Laserfiche WebLink
ITEM 11. FISH, WILDLIFE, ECOLOGICALLY SENSITIVE RESOURCES <br />Item No. <br />Mitigation Description <br />Update <br />11.1 <br />Implement the Conservation Design Framework (CDF, see Figure 10-3), which <br />includes conservation of "Core" and "Outlier" habitat areas, buffering these natural <br />resources, and establishing greenway corridors throughout the AUAR area to <br />provide connectivity for ecological and wildlife corridors, regional stormwater <br />collection and conveyance, and passive recreational opportunities <br />This mitigation measure is ongoing <br />11.2 <br />Add the "Core" and "Outlier" habitat areas to the City's Parks, Natural Open <br />Space/Greenways, and Trail System Plan map. <br />This has been added to Fig 2-9 in the <br />Comprehensive Plan. <br />11.3 <br />Require public land dedication of priority natural open space areas through the <br />subdivision process. <br />This mitigation measure is ongoing <br />11.4 <br />Require that cash in lieu of public land dedication for subdivisions within the <br />AUAR area be spent within the AUAR area to purchase, restore, and/or maintain <br />priority natural open space areas. <br />This mitigation measure is ongoing <br />11.5 <br />Consider provisions for conserving "Other" habitat areas (see Figure 10-2) during <br />the development review process. <br />This mitigation measure is ongoing <br />11.6 <br />Establish mechanisms for ecological restoration, management, stewardship, and <br />education. <br />This mitigation measure is ongoing and <br />implemented through the Comprehensive <br />Wetland Protection and Management Plan <br />11.7 <br />Provide for turtle and other wildlife passage by continuing to require surmountable <br />curbing in new residential developments and encouraging ecologically sensitive <br />site design. <br />This mitigation measure is ongoing. Residential <br />developments that have occurred within the <br />study area have all incorporated surmountable <br />curbs. <br />4 <br />Mitigation Plan Update - 2015 <br />June 3, 2015 <br />