VEGETATIVE BUFFER STRIPS, HORIZONTAL SLOPE GRADING, INSPECTION AND MAINTENANCE OF
<br />PART IV.E. AND OTHER CONSTRUCTION PRACTICES THAT MINIMIZE EROSION AS NECESSARY TO COMPLY
<br />WITH THIS PERMIT AND PROTECT WATERS OF THE STATE. THE LOCATION OF AREAS NOT TO BE
<br />DISTURBED MUST BE DELINEATED (E.G., WITH FLAGS, STAKES, SIGNS, SILT FENCE ETC.) ON THE PROJECT
<br />SITE BEFORE WORK BEGINS. THE PERMITTEE(S) MUST MINIMIZE THE NEED FOR DISTURBANCE OF PORTIONS
<br />OF THE PROJECT THAT HAVE STEEP SLOPES. FOR THOSE SLOPED AREAS WHICH MUST BE DISTURBED,
<br />THE PERMITTEE(S) MUST USE TECHNIQUES SUCH AS PHASING AND STABILIZATION PRACTICES DESIGNED
<br />FOR STEEP SLOPES (E.G., SLOPE DRAINING AND TERRACING).
<br />2. THE PERMITTEE(S) MUST STABILIZE ALL EXPOSED SOIL AREAS (INCLUDING STOCKPILES). STABILIZATION
<br />MUST BE INITIATED IMMEDIATELY TO LIMIT SOIL EROSION WHENEVER ANY CONSTRUCTION ACTIVITY HAS
<br />PERMANENTLY OR TEMPORARILY CEASED ON ANY PORTION OF THE SITE AND WILL NOT RESUME FOR A
<br />PERIOD EXCEEDING 7 CALENDAR DAYS. STABILIZATION MUST BE COMPLETED NO LATER THAN 14
<br />CALENDAR DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF THE SITE HAS TEMPORARILY
<br />OR PERMANENTLY CEASED.
<br />3. IF USING STORMWATER CONVEYANCE CHANNELS, THE PERMITTEE(S) MUST DESIGN THE CHANNELS TO
<br />ROUTE WATER AROUND UNSTABILIZED AREAS ON THE SITE AND TO REDUCE EROSION, UNLESS INFEASIBLE.
<br />THE PERMITTEE(S) MUST USE EROSION CONTROLS AND VELOCITY DISSIPATION DEVICES SUCH AS CHECK
<br />DAMS, SEDIMENT TRAPS, RIPRAP, OR GROUTED RIPRAP AT OUTLETS WITHIN AND ALONG THE LENGTH OF
<br />ANY CONSTRUCTED STORMWATER CONVEYANCE CHANNEL, AND AT ANY OUTLET, TO PROVIDE A
<br />NON-EROSIVE FLOW VELOCITY, TO MINIMIZE EROSION OF CHANNELS AND THEIR EMBANKMENTS, OUTLETS,
<br />ADJACENT STREAM BANKS, SLOPES, AND DOWNSTREAM WATERS DURING DISCHARGE CONDITIONS.
<br />4. THE PERMITTEE(S) MUST STABILIZE THE NORMAL WETTED PERIMETER OF ANY TEMPORARY OR
<br />PERMANENT DRAINAGE DITCH OR SWALE THAT DRAINS WATER FROM ANY PORTION OF THE CONSTRUCTION
<br />SITE, OR DIVERTS WATER AROUND THE SITE, WITHIN 200 LINEAL FEET FROM THE PROPERTY EDGE, OR
<br />FROM THE POINT OF DISCHARGE INTO ANY SURFACE WATER. STABILIZATION OF THE LAST 200 LINEAL
<br />FEET MUST BE COMPLETED WITHIN 24 HOURS AFTER CONNECTING TO A SURFACE WATER OR PROPERTY
<br />EDGE.
<br />THE PERMITTEE(S) SHALL COMPLETE STABILIZATION OF THE REMAINING PORTIONS OF ANY TEMPORARY OR
<br />PERMANENT DITCHES OR SWALES WITHIN 7 CALENDAR DAYS AFTER CONNECTING TO A SURFACE WATER
<br />OR PROPERTY EDGE AND CONSTRUCTION IN THAT PORTION OF THE DITCH HAS TEMPORARILY OR
<br />PERMANENTLY CEASED.
