My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-24-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
08-24-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:18:15 AM
Creation date
9/1/2015 11:38:43 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/24/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring <br />Vegetation Performance Standards <br />The mitigation area will be maintained to either meet or exceed the following vegetation performance <br />standards: <br />Year 1: In the first year following construction/seeding, it is expected that some pioneer species will be <br />present which may not be native. These species will be controlled to reduce spreading. Of the seed mix <br />used, it is expected that 3-5 native species will be present. Native cover will comprise 30% - 50% of the <br />area. Some denuded areas are expected. <br />Year 3: By year 3, vegetative cover is expected to be such that little denuded area remains (< 10%). It is <br />expected that 5-7 species of native plants will be present and native cover will comprise 50% - 75% of <br />the area. <br />Year 5: By year 5, the vegetation should be fully established and no denuded areas should be present. <br />Seven or more species of native plants should be present and native cover will comprise a minimum of <br />75% of the area. <br />Wetland and Buffer Maintenance Plan <br />The Minnesota Wetland Conservation Act requires the property owner to monitor the establishment of <br />a created wetland. The developer of the property is responsible for monitoring the wetland annually for <br />a five year period or until such time as the wetland replacement is deemed acceptable by the LGU <br />(minimum three years). The developer will provide information to the LGU once a year. This information <br />will include a report identifying the dominant plant species growing in the area and photographs taken <br />from predetermined reference points. <br />• Description of the project location, size, plus current and desired wetland type (goal). Wetlands <br />will be described using the Cowardin classification system. <br />• Comparison of as -built with planned wetland creation. <br />• Water level elevation during the growing season. <br />• List of the dominant vegetation in the wetland, including common names of the vegetation <br />exceeding 20% coverage and an estimate of coverage. <br />• Color photographs of the project area taken anytime during the period June through August, <br />referenced to the fixed photo -reference points. <br />Year 1 <br />• Mow wetland and buffer to 6 inches every 30 days after planting until September 30. Mowing <br />should only occur if the equipment will not cause soil disturbance. Most natives will not grow <br />taller than about 6 inches the first year. <br />• Weed Control — mowing should be conducted as weeds reach 12 inches in height and prior to <br />weeds developing seeds. Spot treatment of invasive species should occur as needed throughout <br />the first year of growth. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.