Laserfiche WebLink
• <br />CITY COUNCIL <br />AGENDA ITEM 6A <br />STAFF ORIGINATOR: Michael Grochala <br />MEETING DA1E: March 9, 2015 <br />TOPIC: Public Hearing, Consider Resolution No. 15-25, Accepting Part II <br />of Wellhead Protection Plan and Authorization to Submit to Dept. <br />of Health <br />VOTE REQUIRED: 3/5 <br />INTRODUCTION <br />Staff will present information for the public hearing and is requesting City Council acceptance <br />of Part II of the Wellhead Protection Plan (WI -IPP) and authorization for the submittal to the <br />Minnesota Department of Health (MDH). <br />BACKGROUND <br />The preparation of the City's WHPP is a requirement of Minnesota Rules 4720.5100 to <br />4720.5590. The goal of the Plan is to prevent human -caused contaminants from entering the <br />water supply wells and to protect all who use the water supply from adverse health effects <br />associated with groundwater contamination. These Plans fall under the jurisdiction of the <br />MDH and consist of two parts (Part 1 and Part 2). <br />Part 1 <br />Part 1 of Lino Lake's W1 -IPP was approved by MDH in December 2013. Part 1 is a technical <br />exercise that uses groundwater modeling to delineate the wellhead protection area (WHPA), <br />Drinking Water Supply Management Area (DWSMA) and includes a well and aquifer <br />vulnerability assessment. Part 1 addresses the five municipal water supply wells used by the <br />City (Wells No. 1, 2, 3, 4, and 5) and the associated source water aquifers (the Prairie du Chien <br />and Jordan -the aquifers from which the municipal wells pump water). Portions of the <br />DWSMA extend into the cities of Hugo, Circle Pines, arid Centerville. <br />Part 2 <br />Part 2 of the WHPP describes how the results of the Part 1 can be applied to best protect a <br />community's water supply. The scope of Part 2 included: <br />• Evaluation of several data elements including physical environment, land use, public <br />utilities, water quantity, and water quality; <br />• Inventory of potential contaminants; and <br />• Preparation of a management portion of the plan. <br />Data elements were collected and interpreted, impacts of changes in land and water use were <br />assessed, and issues, problems, and opportunities were identified and included in the WI -IPP. A <br />