Laserfiche WebLink
• <br />• <br />Contract No.: <br />,c; c <br />a c 0 <br />t5Q <br />o <br />u <br />e 5 2 <br />65 0 0 <br />cn <br />E <br />0 <br />ta. <br />CO <br />03 <br />04 <br />oj <br />c <br />c <br />• : <br />t; <br />•—cu <br />2 3 <br />a 0 <br />ta 2 <br />a <br />-1 ta <br />0 0 <br />04 <br />4..) <br />C c <br />cu — <br />= <br />0 w <br />0 <br />03 <br />1A-1 Excavating, Inc. <br />'Unit Price 'Total Price 11 <br />!Schedule A - Sanitary Sewer Improvements <br />0 <br />0 <br />0 <br />0 <br />CV <br />9 <br />0 <br />0 <br />0 <br />0 <br />0 <br />a <br />0 <br />c\i' <br />cO <br />0 <br />0 <br />0 <br />o <br />04 <br />r-: <br />9 <br />0 <br />0 <br />6 <br />CV <br />CO <br />6 <br />C \I <br />9 <br />0 <br />0 <br />6 <br />0 <br />T- <br />(-4 <br />9 <br />0 <br />0 <br />6 <br />0- <br />CO <br />,--- <br />9 <br />0 <br />0 <br />CD <br />o <br />0,1 <br />9 <br />0 <br />0 <br />0 <br />0,, <br />9 <br />c:a <br />CO <br />,- <br />9 <br />0 <br />C) <br />0 <br />9 <br />0 <br />•cr. <br />9 <br />0 <br />0 <br />0 <br />T- <br />04 <br />csi <br />T- <br />0 <br />0 <br />6 <br />CO <br />,- <br /><- <br />9 <br />0 <br />0 <br />6 <br />CZ <br />CD <br />b5 <br />0 <br />0 <br />0 <br />0 <br />0 <br />CV <br />s- <br />... <br />LC) <br />"Ct <br />9 <br />0 <br />0 <br />06 <br />, <br />Nr <br />T - <br />CV <br />CO <br />9 <br />!Schedule B - WatermainImprovements 1 <br />0 <br />0 <br />0 <br />0 <br />9 <br />0 <br />0 <br />0 <br />0 <br />9 <br />0 <br />0 <br />0 <br />0 <br />0 <br />9 <br />0 <br />0 <br />0 <br />0 <br />az <br />0 <br />0 <br />0 <br />0 <br />to <br />$1,400.001 <br />0 <br />0 <br />0,n <br />,o <br />0 <br />0 <br />03o <br />CD <br />9 . <br />CV <br />9 <br />CD <br />0 <br />0 <br />0 <br />o <br />CV <br />9 <br />0 <br />0 <br />o <br />0 <br />CO <br />9 <br />0 <br />0 <br />6 <br />04 <br />.- <br />9 <br />0 <br />0 <br />6 <br />0 <br />CO <br />1 $275.00 <br />0 <br />0 <br />0 <br />ij9 <br />0 <br />C) <br />o <br />9 <br />0 <br />0 <br />c‘i <br />U) <br />0 <br />0 <br />03 <br />CO <br />( <br />$116.001 <br />0 <br />00 <br />,-o <br />to <br />$500.00 <br />$475.00 <br />0 <br />000000 <br />0 <br />0 <br />9 <br />0 <br />o <br />(4) <br />9 <br />0 <br />0 <br />o <br />0 <br />CD <br />9 <br />0 <br />o <br />0 <br />9 <br />$1,400.00 <br />$1,550.00 <br />Dresel Contracting, Inc. 1 <br />Unit Price !Total Price <br />$11,700.001 <br />$372.00, <br />$492.00 <br />0 <br />0 <br />6 <br />o <br />Lo <br />CD <br />0 <br />6 <br />co <br />(4) <br />CD <br />0 <br />6 <br />co <br />co <br />9 <br />0 <br />0 <br />0 <br />0) <br />co <br />$14,953.20 <br />1$137.085.90 <br />0 <br />0 <br />6 <br />co <br />-4- <br />9 <br />0 <br />0 <br />to <br />0) <br />co <br />9 <br />$1,032.001 <br />0 <br />00 <br />r--: <br />0 <br />CD <br />9 <br />$4,200.00 <br />$25,839.05 <br />$214,846.95 <br />CD <br />00 <br />6 <br />0 <br />0 <br />9 <br />0 <br />6 <br />03 <br />T.- <br />$492.001 <br />0 <br />0 <br />0 <br />CO <br />0 <br />9 <br />0 <br />0 <br />0 <br />CV <br />0) <br />9 <br />$1,800.00 <br />$1,920.00 <br />0 <br />0 <br />6 <br />0 <br />N- <br />.,. <br />63 <br />0 CV <br />h 9 <br />r-: 4 <br />0 En. <br />CO> <br />1 $2,250.00 <br />0 <br />00 <br />('4 <br />•,-- <br />Cl <br />to <br />$24000 <br />$78.00 <br />CO CO <br />CD LO <br />(0r-: <br />.4- 0 <br />9 9 <br />0 <br />CV <br />‘--. <br />0 <br />0- <br />('4 <br />0) <br />0 <br />CV <br />0) <br />o <br />N- <br />0) <br />CV <br />0 <br />0 <br />.,- <br />to <br />0 0) <br />0 CD <br />-... <br />r- <br />(V <br />0) <br />0 <br />0 <br />6 <br />co69 <br />0 <br />(0 <br />0) <br />0 <br />9 <br />06 <br />03 <br />CV <br />9) <br />4 <br />0 <br />0 <br />0 <br />et <br />LO <br />0 <br />0 <br />0 <br />Cel <br />0) <br />0) <br />$1,800,00 <br />$1,920.00 <br />Engineers Estimate <br />[Unit Price !Total Price <br />0 <br />00000000000 <br />0 <br />0 <br />0 <br />cj <br />9 <br />0 0 0 <br />6 6 <br />0 0 0 <br />LO 0 <br />0) 0) <br />0 <br />6 <br />LCD <br />CV <br />_ <br />9 <br />0 0 <br />6 6 <br />UD 9 <br />0- CV <br />ea ea <br />0 0 <br />6 6 <br />0 0 <br />0 CO <br />',..." <br />e- CV <br />V> e- <br />to <br />0 <br />cri <br />0- <br />0 <br />LO <br />9 <br />0 <br />ci <br />Tt <br />CO <br />v"" <br />c- <br />to <br />100 009$ <br />0 <br />0000 <br />000 <br />0 <br />r - <br /><- <br />T- <br />0) <br />0 0 0 <br />cri <br />LO 9 <br />N - 00 <br />LC) OD 'cr <br />9 NI T- <br />0s1 <br />0) <br />0 <br />0 <br />6 <br />0 <br />CD <br />,.....- <br />9 <br />0 <br />0 <br />ci <br />CD <br />1- <br />9 <br />0 <br />0 <br />6 <br />0 <br />1.0 <br />„... <br />9 <br />0 <br />0 <br />0 <br />0 <br />C1) <br />6 <br />0 <br />La <br />•,- <br />9 <br />$1,500.00 <br />$1,500.00 <br />0 <br />CD <br />0 <br />0 <br />0 <br />. <br />z; <br />0 0 0 <br />0 0 CD <br />6 <br />o <br />0 <br />Ea. <br />0 <br />0 <br />0 <br />9 <br />CV <br />0 0 <br />0 0 <br />0 0 <br />9 9 <br />0.1 CV <br />0 0 <br />0 0 <br />0 0 <br />LO <br />9 <br />0 <br />LO <br />csi <br />9 <br />0 <br />0 <br />csi <br />CO <br />9 <br />0 <br />CD <br />6 <br />CO <br />9 <br />0 <br />CD <br />0 <br />CD <br />te <br />0 0 <br />0 0 <br />0 6 <br />9 9 <br />0- N <br />0 <br />0 <br />0 <br />0 <br />0 <br />co <br />0 <br />C) <br />6 <br />T- <br />9 <br />0 <br />0 <br />0 <br />0, <br />0 <br />0 <br />CD <br />$1.500.00 <br />$1,500.00 <br />$1,500.00 <br />:,-.- <br />C <br />CO <br />= <br />0 <br />0 ca CV <br />0 <br />T- <br />9 <br />0- 9 <br />0 0 <br />0 <br />Cel <br />0 <br />CO <br />C) <br />CNI <br />0 <br />0-- <br />CI <br />0 <br />,- <br />0 <br />0) <br />CO <br />LO <br />0) <br />Total Schedule A - Sanitary Sewer Improvements <br />T- <br />0 <br />,- <br />0 <br />0 <br />.,..- <br />CV <br />D <br />-I <br />1111 <br />-1 I- LIJ <br />til <br />UJ 1.1.1 <br />-J -I <br />_J <br />J <br />J <br />1- <br />U_ <br />:...71 <br />= <br />UJ -J <br />-1 <br />-I <br />I- <br />1111 <br />lil <br />LLI LLI lit <br />Project, 02029-86 - LINO - Birch Street Sanitary Sewer Extension and Turn Lane Constructionl <br />E <br />(4) <br />!MOBILIZATION 1 <br />REMOVE SEWER PIPE (SANITARY) <br />GRANULAR FOUNDATION AND/OR BEDDING <br />CONNECT TO EXISTING SANITARY SEWER <br />8"X4" PVC WYE <br />CHIMNEY SEALS <br />4" SEWER SERVICE CLEAN-OUT <br />4" HDPE PIPE SEWER -DIRECTIONAL DRILLED <br />8" HDPE PIPE SEWER -DIRECTIONAL DRILLED <br />,TELEVISE SANITARY SEWER <br />18" PVC PIPE SEWER - SDR 35 <br />18" PVC PIPE SEWER - SDR 26 <br />4" PVC PIPE SEWER - SCH 40 <br />CASTING ASSEMBLY <br />CONST 48" DIA SAN SEWER MANHOLE <br />MOBILIZATION <br />REMOVE WATER MAIN <br />GRANULAR FOUNDATION AND/OR BEDDING <br />CONNECT TO EXISTING WATER MAIN <br />INSTALL HYDRANT <br />4" GATE VALVE & BOX <br />6" GATE VALVE & BOX <br />2021.501 <br />!2104.501 <br />2451.609 <br />12503.602 <br />2503.602 <br />2506.602 <br />2503.602 <br />2503.603 <br />2503.603 <br />2503.603 <br />2503.603 <br />2503 603 <br />2504.603 <br />2506.516 <br />2506.601 <br />,- <br />0 <br />to <br />cv <br />co <br />(-4 <br />2104.501 <br />2451.609 <br />2504.602 <br />2504.602 <br />2504.602 <br />2504.602 <br />6 <br />Z <br />E <br />(4) <br />.,- <br />C4 CO Nr <br />9 <br />CO 4-- <br />co <br />0 <br />N1-1 <br />01 <br />1l-1 <br />0) <br />,1- <br />1,-- <br />0- <br />11- <br />CO <br />,11- <br />Ck c- CV <br />(31 (Si CV <br />