<br />TEMPORARY OR PERMANENT DITCHES OR SWALES THAT ARE BEING USED AS A SEDIMENT CONTAINMENT
<br />SYSTEM DURING CONSTRUCTION (WITH PROPERLY DESIGNED ROCK -DITCH CHECKS, BIO ROLLS, SILT DIKES,
<br />ETC.) DO NOT NEED TO BE STABILIZED DURING THE TEMPORARY PERIOD OF ITS USE AS A SEDIMENT
<br />CONTAINMENT SYSTEM. THESE AREAS MUST BE STABILIZED WITHIN 24 HOURS AFTER NO LONGER BEING
<br />USED AS A SEDIMENT CONTAINMENT SYSTEM.
<br />APPLYING MULCH, HYDROMULCH, TACKIFIER, POLYACRYLAMIDE OR SIMILAR EROSION PREVENTION
<br />PRACTICES IS NOT ACCEPTABLE STABILIZATION IN ANY PART OF A TEMPORARY OR PERMANENT DRAINAGE
<br />DITCH OR SWALE.
<br />5. PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24
<br />HOURS AFTER CONNECTION TO A SURFACE WATER.
<br />6. UNLESS INFEASIBLE DUE TO LACK OF PERVIOUS OR VEGETATED AREAS, THE PERMITTEE(S) MUST
<br />DIRECT DISCHARGES FROM BMPS TO VEGETATED AREAS OF THE SITE (INCLUDING ANY NATURAL BUFFERS)
<br />IN ORDER TO INCREASE SEDIMENT REMOVAL AND MAXIMIZE STORMWATER INFILTRATION. THE PERMITTEE(S)
<br />MUST USE VELOCITY DISSIPATION DEVICES IF NECESSARY TO PREVENT EROSION WHEN DIRECTING
<br />STORMWATER TO VEGETATED AREAS.
<br />PART IV.C. - SEDIMENT CONTROL PRACTICES
<br />1. THE PERMITTEE(S) MUST EMPLOY SEDIMENT CONTROL PRACTICES AS NECESSARY TO MINIMIZE SEDIMENT
<br />FROM ENTERING SURFACE WATERS, INCLUDING CURB AND GUTTER SYSTEMS AND STORM SEWER INLETS. A.
<br />TEMPORARY OR PERMANENT DRAINAGE DITCHES AND SEDIMENT BASINS THAT ARE DESIGNED AS PART OF
<br />A SEDIMENT CONTAINMENT SYSTEM (E.G., DITCHES WITH ROCK -CHECK DAMS) REQUIRE SEDIMENT CONTROL
<br />PRACTICES ONLY AS APPROPRIATE FOR SITE CONDITIONS.
<br />B. IF THE DOWN GRADIENT SEDIMENT CONTROLS ARE OVERLOADED (BASED ON FREQUENT FAILURE OR
<br />EXCESSIVE MAINTENANCE REQUIREMENT), THE PERMITTEE(S) MUST INSTALL ADDITIONAL UPGRADIENT
<br />SEDIMENT CONTROL PRACTICES OR REDUNDANT BMPS TO ELIMINATE THE OVERLOADING, AND THE SWPPP
<br />MUST BE AMENDED TO IDENTIFY THESE ADDITIONAL PRACTICES AS REQUIRED IN PART III.B 1.-3.
<br />2. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS AND BE
<br />LOCATED UPGRADIENT OF ANY BUFFER ZONES. THE PERIMETER SEDIMENT CONTROL PRACTICE MUST BE IN
<br />PLACE BEFORE ANY UPGRADIENT LAND -DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN IN
<br />PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED IN ACCORDANCE WITH PART IV.G.
<br />3. THE PERMITTEE(S) SHALL RE -INSTALL ALL SEDIMENT CONTROL PRACTICES THAT HAVE BEEN ADJUSTED
<br />OR REMOVED TO ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE
<br />OF VEHICLES, IMMEDIATELY AFTER THE SHORT-TERM ACTIVITY HAS BEEN COMPLETED. THE PERMITTEE(S)
<br />SHALL COMPLETE ANY SHORT-TERM ACTIVITY THAT REQUIRES REMOVAL OF SEDIMENT CONTROL
<br />PRACTICES AS QUICKLY AS POSSIBLE. THE PERMITTEE(S) MUST RE -INSTALL SEDIMENT CONTROL
<br />PRACTICES BEFORE THE NEXT PRECIPITATION EVENT EVEN IF THE SHORT-TERM ACTIVITY IS NOT
<br />COMPLETE.
