My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-24-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
08-24-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:18:15 AM
Creation date
9/1/2015 11:38:43 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/24/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• If invasive species are hand pulled, removed vegetation will be taken off-site to prevent re- <br />introduction of undesirable species to project site. <br />• Spring and summer seedings benefit from regular watering the first 4 — 6 weeks. Watering <br />should occur in the early morning, every other day, for half an hour. <br />Year 2 <br />• Mow between 6 — 10 inches from June 1— August 15. <br />• Mow late September. <br />• Weed Control — Spot treatment of invasive species should occur as needed throughout the <br />second year of growth. <br />• If drought conditions exist, areas will be watered every two weeks. <br />Year 3+ <br />• Mow only if necessary (excessive weed growth). <br />• Monitoring for invasive weeds should occur three times a year until desired wetland goals have <br />been met. <br />• Spot treatment of perennial weed species should occur as needed. <br />• Plants should be well established and watering should not be necessary. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.