My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06-22-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
06-22-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 12:59:18 PM
Creation date
7/15/2015 12:19:52 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/22/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S:Aplowe\cad\15prol\15-1536 TURNBERRY CROSSING 2ND \15-1536 CAD \15-1536 BASE 0.dwq <br />SITE SPECIFIC INFORMATION <br />PROJECT NAME <br />TURNBERRY CROSSING 2ND ADDITION <br />PROJECT LOCATION <br />AQUA CIRCLE, SOUTHEAST OF LAKE DRIVE & NORTHEAST OF AQUA <br />LINO LAKES, MINNESOTA <br />LATITUDE: 45'09'54"N <br />LONGITUDE: 93'07'19"W <br />PROJECT OWNER <br />HOKANSON CONSTRUCTION, INC. ROGER HOKANSON <br />9174 ISANTI STREET N.E. (763) 286-7995 <br />BLAINE, MN 55434 <br />CONSTRUCTION ACTIVITY DESCRIPTION <br />SI <br />LANE, <br />CONSTRUCTION OF TOWNHOME UNITS AND GRADING TO ENLARGE EXISTING <br />INFILTRATION BASINS TO MEET CURRENT WATERSHED REQUIREMENTS <br />fE AREAS <br />BEFORE <br />CONSTRUCTION <br />AFTER <br />CONSTRUCTION <br />IMPAIRED <br />WATER <br />TOTAL SITE AREA <br />3.83 ACRES <br />TOTAL ESTIMATED IMPERVIOUS <br />0.73 ACRES <br />1.37 ACRES <br />TOTAL ESTIMATED PERVIOUS <br />3.11 ACRES <br />2.46 ACRES <br />TOTAL DISTURBED AREA <br />1.72 ACRES <br />RECEIVING WATERS WITHIN ONE MILE <br />NAME OF WATER BODY <br />TYPE OF <br />WATER BODY <br />SPECIAL <br />WATER <br />IMPAIRED <br />WATER <br />POND <br />POND <br />NO <br />NO <br />WETLANDS <br />WETLAND <br />NO <br />NO <br />RICE CREEK <br />CREEK <br />NO <br />NO <br />MARSHAN LAKE <br />LAKE <br />NO <br />YES <br />RICE LAKE <br />LAKE <br />NO <br />YES <br />SITE MAP AND DESIGN CALCULATIONS <br />SEE STORM WATER DRAINAGE REPORT FOR QUANTIFICATION OF STORM WATER <br />MANAGEMENT REQUIREMENTS AND DRAINAGE AREA MAPS. <br />SOILS, SLOPES, VEGETATION <br />SOIL TYPE(S): SEE "CONSTRUCTION ACTIVITY DESCRIPTION" FOR LIST OF SOILS <br />TYPES. <br />SLOPES: PROPOSED SLOPES WILL BE GENERALLY MODERATE AND ARE NOT <br />EXPECTED TO EXCEED 3:1. <br />VEGETATION: SEED AND MULCH IS PROPOSED FOR DISTURBED AREAS. <br />PERSON WHO PREPARED SWPPP ("DESIGNER") <br />CHARLES W. PLOWE <br />PLOWE ENGINEERING, INC. <br />6776 LAKE DRIVE <br />LINO LAKES MN 55014 <br />(651) 361-8200 <br />PERSON WHO WILL OVERSEE IMPLEMENTATION OF SWPPP ("CONTRACTOR") <br />TBD <br />PERSON(S) WHO WILL INSPECT ON—SITE ESC MEASURES ("INSPECTOR") <br />TBD <br />TRAINING DOCUMENTATION <br />DOCUMENTATION MUST ACCOMPANY THE SWPPP INDICATING THAT THE <br />INDIVIDUALS IDENTIFIED IN PART III.F. HAVE BEEN TRAINED IN ACCORDANCE WITH <br />THE REQUIREMENTS OF PART III.F. DOCUMENTATION SHALL INCLUDE: <br />A. NAMES OF THE PERSONNEL ASSOCIATED WITH THIS PROJECT THAT ARE <br />REQUIRED TO BE TRAINED PER PART III.F.1. OF THIS PERMIT. <br />B. DATES OF TRAINING AND NAME OF INSTRUCTOR(S) AND ENTITY <br />PROVIDING TRAINING. <br />C. CONTENT OF TRAINING COURSE OR WORKSHOP INCLUDING THE NUMBER <br />OF HOURS OF TRAINING. <br />SITE SEQUENCING 8c ESC NOTES <br />PRIOR TO ANY LAND—DISTURBING ACTIVITY, THE CONTRACTOR