<br />4. ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION UNTIL
<br />ALL SOURCES WITH POTENTIAL FOR DISCHARGING TO THE INLET HAVE BEEN STABILIZED. INLET
<br />PROTECTION MAY BE REMOVED FOR A PARTICULAR INLET IF A SPECIFIC SAFETY CONCERN (STREET
<br />FLOODING/FREEZING) HAS BEEN IDENTIFIED BY THE PERMITTEE(S) OR THE JURISDICTIONAL AUTHORITY
<br />(E.G., CITY/COUNTY/TOWNSHIP/MNDOT ENGINEER).THE PERMITTEE(S) MUST DOCUMENT THE NEED FOR
<br />REMOVAL IN THE SWPPP.
<br />5. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS, AND
<br />CANNOT BE PLACED IN ANY NATURAL BUFFERS OR SURFACE WATERS, INCLUDING STORMWATER
<br />CONVEYANCES SUCH AS CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES UNLESS THERE IS A
<br />BYPASS IN PLACE FOR THE STORMWATER.
<br />6. WHERE VEHICLE TRAFFIC LEAVES ANY PART OF THE SITE (OR ONTO PAVED ROADS WITHIN THE SITE):
<br />A. THE PERMITTEE(S) MUST INSTALL A VEHICLE TRACKING BMP TO MINIMIZE THE TRACK OUT OF
<br />SEDIMENT FROM THE CONSTRUCTION SITE. EXAMPLES OF VEHICLE TRACKING BMPS INCLUDE (BUT ARE NOT
<br />LIMITED TO) ROCK PADS, MUD MATS, SLASH MULCH, CONCRETE OR STEEL WASH RACKS, OR EQUIVALENT
<br />SYSTEMS.
<br />B. THE PERMITTEE(S) MUST USE STREET SWEEPING IF SUCH VEHICLE TRACKING BMPS ARE NOT ADEQUATE
<br />TO PREVENT SEDIMENT FROM BEING TRACKED ONTO THE STREET (SEE PART IV.E.5.D.).
<br />7. THE PERMITTEE(S) MUST INSTALL TEMPORARY SEDIMENTATION BASINS AS REQUIRED IN PART III.C. OF
<br />THIS PERMIT.
<br />PART IV.C. - SEDIMENT CONTROL PRACTICES (CONT.)
<br />8. THE PERMITTEE(S) MUST MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.
<br />MINIMIZING SOIL COMPACTION IS NOT REQUIRED WHERE THE FUNCTION OF A SPECIFIC AREA OF THE SITE
<br />DICTATES THAT IT BE COMPACTED.
<br />9. THE PERMITTEE(S) MUST PRESERVE A 50 FOOT NATURAL BUFFER OR (IF A BUFFER IS INFEASIBLE ON
<br />THE SITE) PROVIDE REDUNDANT SEDIMENT CONTROLS WHEN A SURFACE WATER IS LOCATED WITHIN 50
<br />FEET OF THE PROJECT'S EARTH DISTURBANCES AND STORMWATER FLOWS TO THE SURFACE WATER.
<br />NATURAL BUFFERS ARE NOT REQUIRED ADJACENT TO ROAD DITCHES, JUDICIAL DITCHES, COUNTY DITCHES,
<br />STORMWATER CONVEYANCE CHANNELS, STORM DRAIN INLETS, AND SEDIMENT BASINS. THE PERMITTEE(S)
<br />IS/ARE NOT REQUIRED TO ENHANCE THE QUALITY OF THE VEGETATION THAT ALREADY EXISTS IN THE
<br />BUFFER OR PROVIDE VEGETATION IF NONE EXIST. HOWEVER, PERMITTEE(S) CAN IMPROVE THE NATURAL
<br />BUFFER WITH VEGETATION.
<br />PART IV.D. - DEWATERING AND BASIN DRAINING
<br />1. THE PERMITTEE(S) MUST DISCHARGE TURBID OR SEDIMENT -LADEN WATERS RELATED TO DEWATERING
<br />OR BASIN DRAINING (E.G., PUMPED DISCHARGES, TRENCH/DITCH CUTS FOR DRAINAGE) TO A
<br />TEMPORARY OR PERMANENT SEDIMENTATION BASIN ON THE PROJECT SITE UNLESS INFEASIBLE. THE
<br />PERMITTEE(S) MAY DISCHARGE FROM THE TEMPORARY OR PERMANENT SEDIMENTATION BASINS TO
<br />SURFACE WATERS IF THE BASIN WATER HAS BEEN VISUALLY CHECKED TO ENSURE ADEQUATE
<br />TREATMENT HAS BEEN OBTAINED IN THE BASIN AND THAT NUISANCE CONDITIONS (SEE MINN. R.
