My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2008-013 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2008
>
2008-013 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2015 1:07:28 PM
Creation date
7/16/2015 12:37:08 PM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
11/24/2008
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Other Inspections and Fees: <br />1. Work commencing before permit issuance Double Permit Fee <br />`-� 2. Erosion Control Inspection Fee (single, two-family, townhomes up to 8 units) <br />Multi -family > 8 units, Commercial, Industrial and Institutional determined <br />by separate agreement. <br />3. Erosion Control Reinspection Fee <br />4. Inspections outside of normal business hours <br />5. Reinspection fee <br />6. Inspections for which no fee is specifically designed <br />7. Additional plan review required by changes, additions, or revisions <br />8. For use of outside consultants for plan checking and inspections, or both <br />9. In Ground Swimming Pool <br />10. Above Ground Swimming Pool <br />11. Plan Review Fee <br />a. 65% of the Building Permit Fee <br />b. 25% of the Building Permit Fee for review of similar plans (Master Plan) in a 12 month period <br />13. Easement Encroachment Fee $55.00 <br />14. Fence Permit $50.00 <br />15. Roofing Permit $100.00 <br />16. Siding Permit $100.00 <br />17. Replacement Windows/Door Permit $100.00 <br />18. Retaining Wall Permit $50.00 <br />19. All Residential Mechanical Permits, (except new construction and air conditioning $50.00 <br />20. Residential New Construction Mechanical Permit $60.00 <br />21. Residential Air Conditioning Permit .1 % of the contract price ($50.00 minimum fee) <br />22. Commercial Mechanical Permit 1% of the contract price ($50.00 minimum fee) <br />23. Manufactured Home Permits $90.00 <br />24. Plumbing Permit $9.00 per fixture ($15.00 minimum fee) <br />25. Sewer Connection Fee $200.00 <br />23. Water Connection Fee $250.00 <br />$150.00 <br />$50.00 per trip <br />$50.00 per hour* <br />$50.00 per trip <br />$50.00 per trip <br />$50.00 per hour** <br />Actual Cost*** <br />$141.00 <br />$50.00 <br />24. Contractor License Verification $5.00 per permit <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.