Laserfiche WebLink
1A-1 Excavating, Inc. <br />'Total Price <br />o <br />0 <br />0 <br />0 <br />0 <br />Et- <br />69 <br />$3,250.001 <br />0 <br />0 <br />6 <br />0 <br />c0 <br />05 <br />Eft <br />$18,300.001 <br />0 <br />0 <br />6 <br />r- <br />Lo <br />ta <br />$3,240.001 <br />0 <br />00 <br />00 <br />0 <br />In <br />6 <br />CA <br />EA <br />0 <br />co <br />CO <br />6 <br />CV <br />EA <br />$28,420.001 <br />$800.001 <br />o <br />0 <br />6 <br />0 <br />C4 <br />4 <br />CV <br />69. <br />o <br />o <br />6 <br />o <br />CO <br />)N <br />0 <br />o <br />0 <br />6 <br />EtE- <br />CO <br />E- <br />69 <br />'Schedule C - Storm Sewer Improvements <br />0 <br />000000000 <br />000000000 <br />o <br />_ <br />69 <br />0 <br />o <br />0 <br />CV <br />0 <br />0 <br />0 <br />CD <br />,,•- <br />0 <br />0 <br />0 <br />c.,, <br />0U <br />0 <br />0 <br />0 <br />0 <br />N- <br />ft0 <br />o <br />0 <br />LO <br />0 <br />0 <br />E- <br />Ea <br />$28,420,001 <br />'Schedule D - Surface Improvements 1 <br />0 <br />0000000000 <br />0000000000 <br />o <br />0 <br />CD <br />o <br />0 <br />0 <br />CO' <br />EA <br />o <br />0 <br />C) <br />69 <br />o <br />0 <br />CO <br />CA <br />69 <br />o <br />1.0 <br />N- <br />.EI: <br />EA <br />0 <br />0 <br />Lo <br />0.1- <br />V- <br />CA <br />0 <br />0 <br />c> <br />6 <br />E- <br />0 <br />0 <br />0 <br />0 <br />N- <br />CV <br />EA <br />0 <br />CV <br />69 <br />[Unit Price <br />00000 <br />CD <br />6 <br />o <br />0 <br />CV- <br />6 <br />0 <br />o <br />C5 <br />6 <br />0 <br />6 <br />0 <br />CO <br />06 <br />6 <br />0 <br />6 <br />0 <br />E- <br />0- <br />6 <br />0 <br />r--: <br />(0 <br />69 <br />$54.00 <br />$55.00 <br />c) <br />0 <br />6 <br />r- <br />Eft <br />0 <br />0 <br />6 <br />0) <br />EA <br />0 <br />0 <br />o <br />Et <br />69 <br />0 <br />0 <br />..-* <br />A- <br />0 <br />0 <br />0 <br />6 <br />CD <br />0) <br />E- <br />69 <br />0000 <br />0000 <br />6 <br />069. <br />o <br />6 <br />0 <br />0000L$ <br />00.0Z$ <br />0000 <br />0000 <br />66 <br />6 <br />0 <br />E-- <br />EA <br />$13,650.001 <br />0 <br />C> <br />o <br />0 <br />CD <br />0 <br />0 <br />6 <br />0 <br />0 <br />6 <br />0 <br />C, <br />6 <br />el <br />EA <br />0 <br />0 <br />6 <br />0 <br />LO <br />csi <br />0 <br />0 <br />r•.- <br />69 <br />$10.00 <br />$27.00 <br />E- <br />0 <br />6 <br />1Dresel Contracting, Inc. <br />'Total Price <br />8 <br />c <br />C, <br />c0 <br />Eft <br />CV <br />tftE- <br />0 <br />0 <br />c <br />CO <br />N-- <br />64 <br />0 <br />0 <br />ci <br />c0 <br />0 <br />E- <br />0ft <br />$720.00 <br />$2,064.00 <br />$30,842.00 <br />0 <br />0 <br />0 <br />0 <br />6 <br />CA <br />a) <br />04 <br />0 <br />c0 <br />0 <br />6 <br />CV <br />N <br />0 <br />0 <br />6 <br />Et <br />0 <br />E-- <br />EA <br />0 <br />0 <br />6 <br />0 <br />c0 <br />Ea <br />$153,029.901 <br />cr:, <br />0 <br />N <br />CA <br />0 <br />c0 <br />.,- <br />$372.00 <br />$3,417.60 <br />00 <br />ft <br />0 <br />0 <br />OD <br />0 <br />o <br />0 <br />0) <br />(e <br />8 <br />. <br />o <br />LO <br />0 <br />6 <br />0 <br />8 <br />6 <br />00) <br />CV <br />6 <br />0 <br />.