<br />7050.0210, SUBP. 2) WILL NOT RESULT FROM THE DISCHARGE. IF THE WATER CANNOT BE DISCHARGED
<br />TO A SEDIMENTATION BASIN PRIOR TO ENTERING THE SURFACE WATER, IT MUST BE TREATED WITH THE
<br />APPROPRIATE BMPS, SUCH THAT THE DISCHARGE DOES NOT ADVERSELY AFFECT THE RECEIVING WATER
<br />OR DOWNSTREAM PROPERTIES. IF THE PERMITTEE(S) MUST DISCHARGE WATER THAT CONTAINS OIL OR
<br />GREASE, THE PERMITTEE(S) MUST USE AN OIL -WATER SEPARATOR OR SUITABLE FILTRATION DEVICE
<br />(E.G. CARTRIDGE FILTERS, ABSORBENTS PADS) PRIOR TO DISCHARGING THE WATER. THE PERMITTEE(S)
<br />MUST ENSURE THAT DISCHARGE POINTS ARE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE
<br />DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEETING, OR
<br />OTHER ACCEPTED ENERGY DISSIPATION MEASURES.
<br />2. ALL WATER FROM DEWATERING OR BASIN -DRAINING ACTIVITIES MUST BE DISCHARGED IN A MANNER
<br />THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN RECEIVING CHANNELS OR ON DOWNSLOPE
<br />PROPERTIES, OR INUNDATION IN WETLANDS CAUSING SIGNIFICANT ADVERSE IMPACT TO THE WETLAND.
<br />3. IF THE PERMITTEE(S) IS/ARE USING FILTERS WITH BACKWASH WATER, THE PERMITTEE(S) MUST HAUL
<br />THE BACKWASH WATER AWAY FOR DISPOSAL, RETURN THE BACKWASH WATER TO THE BEGINNING OF
<br />THE TREATMENT PROCESS, OR INCORPORATE THE BACKWASH WATER INTO THE SITE IN A MANNER
<br />THAT DOES NOT CAUSE EROSION. THE PERMITTEE(S) MAY DISCHARGE BACKWASH WATER TO THE
<br />SANITARY SEWER IF PERMISSION IS GRANTED BY THE SANITARY SEWER AUTHORITY. THE PERMITTEE(S)
<br />MUST REPLACE AND CLEAN THE FILTER MEDIA USED IN DEWATERING DEVICES WHEN REQUIRED TO
<br />RETAIN ADEQUATE FUNCTION
<br />PART IV.E. - INSPECTIONS AND MAINTENANCE
<br />1. THE PERMITTEE(S) MUST ENSURE THAT A TRAINED PERSON (AS IDENTIFIED IN PART III.A.3.A.) WILL
<br />ROUTINELY INSPECT THE ENTIRE CONSTRUCTION SITE AT LEAST ONCE EVERY SEVEN (7) DAYS DURING
<br />ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN
<br />24 HOURS. FOLLOWING AN INSPECTION THAT OCCURS WITHIN 24 HOURS AFTER A RAINFALL EVENT, THE
<br />NEXT INSPECTION MUST BE CONDUCTED WITHIN SEVEN (7) DAYS AFTER THE RAINFALL EVENT.
<br />2. ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION MUST BE RECORDED WITHIN
<br />24 HOURS IN WRITING AND THESE RECORDS MUST BE RETAINED WITH THE SWPPP IN ACCORDANCE
<br />WITH PART III.E. RECORDS OF EACH INSPECTION AND MAINTENANCE ACTIVITY SHALL INCLUDE:
<br />A. DATE AND TIME OF INSPECTIONS
<br />B. NAME OF PERSON(S) CONDUCTING INSPECTIONS
<br />C. FINDINGS OF INSPECTIONS, INCLUDING THE SPECIFIC LOCATION WHERE CORRECTIVE ACTIONS ARE
<br />NEEDED
<br />D. CORRECTIVE ACTIONS TAKEN (INCLUDING DATES, TIMES, AND PARTY COMPLETING MAINTENANCE
<br />ACTIVITIES)
<br />E. DATE AND AMOUNT OF ALL RAINFALL EVENTS GREATER THAN 1/2 INCH (0.5 INCHES) IN 24 HOURS.
<br />RAINFALL AMOUNTS MUST BE OBTAINED BY A PROPERLY MAINTAINED RAIN GAUGE INSTALLED ONSITE,
<br />A WEATHER STATION THAT IS WITHIN 1 MILE OF YOUR LOCATION OR A WEATHER REPORTING SYSTEM
<br />THAT PROVIDES SITE SPECIFIC RAINFALL DATA FROM RADAR SUMMARIES.
