My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07-27-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
07-27-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 1:11:18 PM
Creation date
8/21/2015 10:16:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/27/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*MADocument G7OITM - 2001 <br />Change Order <br />PROJECT (Name and address): CHANGE ORDER NUMBER: 001 <br />Lino Lakes Fire Station <br />1710 Birch Street <br />Lino Lakes, MN 55038 <br />TO CONTRACTOR (Name and address): <br />Jorgenson Construction Inc. <br />9255 East River Road NW <br />Suite A <br />Coon Rapids, MN 55433 <br />DATE: July 21, 2015 <br />ARCHITECT'S PROJECT NUMBER: 14045 <br />CONTRACT DATE: February 24, 2015 <br />CONTRACT FOR: General Construction <br />OWNER: ❑ <br />ARCHITECT: ❑ <br />CONTRACTOR: ❑ <br />FIELD: ❑ <br />OTHER: ❑ <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change Directives) <br />PR#1 Site plan revisions. $47,962.00 <br />PR#02R2 Lanscape tree/seeding mix revisions. ($2,225.00) <br />PR#3 Grading, erosion control, utility plan. ($3,010.00) <br />TOTAL $42,727.00 <br />The original Contract Sum was $ 3,847,100.00 <br />The net change by previously authorized Change Orders $ 0.00 <br />The Contract Sum prior to this Change Order was $ 3,847,100.00 <br />The Contract Sum will be increased by this Change Order in the amount of $ 42,727.00 <br />The new Contract Sum including this Change Order will be $ 3,889,827.00 <br />The Contract Time will be unchanged by Zero (0) days. <br />The date of Substantial Completion as of the date of this Change Order therefore is December 4, 2015. <br />NOTE: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have <br />been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and <br />Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. <br />NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. <br />CNH Architects, Inc. <br />ARCHITECT (Firm name) <br />7300 West 147th Street, Suite 504, <br />Apple Valley, MN 55124 <br />ADDRESS <br />Jorgenson Construction Inc. City of Lino Lakes <br />CONTRACTOR (Firm name) OWNER (Firm name) <br />9255 East River Road NW, Suite A, <br />Coon Rapids, MN 55433 <br />600 Town Center Pkwy., <br />Lino Lakes, MN 55014-1182 <br />ADDRESS ADDRESS <br />BY (Signature) BY (Signature) BY (Signature) <br />Quinn Hutson Dwayne Kanne <br />(Typed name) <br />DATE <br />(Typed name) (Typed name) <br />DATE DATE <br />AIA Document G701 T'" — 2001. Copyright © 1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This AIA® <br />Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any <br />portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This document was <br />produced by AIA software at 16:06:17 on 07/21/2015 under Order No.3095413000_1 which expires on 01/17/2016, and is not for resale. <br />User Notes: (1785546576) <br />
The URL can be used to link to this page
Your browser does not support the video tag.