SHALL INSTALL <br />SILT FENCE AS SHOWN ON PLAN. ADDITIONAL SILT FENCE MAY BE NECESSARY <br />IF LOCAL CONDITIONS REQUIRE. SILT FENCE SHALL REMAIN IN—PLACE UNTIL THE <br />FINAL STABILIZATION HAS BEEN ESTABLISHED IN ACCORDANCE WITH PART IV.G. <br />THE CONTRACTOR SHALL PERFORM SITE GRADING ON AN AREA—BY—AREA BASIS <br />TO MINIMIZE UNSTABILIZED AREAS. AS EACH AREA IS COMPLETED, ALL EXPOSED <br />SOILS MUST HAVE TEMPORARY EROSION CONTROL PROTECTION OR PERMANENT <br />COVER WITHIN FOURTEEN (14) DAYS. <br />THE CONTRACTOR SHALL PROVIDE ALL SOD, SEED, MULCH AND FERTILIZER WHICH <br />SHALL CONFORM WITH THE FOLLOWING MNDOT SPECIFICATIONS AS MODIFIED <br />BELOW. <br />ITEM <br />MNDOT SPECIFICATION/NOTES <br />SOD <br />3878 <br />SEED ** <br />3876 <br />* FOR TURF ESTABLISHMENT <br />COMMERCIAL TURF <br />RESIDENTIAL TURF <br />MNDOT MIX 25-131 (220 LBS/ACRE) <br />MNDOT MIX 25-131 (120 LBS/ACRE) <br />TEMPORARY FALL COVER <br />SPRING/SUMMER <br />SOIL—BUILDING COVER <br />1-2 YEARS COVER <br />2-5 YEARS COVER <br />MNDOT MIX 21-112 (100 LBS/ACRE) <br />MNDOT MIX 21-111 (100 LBS/ACRE) <br />MNDOT MIX 21-113 (110 LBS/ACRE) <br />MNDOT MIX 22-111 (30.5 LBS/ACRE) <br />MNDOT MIX 22-112 (40 LBS/ACRE) <br />MULCH <br />3882 (TYPE 1 — DISC ANCHORED) <br />FERTILIZER <br />3881 <br />WOOD FIBER BLANKET <br />3885 (CATEGORY 2) <br />* MOW A MINIMUM OF: <br />RESIDENTIAL TURF — ONCE PER 2 WEEKS <br />COMMERCIAL TURF — ONCE PER 4 WEEKS <br />** SEEDED AREAS SHALL BE EITHER MULCHED OR COVERED BY FIBROUS <br />BLANKETS TO PROTECT SEEDS AND LIMIT EROSION. <br />TEMPORARY OR PERMANENT MULCH MUST BE UNIFORMLY APPLIED BY <br />MECHANICAL OR HYDRAULIC MEANS AND STABILIZED BY DISC—ANCHORING OR <br />USE OF HYDRAULIC SOIL STABILIZERS. <br />ALL EROSION AND SEDIMENT CONTROL MEASURES SHOWN ON THE PLANS OR <br />IMPLEMENTED IN THE FIELD SHALL BE IN ACCORDANCE WITH THE CITY AND <br />NPDES PHASE II PERMIT REQUIREMENTS, AND THE MPCA'S "PROTECTING WATER <br />QUALITY IN URBAN AREAS BEST MANAGEMENT PRACTICES FOR MINNESOTA." <br />THE CONTRACTOR SHALL PAY SPECIAL ATTENTION TO ALL ADJACENT PROPERTY <br />LINES AND MAKE SURE THE EROSION CONTROL PRACTICES INPLACE IN THOSE <br />AREAS PREVENT MIGRATION OF SEDIMENT ONTO ADJACENT PROPERTIES. <br />THE CONTRACTOR SHALL MAINTAIN SILT FENCE, INCLUDING THE REMOVAL OF <br />ACCUMULATED SEDIMENT, THROUGH COMPLETION OF BUILDING CONSTRUCTION. <br />SILT FENCE TO BE REMOVED ONLY AFTER COMPLETION OF BUILDING <br />CONSTRUCTION AND UPON ESTABLISHMENT OF VEGETATION. <br />THE CONTRACTOR SHALL PROVIDE WOOD FIBER BLANKET FOR ALL AREAS OF <br />CONCENTRATED FLOW AND FOR ALL SLOPES 3:1 OR GREATER. <br />PROTECT ALL STORM WATER MANAGEMENT FACILITIES FROM CONSTRUCTION <br />RUN—OFF. CONTRACTOR TO INSTALL AND CONSTRUCT SAID FACILITIES ONCE <br />SITE HAS BEEN STABILIZED. <br />IF ANY SLOPES APPEAR TO BE FAILING, THE CONTRACTOR SHALL PROVIDE <br />ADDITIONAL SILT FENCE, BIOROLLS AND EROSION CONTROL BLANKET AS NEEDED. <br />THE CONTRACTOR SHALL FINAL GRADE SWALE AREAS UPON STABILIZATION OF <br />UPSTREAM AREAS. <br />UPON GRADING COMPLETION THE CONTRACTOR SHALL PROVIDE NATIVE