Laserfiche WebLink
7300 WEST 147TH STREET SUITE 504 APPLE VALLEY, MN 55124-7580 (952) 431-4433 <br />MEMORANDUM: <br />PROJECT: <br />CNH NO: <br />DATE: <br />TO: <br />SUBJECT: <br />Lino Lakes Fire Station <br />14045 <br />July 19, 2015 <br />City of Lino Lakes - Mayor and City Council <br />Change Order #01 Review <br />027 <br />The following is a summary of the items being submitted as Change Order #01 for the Lino Lakes <br />Fire Station. <br />Background: <br />There are three items included in the proposed Change Order #01 labeled as Proposal Request #01, <br />#02 and #03 which will be defined below. All three of these items are related to requirements placed <br />on the project by Rice Creek Watershed District and Anoka County after the project was bid and <br />contracts were signed. Due to the critical timeline of the Fire Station design and the slower submittal <br />process for Rice Creek Watershed District along with the inability to finalize wetland delineations <br />outside of the growing season, the design and bidding needed to continue while these two agencies <br />reviews were in process knowing that these approvals would be finalized this late Spring before they <br />would have impact on the construction schedule. The final determinations from these agencies, <br />primarily RCWD, required several modifications to the internal road design, wetland mitigation and <br />the stormwater treatment mostly as related to the turn lane designs. <br />Scope of Changes: <br />The main changes are incorporated in the attached Proposal Request #01 and are summarized by the <br />following bullet points: <br />• Move the eastern half of the internal road to the south 7'-0" to increase the wetland <br />buffer distance along the existing wetland delineated at that area and provide <br />additional area for snow storage. <br />• Raise the bottom elevation of all stormwater basins to provide additional separation <br />between basins and groundwater elevation. Increase size of some basins to <br />compensate for reduced depth and add additional draintile piping below basin. <br />• Increase amount of riprap and erosion control blankets provided to satisfy RCWD <br />recommendations. <br />• Add one manhole at stormwater pipe from fire station roof rainwater. <br />Proposal Request #02 adjusts the seeding of basins and new wetlands to change to RCWD <br />recommended seed mix and switches planting mulch from trap rock to hardwood mulch. <br />Proposal Request #03 further adjusts the sizes of several of the stormwater basins to meet Anoka <br />County stormwater concerns resulting in less excavation at these locations. <br />P:\PROJECTS\2014\14045\5 - CONSTRUCTION ADMIN\CHANGE ORDERS & PAY APPS \CHANGE ORDER #O1 RECOMMENDATION TO COUNCIL.DOCX <br />