My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2015-053 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2015
>
2015-053 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2015 3:51:34 PM
Creation date
7/28/2015 8:39:02 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
06/08/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />Mr. Michael Grochala <br />April 29, 2015 <br />Page 2 <br />Task 1: Project Management and Coordination <br />Project management is a key task included in each project undertaken by WSB. This task <br />consists of management and administration, project coordination, and overall communication <br />with the City. Proper completion of this task will help keep all affected parties routinely updated <br />and informed regarding project issues, as well as keep the project on schedule and within budget. <br />The proposed work plan will include one meeting with the City prior to finalizing the Study to <br />discuss results. <br />Task 2: Water Balance Development <br />Task 2.1: WSB will develop a model to predict the annual stormwater available for irrigation. <br />The model will take into consideration historical precipitation, drainage area, pond size, <br />evaporation, and irrigation demand. The model will estimate volume reduction credits, if desired, <br />generated by the project. WSB will work directly with the developer to obtain the necessary <br />grading and preliminary plat information necessary for this task. <br />Task 2.2: A technical memorandum will be submitted with the model results. The memorandum <br />will summarize methods used during model creation, assumptions made, and implications for <br />irrigation design. <br />Task 3: Preliminary System Design <br />Task 3.1: The number of required pumping zones will be estimated based on flow and pressure <br />requirements. Upon this determination, the zones will be delineated and mapped. <br />Task 3.2: The irrigation networks for each pumping zone will be proposed and drawn on a <br />schematic. The networks will minimize cost and ensure landowners can attach individual <br />irrigation systems to the network. <br />Task 4: Cost Estimates and Funding Alternatives <br />Task 4.1: The total project costs for project implementation will be estimated and submitted in a <br />spreadsheet. The estimate will consist of a per unit flat fee for water users and will consider the <br />results of the water balance and potable water requirements in rate determination. <br />Task 4.2: A cost recovery spreadsheet will be developed to assist City planning, including <br />installation and maintenance. Grant opportunities will be considered as alternatives. <br />Task 5: Preliminary Ordinance Review and Proposed Policy Revisions <br />Task 5.1: The City's existing ordinances will be reviewed to evaluate if policy revisions will be <br />necessary to implement a water reuse and irrigation utility. <br />Task 5.2: If deemed necessary, policy revisions will be recommended in the final feasibility <br />report. This task does not include fees associated with the ordinance revisions; however, that <br />service can be provided in requested under a separate scope of work. <br />C.\UsersWianehart AppData\LDeal\berosoft\Windows\'1'c.niwran Internet Flies \Cont.nt Ontlook\ER8.MUDX\o4^_915 LTR PROP - Lino lakes docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.