--. <br />$1,092.001 <br />0 <br />(0 <br />6 <br />N <br />E- <br />0 <br />0 <br />4 <br />(0 <br />0) <br />00 <br />0 <br />6 <br />E- <br />CV <br />0 <br />0 <br />000 <br />0 <br />1.0 <br />E.- <br />0 <br />$8,910.00 <br />$13,590.00 <br />$25,420.00 <br />Unit Price <br />0 <br />0 <br />0 <br />0 <br />4 <br />CV <br />6 <br />CD <br />0 <br />6 <br />CV <br />co <br />qE- <br />0 <br />0 <br />6 <br />0 <br />N.. <br />.. <br />r- <br />0 <br />0 <br />0 <br />0 <br />CO <br />co <br />. <br />CO <br />tia <br />$72.00 <br />$3440 <br />$44.06 <br />CO <br />CV <br />6 <br />(0 <br />CA <br />0 <br />LO <br />c‘i <br />a) <br />EA <br />0 <br />0 <br />6 <br />co <br />0 <br />0 <br />N <br />CO <br />6s <br />0 <br />0 <br />6 <br />o <br />EI- <br />CV <br />EA <br />0 <br />0 <br />6 <br />CO <br />d <br />Et <br />c.i <br />,-.- <br />EA <br />$4.65 <br />$7.44 <br />$854.40 <br />$945.60 <br />$43.80 <br />$48.001 <br />0 <br />0 <br />6 <br />co <br />ea <br />0 <br />0 <br />0 <br />0 <br /><V <br />0 <br />EA <br />0 0 <br />0 <br />0 <br />co <br />N <br />CJ <br />EA <br />0 <br />CA <br />N. <br />- <br />,-. <br />EA <br />Et <br />Et . <br />,-- <br />6 <br />CV <br />0.1 <br />0.1 <br />6 <br />0 <br />0 <br />CO <br />6 <br />$8.91 <br />$13.59 <br />$12.71 <br />[Engineers Estimate <br />'Total Price <br />0 <br />0 <br />6 <br />P <br />0 <br />6- <br />6 <br />0 <br />0 <br />6 <br />0 <br />0 <br />o <br />0 <br />0 <br />0 <br />6 <br />t.,-,- <br />3. <br />1 $18.000.001 <br />0 0 0 <br />00000000 <br />6 6 6 <br />,n CV CD <br />cA CY) to <br />.-• -4 <br />0)cNi <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />CV <br />6 <br />C'46 <br />0 <br />CD <br />0 <br />0 <br />09 <br />E') <br />0 <br />0 <br />0 <br />a) <br />6 <br />0 <br />0 <br />0 <br />0- <br />6 <br />6 <br />$135,270.00 <br />0 <br />00000000 <br />0 <br />0 <br />~ <br />0 <br />0 <br />0 <br />C9 <br />ta <br />CD 0 0 <br />0 6 0 <br />0 0 0 <br />El. N 0 <br />6 6 <br />0 0 <br />0 0 <br />0 0 <br />0 <br />0 <br />0 <br />0 <br />100.000Es <br />o <br />o <br />6 <br />0 <br />csi <br />0 <br />0 <br />c) <br />0 <br />0 <br />0 <br />.„.- <br />.<- <br />EA <br />0 0 <br />c) 0 <br />0 0 <br />0 0 <br />CO CO <br />ta 6 <br />o <br />0 <br />0 <br />0 <br />E- <br />6 <br />o <br />o <br />6 <br />0 <br />0 <br /><,..; <br />6 <br />o <br />o <br />0 <br />0 <br />0 <br />cr; <br />6 <br />0 <br />o <br />0 <br />0 <br />0 <br />r„...- <br />co <br />69 <br />$18,000.00 <br />$15,000.00 <br />$20,000.00 <br />[Unit Price <br />$1,750.00 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />EA <br />0 <br />o <br />0 <br />0 <br />0 <br />6 <br />o <br />0 <br />0 <br />EA <br />0 0 CD <br />0 CD 0 <br />6 c‘i 6 <br />co co 0) <br />EA 69 0 <br />0 <br />0 <br />6 <br />6 <br />0 <br />0 <br />CD <br />6 <br />6 <br />Eft <br />0 <br />CD <br />6 <br />v. <br />69 <br />$4.00] <br />0 <br />0 <br />6 <br />c) <br />LO <br />CV- <br />69 <br />0 <br />000000000 <br />6 <br />0 <br />o <br /><- <br />Eft <br />0 CD 0 <br />6 6 6 <br />.,.