Laserfiche WebLink
EXHIBIT A <br />Electrical Permit and Inspection Fees <br />Services, Generators, Feeders to Separate Structures and Other Power Supply Resources <br />0 ampere to and including 200 ampere capacity <br />$45.00 <br />Each additional 100 amps or fraction thereof an additional <br />$15.00 <br />Circuits, Feeders, Feeder Taps or Sets of Transformer Secondary Conductors <br />0 amps to and including 30 amp capacity <br />$8.00 <br />31 amps to and including 100 amp capacity <br />$10.00 <br />Each additional 100 asps or fraction of an additional <br />$5.00 <br />One — Family dwelling and each unit of two — family dwelling - Up to including 200 amps services (includes <br />up to 3 inspections) <br />Multifamily dwellings each unit (up to 20 circuits and feeder) at <br />$100.00 <br />Each existing circuits or feeders reconnected to replacement panels (new or extended circuits or feeders <br />at the .above fees) <br />$3.00 <br />Electrical supply for each manufactured home park lot <br />$45.00 <br />Recreational vehicle site, electrical supply equipment each including factory installed <br />$10.00 <br />Street, parking lot or outdoor area lighting standards, and traffic signal standard each <br />$8 00 <br />Transformers For Lighting, Heat and Power <br />Up to and including 10 kilo -volt amps each <br />$20.00 <br />Over 10 kilo -volt amps each <br />$40.00 <br />Transformers and electronic power supplies for electric signs and outline lighting each <br />$8.00 <br />Swimming pool bonding inspection (each separate inspection) Bonding conductors and connections <br />require inspection before concealed. <br />$45`00 <br />Retrofit lylodifications to existing lighting fixtures each <br />$0.50 <br />Transient Projects- Power supply fee as identified above, plus I hour <br />$00.00 <br />Each attraction or concession inspection <br />$45.00 <br />Special inspection or inspections not covered by above fee is $00.001 hr plus mileage at the rate <br />established by the IRS <br />$00.00 <br />Re -inspection fee when inspection is necessary to determine whether the unsafe conditions have been <br />corrected a fee will be assessed by the inspector <br />$45"00 <br />Minimum Fee Per Trip <br />$45.00 <br />All fees are subject to State of MN surcharge Fees of <br />$5.CSC <br />Total Of All Fees <br />*Electrical work commenced without filing the required permit, in addition to the permit fee, shall pay $75 or two times the permit fee (which ever is greater) <br />not to exceed $1000.00. *For purposes of interpretation, Minnesota Rules, Chapter 3000, and the most recently adopted edition of the National Electric <br />Code shall be prima facie evidence of the definitions, interpretations, and scope of words and terms used. <br />