<br />F. IF ANY DISCHARGE IS OBSERVED TO BE OCCURRING DURING THE INSPECTION, A RECORD OF ALL
<br />POINTS OF THE PROPERTY FROM WHICH THERE IS A DISCHARGE MUST BE MADE, AND THE DISCHARGE
<br />SHOULD BE DESCRIBED (I.E., COLOR, ODOR, FLOATING, SETTLED, OR SUSPENDED SOLIDS, FOAM, OIL
<br />SHEEN, AND OTHER OBVIOUS INDICATORS OF POLLUTANTS) AND PHOTOGRAPHED.
<br />G. ANY AMENDMENTS TO THE SWPPP PROPOSED AS A RESULT OF THE INSPECTION MUST BE
<br />DOCUMENTED AS REQUIRED IN PART III.B. WITHIN SEVEN (7) CALENDAR DAYS.
<br />3. INSPECTION FREQUENCY ADJUSTMENT
<br />A. WHERE PARTS OF THE PROJECT SITE HAVE PERMANENT COVER, BUT WORK REMAINS ON OTHER
<br />PARTS OF THE SITE, THE PERMITTEE(S) MAY REDUCE INSPECTIONS OF THE AREAS WITH PERMANENT
<br />COVER TO ONCE PER MONTH.
<br />B. WHERE CONSTRUCTION SITES HAVE PERMANENT COVER ON ALL EXPOSED SOIL AREAS AND NO
<br />CONSTRUCTION ACTIVITY IS OCCURRING ANYWHERE ON THE SITE, THE SITE MUST BE INSPECTED DURING
<br />NON -FROZEN GROUND CONDITIONS AT LEAST ONCE PER MONTH FOR A PERIOD OF TWELVE (12)
<br />MONTHS. FOLLOWING THE TWELFTH MONTH OF PERMANENT COVER AND NO CONSTRUCTION ACTIVITY,
<br />INSPECTIONS MAY BE TERMINATED UNTIL CONSTRUCTION ACTIVITY IS ONCE AGAIN INITIATED UNLESS
<br />THE PERMITTEE(S) IS/ARE NOTIFIED IN WRITING BY THE MPCA THAT EROSION ISSUES HAVE BEEN
<br />DETECTED AT THE SITE AND INSPECTIONS NEED TO RESUME.
<br />C. WHERE WORK HAS BEEN SUSPENDED DUE TO FROZEN GROUND CONDITIONS, THE INSPECTIONS MAY
<br />BE SUSPENDED. THE REQUIRED INSPECTIONS AND MAINTENANCE SCHEDULE MUST BEGIN WITHIN 24
<br />HOURS AFTER RUNOFF OCCURS AT THE SITE OR 24 HOURS PRIOR TO RESUMING CONSTRUCTION,
<br />WHICHEVER COMES FIRST.
<br />4. THE PERMITTEE(S) IS/ARE RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE OF TEMPORARY
<br />AND PERMANENT WATER QUALITY MANAGEMENT BMPS, AS WELL AS ALL EROSION PREVENTION AND
<br />SEDIMENT CONTROL BMPS, UNTIL ANOTHER PERMITTEE HAS OBTAINED COVERAGE UNDER THIS PERMIT
<br />ACCORDING TO PART 11.6.5. OR THE PROJECT HAS UNDERGONE FINAL STABILIZATION, AND AN NOT HAS
<br />BEEN SUBMITTED TO THE MPCA.
<br />5. THE PERMITTEE(S) MUST INSPECT ALL EROSION PREVENTION AND SEDIMENT CONTROL BMPS AND
<br />POLLUTION PREVENTION MANAGEMENT MEASURES TO ENSURE INTEGRITY AND EFFECTIVENESS DURING
<br />ALL ROUTINE AND POST -RAINFALL EVENT INSPECTIONS. ALL NONFUNCTIONAL BMPS MUST BE REPAIRED,
<br />REPLACED, OR SUPPLEMENTED WITH FUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY
<br />AFTER DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS UNLESS ANOTHER TIME FRAME
<br />IS SPECIFIED BELOW. THE PERMITTEE(S) MUST INVESTIGATE AND COMPLY WITH THE FOLLOWING
<br />INSPECTION AND MAINTENANCE REQUIREMENTS:
<br />A. ALL PERIMETER CONTROL DEVICES MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WHEN THEY
<br />BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES ONE-HALF (1/2) OF THE HEIGHT OF THE DEVICE.
