Laserfiche WebLink
Birch Street Commercial Review Page 6 July 24, 2003 <br />City of Lino Lakes, Minnesota <br />• Extending the 8 -inch sewer the remaining distance to Hodgson Road at the southwest comer <br />of the site. <br />• Extending the sewer westerly from the front of the day care/office facility to Hodgson Road. <br />This will allow properties along the west side of Hodgson Road to eventually connect to <br />sanitary sewer. <br />3. The Developer shall be responsible for extension of sanitary sewer from Spirit Hills. The proposed <br />extension will impact both City and County Roadways, and may require boring, jacking, or other <br />means to limit impacts and disruptions. This issue should be investigated further and provided for on <br />the Utility Plan accordingly. <br />4. The invert elevations provided on the sewer on the west side of the property appear to be incorrect (5 <br />successive manholes have invert elevations of 887.8). <br />5. The Developer shall provide to the City of Lino Lakes a copy of the completed MPCA Sanitary <br />Sewer Permit, including correspondence and approval of Metropolitan Council Environmental <br />Services (MCES). <br />6. The Utility Plans shall include notes providing for erosion and sedimentation control. The Developer <br />must provide a televised inspection of all sanitary sewer pipes upon completion of installation. Any <br />required cleaning of sediment from the sewer pipes after construction shall be the responsibility of <br />the Developer. <br />7. All sanitary sewers shall be tested and approved per the requirements of the City of Engineers <br />Association of Minnesota Standard Specifications prior to acceptance by the City. <br />Storm Sewer <br />All storm sewer mainline pipes must be RC pipe. Backyard HDPE pipe leads will be allowed by the City <br />Engineer. <br />Wetland Delineation Report and Wetland Replacement Plan <br />A Wetland Delineation Report must be prepared and provided with the permit application submittal to the <br />Rice Creek Watershed District. <br />Additional Comments <br />1. The lowest building opening must be a minimum of 1 -foot higher than the emergency overflow <br />elevation. Basement floor elevations must be at least 4 -feet above the normal water elevation and <br />2 -feet above the design flood level. <br />2. Typical street sections (pavement section and design) must be provided. All street system <br />components shall, as a minimum, meet Mn/DOT and City of Lino Lakes Engineering Standards. <br />