Laserfiche WebLink
25. Contractor License $50.00 <br />26. SAC (Sewer Availability Charge) per Met Council <br />.--. 27. 3/" Water Meter $165.00 <br />28. 1" Water Meter $325.00 <br />29. MXU Unit $125.00 <br />30. Septic Installation or Repair Permit $150.00 <br />31. Septic Pumping Permit $5.00 <br />32. Demolition Permit $50.00 <br />33. Lawn Sprinkler/Irrigation System Permit (effective June 26, 2008) $50.00 <br />34. Irrigating or Watering of New Landscaping Permit (sod or seed) (effective June 26, 2008) .no charge <br />35. Lawn Sprinkling Violation <br />$25.00 for first violation; <br />36. Driveway Replacement Permit <br />$50.00 for each subsequent citation <br />$50.00 <br />Fee Refund — Per applicant request, City staff may refund permit fees up to 80% for voided permits. Plan <br />review fees and state surcharge fees are non-refundable. <br />All permits issued are subject to applicable State surcharge fees. <br />* <br />** <br />Inspections made out side of normal business hours is a three-hour minimum charge <br />Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />* * * Actual costs include administrative and overhead costs. <br />Sign Permit -Temporary (portable/banner) $25 .00/Term <br />Sandwich Board $25.00 <br />Touch Pad ..$20.00 <br />Curb Stop Covers $68.00 <br />An escrow may be required, as determined by the City Engineer, to cover all costs incurred by the City for plan <br />revision and construction observation. <br />ESCROW DEPOSITS <br />In order to obtain a Certificate of Occupancy, escrow deposits shall be collected if exterior work cannot be <br />completed due to inclement weather, as determined by City Staff, whereupon a Temporary Certificate of <br />Occupancy would be issued subject to the execution of an escrow agreement and payment thereof. Any <br />unfinished work must be completed within six months (weather permitting) from the date of issuance. The <br />following escrow amounts are hereby established: <br />..-- a. Driveway - $1,000.00 <br />b. Exterior Concrete - $1,000.00 <br />5 <br />