<br />THESE REPAIRS MUST BE MADE BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY, OR
<br />THEREAFTER AS SOON AS FIELD CONDITIONS ALLOW ACCESS.
<br />B. TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT
<br />REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES ONE-HALF (1/2) THE
<br />STORAGE VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR
<br />AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART IV.D.).
<br />C. SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED
<br />FOR EVIDENCE OF EROSION AND SEDIMENT DEPOSITION DURING EACH INSPECTION. THE PERMITTEE(S)
<br />MUST REMOVE ALL DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE
<br />WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND RESTABILIZE THE AREAS WHERE SEDIMENT
<br />REMOVAL RESULTS IN EXPOSED SOIL. THE REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN
<br />SEVEN (7) DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS
<br />CONSTRAINTS. THE PERMITTEE(S) SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF
<br />PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS OF
<br />OBTAINING ACCESS. THE PERMITTEE(S) IS/ARE RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL,
<br />STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING
<br />ANY WORK IN SURFACE WATERS.
<br />D. CONSTRUCTION SITE VEHICLE EXIT LOCATIONS MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE
<br />SEDIMENT TRACKING ONTO PAVED SURFACES. TRACKED SEDIMENT MUST BE REMOVED FROM ALL PAVED
<br />SURFACES BOTH ON AND OFF SITE WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A
<br />SHORTER TIME TO COMPLY WITH PART IV.C.6.
<br />E. STREETS AND OTHER AREAS ADJACENT TO THE PROJECT MUST BE INSPECTED FOR EVIDENCE OF
<br />OFF-SITE ACCUMULATIONS OF SEDIMENT. IF SEDIMENT IS PRESENT, IT MUST BE REMOVED IN A MANNER
<br />AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS (E.G., FUGITIVE SEDIMENT IN
<br />STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY
<br />HAZARD TO USERS OF PUBLIC STREETS).
<br />6. ALL INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING
<br />CONSTRUCTION ACTIVITY IS REACHING THE INFILTRATION AREA. ALL INFILTRATION AREAS MUST BE
<br />INSPECTED TO ENSURE THAT EQUIPMENT IS NOT BEING DRIVEN ACROSS THE INFILTRATION AREA.
<br />PART IV.F. - POLLUTION PREVENTION MANAGEMENT MEASURES
<br />THE PERMITTEE(S) SHALL IMPLEMENT THE FOLLOWING POLLUTION PREVENTION MANAGEMENT MEASURES
<br />ON THE SITE:
<br />1. STORAGE, HANDLING, AND DISPOSAL OF CONSTRUCTION PRODUCTS, MATERIALS, AND WASTES: THE
<br />PERMITTEE(S) SHALL COMPLY WITH THE FOLLOWING TO MINIMIZE THE EXPOSURE TO STORMWATER OF
<br />ANY OF THE PRODUCTS, MATERIALS, OR WASTES. PRODUCTS OR WASTES WHICH ARE EITHER NOT A
<br />SOURCE OF CONTAMINATION TO STORMWATER OR ARE DESIGNED TO BE EXPOSED TO STORMWATER ARE
<br />NOT HELD TO THIS REQUIREMENT:
<br />A. BUILDING PRODUCTS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS MUST BE UNDER COVER
<br />(E.G., PLASTIC SHEETING OR TEMPORARY ROOFS) TO PREVENT THE DISCHARGE OF POLLUTANTS OR
<br />PROTECTED BY A SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE CONTACT WITH STORMWATER.
<br />B. PESTICIDES, HERBICIDES, INSECTICIDES, FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE
<br />MATERIALS MUST BE UNDER COVER (E.G., PLASTIC SHEETING OR TEMPORARY ROOFS) TO PREVENT THE
<br />DISCHARGE OF POLLUTANTS OR PROTECTED BY SIMILARLY EFFECTIVE MEANS DESIGNED TO MINIMIZE
<br />CONTACT WITH STORMWATER.
