Laserfiche WebLink
c. As -built Surveys - $1,000.00 <br />d. Stucco (final coat only) - $1,000.00 <br />e. Garage Floor - $1,000.00 <br />f. Landscaping - $2,500.00 (landscaping may be escrowed year-round per City Staff) <br />Escrow deposits include a $50.00 non-refundable administrative fee. <br />Escrow deposits can be submitted through one of the following procedures: <br />a.) Escrow can be paid to the City upon execution of an agreement signed by both the payee and the City. <br />b.) The title company or lending institution can hold the escrow upon execution of an agreement signed by <br />both the title company or lending institution and the City. <br />RIGHT-OF-WAY MANAGEMENT <br />Excavation Permit Fees <br />Hole (includes administration, plan review, inspection, testing and mapping) $125.00 <br />Trench (includes administration, plan review, inspection, testing & mapping) .,..$70.00 per 100 lineal feet <br />plus hole fee <br />Obstruction Permit Fee (includes administration, recording, review & inspection) $50.00 plus $.05 per <br />lineal foot <br />Permit Extension Fee (includes administration, recording & review) ..$55.00 <br />Delay Penalty $60.00 <br />�-- for up to three days of non -completion and non -prior notice before specified date. <br />After three days an additional charter of $10.00 per day will be levied <br />Degradation Fee Formula: <br />This formula covers degradation for depreciation caused by intrusion into the right-of-way. The <br />depreciation applies to the original surface of the right-of-way and to the overlays and seal -coats applied to the <br />surface. The formula includes life expectancy schedules for each and has an estimated cost per square yard based <br />on the quality of the right-of-way surface required for different levels of traffic. This formula creates a degradation <br />fee which is determined by the cost per square yard for street, overlay, and seal -coat, ultiplied by the depreciation <br />schedule, multiplied by the area of the street patch. <br />Degradation Fee: (cost per square yard for street overlay, and seal -coat x depreciation schedule rates) x area of <br />street patch = degradation fee. <br />UTILITY FEES <br />Sewer Rate $52.00/Quarter/Reu+$1.00 Per 1000 Gallons <br />Over 10,000 Gallons <br />Water Meter Rental $400.00 (Deposit) / $25 Per Month <br />Additional Accessories $25.00 Per Month <br />Water Usage Fees <br />6 <br />$10.00 Per Quarter / Reu <br />$1.77 Per Thousand Gallons (0 — 30,000 Gal.) <br />$2.07 Per Thousand Gallons (Over 30,000 Gal.) <br />