Laserfiche WebLink
• <br />Hailey Manor Page 4 July 1, 2003 <br />City of Lino Lakes, Minnesota <br />Other Comments <br />1. The Contractor shall adhere to working hours for construction activities in accordance with the <br />requirements of the City of Lino Lakes. <br />2. A note must be added to the grading plan stating that Contractor shall provide a sweeper to clean <br />streets and paved areas outside of the project site on a daily basis as needed. <br />3. A note must be added that the City of Lino Lakes Utility Superintendent shall be contacted at least 48 <br />hours prior to any utility work, utility connections, or any work in the public right-of-way being <br />performed. <br />4. At least some of the existing homes proposed to remain as part of the project do not appear to meet <br />side setback requirements with the new lot configurations. <br />