<br />C. HAZARDOUS MATERIALS, TOXIC WASTE, (INCLUDING OIL, DIESEL FUEL, GASOLINE, HYDRAULIC FLUIDS,
<br />PAINT SOLVENTS, PETROLEUM-BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, CURING
<br />COMPOUNDS, AND ACIDS) MUST BE PROPERLY STORED IN SEALED CONTAINERS TO PREVENT SPILLS,
<br />LEAKS OR OTHER DISCHARGE. RESTRICTED ACCESS STORAGE AREAS MUST BE PROVIDED TO PREVENT
<br />VANDALISM. STORAGE AND DISPOSAL OF HAZARDOUS WASTE OR HAZARDOUS MATERIALS MUST BE IN
<br />COMPLIANCE WITH MINN. R. CH. 7045 INCLUDING SECONDARY CONTAINMENT AS APPLICABLE.
<br />D. SOLID WASTE MUST BE STORED, COLLECTED AND DISPOSED OF PROPERLY IN COMPLIANCE WITH
<br />MINN. R. CH. 7035.
<br />E. PORTABLE TOILETS MUST BE POSITIONED SO THAT THEY ARE SECURE AND WILL NOT BE TIPPED OR
<br />KNOCKED OVER. SANITARY WASTE MUST BE DISPOSED OF PROPERLY IN ACCORDANCE WITH MINN. R.
<br />CH. 7041.
<br />2. FUELING AND MAINTENANCE OF EQUIPMENT OR VEHICLES; SPILL PREVENTION AND RESPONSE: THE
<br />PERMITTEE(S) SHALL TAKE REASONABLE STEPS TO PREVENT THE DISCHARGE OF SPILLED OR LEAKED
<br />CHEMICALS, INCLUDING FUEL, FROM ANY AREA WHERE CHEMICALS OR FUEL WILL BE LOADED OR
<br />UNLOADED INCLUDING THE USE OF DRIP PANS OR ABSORBENTS UNLESS INFEASIBLE. THE PERMITTEE(S)
<br />MUST CONDUCT FUELING IN A CONTAINED AREA UNLESS INFEASIBLE. THE PERMITTEE(S) MUST ENSURE
<br />ADEQUATE SUPPLIES ARE AVAILABLE AT ALL TIMES TO CLEAN UP DISCHARGED MATERIALS AND THAT
<br />AN APPROPRIATE DISPOSAL METHOD IS AVAILABLE FOR RECOVERED SPILLED MATERIALS. THE
<br />PERMITTEE(S) MUST REPORT AND CLEAN UP SPILLS IMMEDIATELY AS REQUIRED BY MINN. STAT. §
<br />115.061, USING DRY CLEAN UP MEASURES WHERE POSSIBLE.
<br />3. VEHICLE AND EQUIPMENT WASHING: IF THE PERMITTEE(S) WASH THE EXTERIOR OF VEHICLES OR
<br />EQUIPMENT ON THE PROJECT SITE, WASHING MUST BE LIMITED TO A DEFINED AREA OF THE SITE.
<br />RUNOFF FROM THE WASHING AREA MUST BE CONTAINED IN A SEDIMENT BASIN OR OTHER SIMILARLY
<br />EFFECTIVE CONTROLS AND WASTE FROM THE WASHING ACTIVITY MUST BE PROPERLY DISPOSED OF. THE
<br />PERMITTEE(S) MUST PROPERLY USE AND STORE SOAPS, DETERGENTS, OR SOLVENTS. NO ENGINE
<br />DEGREASING IS ALLOWED ON SITE.
<br />4. CONCRETE AND OTHER WASHOUTS WASTE: THE PERMITTEE(S) MUST PROVIDE EFFECTIVE
<br />CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT OPERATIONS (CONCRETE,
<br />STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER CONSTRUCTION MATERIALS)
<br />RELATED TO THE CONSTRUCTION ACTIVITY. THE LIQUID AND SOLID WASHOUT WASTES MUST NOT
<br />CONTACT THE GROUND, AND THE CONTAINMENT MUST BE DESIGNED SO THAT IT DOES NOT RESULT IN
<br />RUNOFF FROM THE WASHOUT OPERATIONS OR AREAS. LIQUID AND SOLID WASTES MUST BE DISPOSED
<br />OF PROPERLY AND IN COMPLIANCE WITH MPCA RULES. A SIGN MUST BE INSTALLED ADJACENT TO EACH
<br />WASHOUT FACILITY THAT REQUIRES SITE PERSONNEL TO UTILIZE THE PROPER FACILITIES FOR DISPOSAL
<br />OF CONCRETE AND OTHER WASHOUT WASTES.