- ,-- 0 <br />69 EA 0 <br />„._-• <br />0 <br />0 0 <br />0 <br />LO <br />0 <br />0 <br />6 <br />LO <br />CV <br />0 <br />0 <br />0 <br />0 <br />0 <br />Et- <br />'- <br />EA <br />0 <br />0 <br />6 0 <br />0 0 <br />0 <br />.,_ <br />EA <br />0 <br />c) <br />0 <br />E- <br />0 <br />0 <br />o <br />tri <br />EA <br />0 <br />o <br />6 <br />69 <br />0 <br />o <br />6 <br />E- <br />69 <br />$18.00 <br />$15.00 <br />$10.00 <br />>, <br />C <br />co <br />0 <br />0 <br />CV <br />CA <br />CD 0 0 <br />0 CD <br />I,- <br />CD <br />co <br />CA <br />0 <br />or <br />CV <br />0 <br />CV <br />0 <br />0 <br />04 <br />CV <br />CV <br />1 Total Schedule B - Watermain Improvement <br />0 <br />0 0 V' <br />Et 0 <br />c0 <br />CVE- <br />Total Schedule C - Storm Sewer Improvement <br />Nt• Nr. <br />0 0 <br />0 <br />E- <br />0 <br />0 <br />CO <br />0 <br />0 <br />0) <br />E- <br />0 <br />0 <br />0 <br />CV <br />0 CD 0 <br />0 0 0 <br />0 0 0 <br />CV <br />ci) <br />:•-• <br />D <br />= <br />0 <br />111 <br />= <br />0 <br />1.1J <br />WW <br />I <br />0 <br />_J _1 -J <br />_J <br />_I <br />CA <br />_J <br />1 <br />0 <br />W <br />(j)U>0<<LL <br />JW <br />11 <br />Z 0 <br />H W <br />0 <br />W <br />LL>-- <br />0 <br />_I<<_JO)_10000 <br />11J 11.1 <br />M M <br />0 0 <br />u_ <br />>- <br />u_ <br />>- <br />>- >- >- <br />Project: 02029-86 - LINO - Birch Street Sanitary Sewer Extension and Turn Lane Construction <br />E <br />18" GATE VALVE & BOX <br />12" GATE VALVE & BOX <br />16" GATE VALVE & BOX <br />HYDRANT ASSEMBLY <br />4" WATERMAIN DUCTILE IRON CL 52 <br />6" WATERMAIN DUCTILE IRON CL 52 <br />8" WATERMAIN DUCTILE IRON CL 52 <br />12" WATERMAIN DUCTILE IRON CL 52 <br />16" WATERMAIN DUCTILE IRON CL 52 <br />I4" POLYSTYRENE INSULATION <br />1DUCTILE IRON FITTINGS <br />IYARD HYDRANT <br />MOBILIZATION <br />REMOVE SEWER PIPE (STORM) <br />GEOTEXTILE FABRIC TYPE III <br />GRANULAR FOUNDATION AND/OR BEDDING <br />18" RC PIPE APRON <br />SAFETY GRATE FOR 18" RC APRON <br />18" RC PIPE SEWER DES 3006 CL III <br />SALVAGE AND REINSTALL STORM PIPE <br />RANDOM RIPRAP CLASS III <br />MOBILIZATION 1 <br />CLEARING <br />GRUBBING <br />REMOVE CURB & GUTTER <br />REMOVE BITUMINOUS PAVEMENT <br />SAWING BITUMINOUS PAVEMENT <br />COMMON EXCAVATION (P) <br />SUBGRADE EXCAVATION <br />SELECT GRANULAR BORROW (CV) <br />COMMON BORROW(CV) <br />12504.602 <br />2504.602 <br />2504.602 <br />2504.602 <br />12504.603 <br />2504.603 <br />2504.603 <br />2504.603 <br />2504.603 <br />2504.604 <br />2504.608 <br />92504.602 <br />000 <br />0 <br />2104.501 <br />2105.604 <br />2451.609 <br />2501.515 <br />2501.602 <br />2503.541 <br />2506.602 <br />2511 501 <br />2021.501 <br />2101.501 <br />2101 506 <br />0 <br />10 <br />0 <br />cv <br />2104.505 <br />(E) <br />E- <br />10 <br />. <br />o <br />oi <br />E-- <br />0 <br />(4) <br />. <br />o <br />2105.507 <br />2105.522 <br />2105.523 <br />6 <br />Z <br />E <br />a> <br />— <br />co <br />CA <br />4 <br />CV <br />to <br />04 <br />N- co 0) <br />CV O.1 CV <br />p <br />CA <br />.,..- <br />CA <br />04 <br />CA <br />cA <br />cA <br />CO <br />CO <br />c0 Cr) <br />CA cr) cA <br />0 <br />-Et <br />4 <br />Et <br />4 <br />LO <br />4 <br />00 <br />as <br />4 <br />LC) <br />irl <br />