My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2003-004 Council Ordinances
LinoLakes
>
City Council
>
City Council Ordinances
>
2003
>
2003-004 Council Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2015 10:02:00 AM
Creation date
7/20/2015 8:09:51 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Meeting Date
02/24/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1005: FINAL PLAT <br />1005-1 FILING AND REQUIREMENTS FOR APPLICATION <br />Approval of a preliminary plat by the City Council is an acceptance of the general layout, as <br />submitted, and indicates that the developer may proceed toward final plat approval in accordance <br />with the City Council approval of the preliminary plat, including conditions and the City growth <br />management standards. <br />A complete application for final plat shall be submitted no later than one (1) year after the date of <br />approval of the preliminary plat, or a time as provided in the developers agreement. Otherwise, the <br />preliminary plat approval shall be considered void, unless an extension is requested in writing, and <br />for good cause, is granted by the City Council. <br />The final plat applications for subsequent phases, as described by the approved phasing plan, shall <br />be submitted within one (1) year of approval of the final plat for the previous phase. An extension <br />may be requested in writing for City Council approval. <br />In considering time extensions for final plat submittals, the City Council shall consider the reasons <br />for the extension. If the developer is unable to fulfill the schedule of the approved phasing plan, the <br />City Council may consider allocating to a different development project the MUSA that was <br />committed to the next phase of the plat. The subject plat would then wait until the following year <br />for final plat or MUSA approval for its next phase. <br />The final plat application shall have incorporated all the conditions of City Council approval of the <br />preliminary plat. In all other respects, the final plat shall substantially conform to the preliminary <br />plat. It may constitute only that portion of the approved preliminary plat which the developer <br />proposes to record and develop at that time, provided that such portion conforms with all the <br />requirements of this Ordinance. <br />Approval of the engineering specifications required by this Ordinance pertaining to water supply, <br />drainage, domestic waste water, potable water, street lighting, gas and electric service, grading, <br />roadway standards, widths, and surfacing of streets, shall be completed by the Community <br />Development Department and appropriate development contracts prepared prior to approval of the <br />final plat by the City Council. <br />1005-1-1 Information Required for Final Plat <br />1. The City may require five (5) large scale copies (22" by 34") and one (1) <br />reproducible reduction at 11" by 17" and one electronic copy in a format compatible <br />1005.1 <br />Lino Lakes <br />Subdivision Ordinance Final Plat <br />
The URL can be used to link to this page
Your browser does not support the video tag.