<br />PART IV.G. FINAL STABILIZATION
<br />THE PERMITTEE(S) MUST ENSURE FINAL STABILIZATION OF THE SITE. FINAL STABILIZATION IS NOT
<br />COMPLETE UNTIL ALL REQUIREMENTS OF PARTS IV.G.1.-5. ARE COMPLETE:
<br />1. ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED AND ALL SOILS ARE
<br />STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70 PERCENT OF ITS
<br />EXPECTED FINAL GROWTH DENSITY OVER THE ENTIRE PERVIOUS SURFACE AREA, OR OTHER EQUIVALENT
<br />MEANS NECESSARY TO PREVENT SOIL FAILURE UNDER EROSIVE CONDITIONS.
<br />2. THE PERMANENT STORMWATER MANAGEMENT SYSTEM IS CONSTRUCTED, MEETS ALL REQUIREMENTS IN
<br />PART III.D. AND IS OPERATING AS DESIGNED. TEMPORARY OR PERMANENT SEDIMENTATION BASINS THAT
<br />ARE TO BE USED AS PERMANENT WATER QUALITY MANAGEMENT BASINS HAVE BEEN CLEANED OF ANY
<br />ACCUMULATED SEDIMENT. ALL SEDIMENT HAS BEEN REMOVED FROM CONVEYANCE SYSTEMS AND
<br />DITCHES ARE STABILIZED WITH PERMANENT COVER.
<br />3. ALL TEMPORARY SYNTHETIC AND STRUCTURAL EROSION PREVENTION AND SEDIMENT CONTROL BMPS
<br />(SUCH AS SILT FENCE) HAVE BEEN REMOVED ON THE PORTIONS OF THE SITE FOR WHICH THE
<br />PERMITTEE(S) IS/ARE RESPONSIBLE. BMPS DESIGNED TO DECOMPOSE ON SITE (SUCH AS SOME
<br />COMPOST LOGS) MAY BE LEFT IN PLACE.
<br />4. FOR RESIDENTIAL CONSTRUCTION ONLY, INDIVIDUAL LOTS ARE CONSIDERED FINALLY STABILIZED IF
<br />THE STRUCTURE(S) ARE FINISHED AND TEMPORARY EROSION PROTECTION AND DOWNGRADIENT
<br />PERIMETER CONTROL HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN SOLD TO THE HOMEOWNER.
<br />ADDITIONALLY, THE PERMITTEE HAS DISTRIBUTED THE MPCA'S "HOMEOWNER FACT SHEET" TO THE
<br />HOMEOWNER TO INFORM THE HOMEOWNER OF THE NEED FOR, AND BENEFITS OF, PERMANENT COVER.
<br />5. FOR CONSTRUCTION PROJECTS ON AGRICULTURAL LAND (E.G., PIPELINES ACROSS CROP, FIELD
<br />PASTURE OR RANGE LAND) THE DISTURBED LAND HAS BEEN RETURNED TO ITS PRECONSTRUCTION
<br />AGRICULTURAL USE.
<br />STORM WATER POLLUTION PREVENTION PLAN
<br />TURNBERRY CROSSING 2ND ADDITION
<br />DRAWN BY: DESIGN BY:
<br />C.M. C.W.P.
<br />CHCKD BY:
<br />C.W.P.
<br />PROJ. NO.
<br />15-1536
<br />ORIGINAL DATE:
<br />MARCH 4, 2015
<br />REVISION DESCRIPTION
<br />w
<br />1-
<br />a) a)
<br />E (o
<br />� E
<br />-
<br />m
<br />n3
<br />a
<br />az =
<br />co
<br />(13
<br />.2
<br />_.cn
<br />co E
<br />a)
<br />aa))
<br />L.
<br />a)
<br />c
<br />0)
<br />w
<br />aa) o
<br />- U 0
<br />o_
<br />1:3E>
<br />L
<br />U U
<br />2 _ >,
<br />✓ 0-
<br />03.04.2015
<br />w
<br />a
<br />0
<br />TURNBERRY CROSSING
<br />2ND ADDITION
<br />LINO LAKES, MINNESOTA
<br />Z
<br />O_
<br />~ Z
<br />Q
<br />J J
<br />J 0-
<br />0- Z
<br />rI 0 w0
<br />Qw
<br />2c[
<br />tY w
<br />0
<br />1 -
<br />PREPARED FOR:
<br />HOKANSON
<br />CONSTRUCTION
<br />SITE PLANNING
<br />& ENGINEERING
<br />PLOWS
<br />ENGINEERING, INC.
<br />6776 LAKE DRIVE
<br />SUITE 110
<br />LINO LAKES, MN 55014
<br />PHONE: (651) 361-8210
<br />FAX: (651) 361-8701
<br />C3.1
<br />
|