Laserfiche WebLink
• Plowe Engineering, Inc. dated March 4, 2015 and received by the City on March 4, <br /> 2015 <br /> • EG Rud & Sons, Inc. dated March 4, 2015 and received by the City on March 4, 2015 <br /> The Planning & Zoning Staff Report dated April 8, 2015 details the proposed project. The <br /> Planning & Zoning Board held a public hearing on April 8, 2015. Residents that spoke during <br /> the hearing wanted to make sure the new homes were quality products, would not devalue their <br /> properties and that the exterior elevations were similar and complimentary to their units. The <br /> Planning & Zoning Board recommended approval of the project with conditions as listed in <br /> Resolution No. 15-46. <br /> Summary of PUD Development Stage Plan/Preliminary Plat Amendments <br /> I. The one-story units have a larger building footprint than the two-story units, therefore; <br /> the preliminary plat needs to be amended to increase the base lot dimensions of Lots 4 <br /> 11. <br /> 2. The three-unit townhome on the north end of the site was originally proposed as three <br /> attached units and two-story. These units will now be detached and one-story. <br /> 3. The setback on the north perimeter will be amended from 30 feet to 25 feet to <br /> accommodate the single-level building footprint. The proposed building will be 29.1 <br /> feet from the property line. No other setbacks will be revised. <br /> Building Design Standards <br /> The Planning &Zoning staff report dated April 8, 2015 recommended that all new units have <br /> stone or brick on the front elevation extending from the ground to the roofline around the <br /> window to match the existing unit elevations. However, upon further review of the original <br /> elevation approvals from 2005, brick or stone were only required on the front from the base to <br /> the bottom of the window sill. This was recommended by the Planning &Zoning Board. Side <br /> and rear elevations shall also have stone or brick extending along the full base. <br /> The Board also recommended the addition of two more siding colors as approved by staff and <br /> full brick columns on the front elevations vs. the white pillars proposed by the developer. <br /> Shoreland Management Overlay District and Impervious Surface Coverage <br /> The property is subject to the Shoreland Management Overlay District because it is located <br /> within 1,000 feet of both Marshan and Rice Lake. Both lakes are considered natural <br /> environment lakes per the MNDNR. Impervious surface coverage of the development cannot <br /> exceed 35%. Due to the increase in the size of the floor plan of the single level structures, the <br /> impervious surface also increased. To mitigate the issue and maintain 35%, the developer shall <br /> install porous pavers in the driveways and sidewalks of Lots 1-15 and pervious sidewalks on <br /> Lots 20-21. <br /> 2 <br />