Laserfiche WebLink
Exhibit "A" <br />Building Permit Fee Schedule <br />_ __ _____ Total Valuation <br />Fee <br />$1.00 to $500.00 <br />$23.50 <br />$501.00 to $2,000.00 <br />$23.50 for the first $500.00 plus $3.05 for each <br />additional $100.00, or fraction thereof, to and <br />including $2,000.00 <br />$2,001.00 to $25,000.00 <br />$69.25 for the first $2,000.00 plus $14.00 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $25,000.00 <br />$25,001.00 to $50,000.00 <br />$391.25 for the first $25,000.00 plus $10.10 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $50,000.00 <br />$50,001.00 to $100,000.00 <br />$643.75 for the first $50,000.00 plus $7.00 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $100,000.00 <br />$10.0,001.00 to $500,000.00 <br />$993.75 for the first $100,000.00 plus $5.60 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $500,000.00 <br />$500,001.00 to $1,000,000.00 <br />$3,233.75 for the first $500,000.00 plus $4.75 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $1,000,000.00 <br />$1,000,001.00 and up <br />$5,608.75 for the first $1,000,000.00 plus $3.15 for <br />each additional $1,000.00, or fraction thereof <br />Other Inspections and Fees: <br />1. Inspections outside of normal business hours $47.00 per hour* <br />2. Reinspection fee $47.00 per trip <br />3. Inspections for which no fee is specifically designed $47.00 per trip <br />4. Additional plan review required by changes, additions, or revisions $47.00 per hour** <br />5. For use of outside consultants for plan checking and inspections, or both Actual Cost*** <br />6. Plan Review Fee <br />a. 65% of the Building Permit Fee <br />b. In instances where two (2) or more permits are issued for a residential structure, the plan review fee <br />shall be forty percent (40%) per dwelling unit. <br />7. Escrow Fees <br />An escrow fee in the amount of $1,500.00 shall be paid before a building permit is issued for all new buildings. <br />The escrow fee shall be returned to the permit applicant, without interest, upon successful completion of the <br />following: <br />a. Sod installation. <br />b. Curb stops must be raised to grade, in good condition and easily operable. Curb stops in driveways will <br />have a driveway cover, available at the Public Works Department, or an approved alternate. Damaged <br />curbing will be replaced as necessary. <br />c. Phone read must be installed. <br />d. All utility bills must be paid by the permit applicant up to the closing of the home. <br />e. As built survey must be submitted and approved by City Engineer. <br />