My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-14-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
09-14-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:18:56 AM
Creation date
9/29/2015 2:05:44 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/14/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Regional Sanitary Sewer <br />The AUAR included preparation of a sewer analysis to fully investigate the effects of the <br />proposed land use scenarios on the systems. Sewer capacity was noted as an issue in the <br />original AUAR. The 2010 AUAR Update discussed the Lino Lakes Relief Interceptor <br />(MCES 70-29) that was constructed to address capacity for the area. Additionally, the <br />sewer was extended along 21st Avenue as well as other trunk improvements to serve <br />development within the study area in conformance with the AUAR and the <br />Comprehensive Plan. No other regional sewer projects have occurred since the 2010 <br />AUAR Update. This study remains valid for this AUAR Update. <br />C. Regional Water System <br />The AUAR included an analysis of the city's water system as it related to possible <br />development in the AUAR Study Area. The city is currently in the process of updating its <br />Wellhead Protection Plan. Part 1 of the plan has been approved by the Minnesota <br />Department of Health and Part 2 is currently under review. This update process is in <br />conformance with the AUAR mitigation plan. <br />D. Potential Environmental Hazards <br />Item 9 in the original AUAR included a review of past land use in relation to potential <br />environmental hazards. This section was updated and includes a review of the Minnesota <br />Pollution Control Agency's "What's in My Neighborhood" database. The results are in <br />Appendix C. No significant changes occurred and the mitigation plan remains valid for <br />the AUAR Update. <br />E. Stormwater Management <br />On November 12, 2014, the RCWD adopted revised rules that affect the I -35E Corridor <br />study area. These rules became effective December 1, 2014. These rules supersede past <br />rules or requirements that were in the 2010 and 2005 AUAR and also incorporate the <br />Resource Management Plan that was added in the 2010 AUAR Update. These rules are <br />now in effect for development in the study area and the mitigation plan has been updated <br />accordingly. <br />F. Ecologically Sensitive Areas <br />The AUAR included review and analysis of the ecologically sensitive areas within the <br />study area. For this update, the DNR Natural Heritage Database information was updated <br />and is included in Appendix B. This update contains additional known occurrences of <br />rare species or natural communities within a one -mile radius of the study area as <br />compared to the data from the original AUAR. The mitigation plan is adequate to <br />address these sensitive ecological areas and the remaining AUAR analysis remains valid <br />for this update. <br />Five Year Update <br />Lino Lakes I -35E Corridor <br />Alternative Urban Areawide Review <br />WSB Project No. 2029-95 <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.