My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2003-143 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2003
>
2003-143 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2015 11:54:06 AM
Creation date
7/29/2015 9:20:25 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
09/08/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Birch Street Commercial Review Page 5 July 24, 2003 <br />City of Lino Lakes, Minnesota <br />• <br />6. All trenches (including services) shall be backfilled and compacted and meet 100% maximum <br />Standard Proctor Density in the upper 3 -feet from finished road elevation, and 95% maximum <br />Standard Proctor Density below the upper 3 -feet. <br />Watermain <br />The following comments, specific to watermain are provided as follows: <br />1. The site area is surrounded by existing watermain pipe as follows: 16 -inch (Birch Street), 12 -inch <br />(Hodgson Road), and 8 -inch (Ware Road). The proposed Plan provides for the installation of 8 -inch <br />main throughout the site, and connecting to all three of the above existing mains. The proposed Water <br />Distribution Plan for the site is therefore acceptable. All proposed main sizes (8 -inch) and types <br />(D.I.P. CL 52), shall be labeled on the Plan accordingly. Construction activity and restoration of <br />property and roadways shall be performed in accordance with the requirements of Anoka County. <br />2. Watermain appurtenances must be specified as follows: Hydrants - Waterous Pacer WB -67; Valves - <br />Mueller A2370-20 or equal; Corp Stop - Mueller H-15000; Curb Stop and Curb Box - Mueller 11- <br />• 15154 Mark 2 Oraseal and Mueller H-1300 w/Mpls. Top. DIP pipe shall be Class 52. <br />3. The Developer shall provide to the City of Lino Lakes a copy of the completed Minnesota <br />Department of Health (MDH) Permit for watermain installation. <br />• <br />4. All watermain shall be tested, disinfected approved per the requirements of the City of Engineers <br />Association of Minnesota Standard Specifications and Minnesota Department of Health prior to <br />acceptance by the City. <br />Sanitary Sewer <br />The following comments, specific to watermain are provided as follows: <br />1. 8 -inch diameter sanitary sewer is shown as extending into the site from two locations: From an <br />existing manhole north of Birch Street on Ware Road (Spirit Hills), and from Ware Road near the <br />south end of the property. <br />2. The majority of the site would be serviced from the Spirit Hills connection. Per the City's <br />Comprehensive Sewer Plan, the Spirit Hills connection point was recommended to be extended <br />westerly down Birch Road to Hodgson, and south on Hodgson Road to extend to a point located <br />south of the proposed development to service properties along Hodgson Road and to the south in the <br />future. Upon review, the sewer extension as proposed will accomplish the same purpose provided the <br />following revisions are made: <br />
The URL can be used to link to this page
Your browser does not support the video tag.