Laserfiche WebLink
These items need to be completed within six (6) months of the issuance of the certificate of occupancy <br />(weather permitted). If the builder has not called for the escrow inspection by six months, the city will <br />automatically do the inspections. Once the request for an inspection has been made, the city will return the <br />escrow within 30 days after last inspection has passed <br />8. Easement Encroachment Fee $30.00 <br />9. Fence Permit $30.00 <br />10. Sign Permit Fee Table <br />11. All Residential Mechanical Permits, (except new construction and air conditioning $25.00 <br />12. Residential New Construction Mechanical Permit $60.00 <br />13. Residential Air Conditioning Permit 1% of the contract price ($15.00 minimum fee) <br />14. Commercial Mechanical Permit 1% of the contract price ($25.00 minimum fee) <br />15. Manufactured Home Permits $90.00 <br />16. Plumbing Permit $9.00 per fixture ($15.00 minimum fee) <br />17. Sewer Connection Fee $100.00 <br />18. Water Connection Fee $125.00 <br />19. Contractor License Verification ... $5.00 per permit <br />20. SAC (Sewer Availability Charge) per Met Council <br />21.3/x" Water Meter $29000 <br />22. 1" Water Meter $325.00 <br />23. MXU Unit $125.00 <br />24. Septic Installation or Repair Permit $75.00 <br />25. Septic Pumping Permit $5.00 <br />*Inspections made out side of normal business hours is a three-hour minimum charge <br />**Or the total hourly cost to the jurisdiction, whichever is greatest. This cost shall include supervision, <br />overhead, equipment, hourly wages, and fringe benefits of the employees involved. <br />***Actual costs include administrative and overhead costs. <br />