TOPSOIL, <br />SEED, AND MULCH ANCHORED WITH A STRAIGHT SET DISC WITHIN 48 HOURS OF <br />FINAL GRADING. <br />EXCESS SOIL SHOULD BE TREATED LIKE OTHER EXPOSED SOIL AND STABILIZED <br />WITHIN 72 HOURS. ANY SOIL STOCKPILES ARE TO HAVE SILT FENCE PLACED ON <br />DOWNSTREAM SIDES AND SHALL NOT BE PLACED IN SURFACE WATERS. <br />ADJACENT STREETS SHALL BE KEPT CLEAN OF CONSTRUCTION MATERIALS, DIRT, <br />AND OTHER UNDESIRABLE MATERIALS. WHEN MATERIALS OR DEBRIS HAVE <br />WASHED/FLOWED ONTO ADJACENT STREETS, IT IS THE CONTRACTOR'S <br />RESPONSIBILITY TO SWEEP/SCRAPE STREETS AS NECESSARY OR AS DIRECTED BY <br />THE CITY. <br />MAP OF SURFACE WATERS <br />MARSHAN LAKE IS AN IMPAIRED WATER. <br />ASSESSMENT UNIT: 02-0007-00 <br />IMPAIRMENTS: NUTRIENT/EUTRIFICATION <br />BIOLOGICAL INDICATORS <br />RICE LAKE IS AN IMPAIRED WATER. <br />ASSESSMENT UNIT: 02-0008-00 <br />IMPAIRMENTS: NUTRIENT/EUTRIFICATION <br />BIOLOGICAL INDICATORS <br />C.1 DURING CONSTRUCTION <br />A. ALL EXPOSED SOIL AREAS MUST BE STABILIZED AS SOON AS POSSIBLE TO LIMIT SOIL EROSION BUT <br />IN NO CASE LATER THAN SEVEN (7) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT PORTION OF <br />THE SITE HAS TEMPORARILY OR PERMANENTLY CEASED. <br />B. TEMPORARY SEDIMENT BASIN REQUIREMENTS DESCRIBED IN PART III.B.1-5 MUST BE USED FOR <br />COMMON DRAINAGE LOCATIONS THAT SERVE AN AREA WITH FIVE (5) OR MORE ACRES DISTURBED AT <br />ONE TIME. <br />C.2. POST CONSTRUCTION. <br />THE WATER QUALITY VOLUME THAT MUST BE TREATED BY THE PROJECT PERMANENT STORMWATER <br />MANAGEMENT SYSTEM DESCRIBED IN PART III.C. SHALL BE ONE (1) INCH OF RUNOFF FROM THE NEW <br />IMPERVIOUS SURFACES CREATED BY THE PROJECT. WHERE SITE CONDITIONS ALLOW, AT LEAST i� INCH <br />OF WATER QUALITY VOLUME MUST BE INFILTRATED. SEE PART 111.0.2 FOR MORE INFORMATION ON <br />INFILTRATION DESIGN AND APPROPRIATE SITE CONDITIONS. IF IT IS DETERMINED THAT SITE CONDITIONS <br />ARE NOT APPROPRIATE FOR INFILTRATION (E.G. LACK OF 3 FT. OF SEPARATION TO SEASONALLY <br />SATURATED GROUND WATER, PROXIMITY TO BEDROCK, CONTAMINATED SOILS) THE REASONS SHOULD BE <br />DOCUMENTED IN THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) FOR THE PROJECT. <br />INFILTRATION IS NOT REQUIRED IN HYDROLOGIC SOIL GROUP D SOILS. <br />STORM WATER POLLUTION PREVENTION PLAN <br />TURNBERRY CROSSING 2ND ADDITION <br />DRAWN BY: <br />C.M. <br />DESIGN BY: <br />C.W.P. <br />CHCKD BY: <br />C.W.P. <br />PROJ. NO. <br />15-1536 <br />ORIGINAL DATE: <br />MARCH 4, 2015 <br />REVISION DESCRIPTION <br />w <br />1- <br />0 <br />if) <br />m <br />0) <br />w <br />aa) o <br />U O <br />7:3E>.m <br />E <br />>, U <br />= J <br />2 = >, <br />r o' <br />O <br />Z <br />J <br />03.04.2015 <br />w <br />1- <br />0 0 <br />TURNBERRY CROSSING <br />2ND ADDITION <br />LINO LAKES, MINNESOTA <br />PREPARED FOR: <br />HOKANSON <br />CONSTRUCTION <br />SITE PLANNING <br />& ENGINEERING <br />PLOWS <br />ENGINEERING, INC. <br />6776 LAKE DRIVE <br />SUITE 110 <br />LINO LAKES, MN 55014 <br />PHONE: (651) 361-8210 <br />FAX: (651) 361-8701 <br />C3.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.