Laserfiche WebLink
11.8 <br />Consult with the DNR and/or US Fish and Wildlife Service to determine <br />appropriate mitigation strategies for activities near the Bald Eagle's nests within <br />the AUAR area before development occurs within the vicinity of the nests, <br />including reviewing recommended disturbance limit guidelines developed by the <br />DNR. <br />This mitigation measure is ongoing <br />11.9 <br />Continue to enforce the Peltier Lake No -Wake Zone ordinance and establish <br />buffers to protect the Peltier Lake Heron Rookery. <br />This mitigation measure is ongoing <br />11.9A <br />Added <br />The City will limit development within 300 meters of the edge of a heron colony <br />and not allow disturbance in or near colonies from March to August <br />Measure was included in original AUAR <br />within the text. <br />11.10 <br />Require rare plant surveys, by qualified personnel, prior to development in wetland <br />areas and of areas of banded soils between muck soils and adjacent Isanti, <br />Soderville, or Zimmerman soil map units. These surveys shall be conducted by <br />qualified professionals at an appropriate time of year to identify the rare plants. <br />This mitigation measure is ongoing <br />11.11 <br />Encourage ecologically sensitive design and construction practices for the proposed <br />northerly bypass that would connect I -35W and I -35E. <br />This mitigation measure is ongoing <br />11.12 <br />Added <br />Implement the Conservation Design Framework (CDF) of the AUAR (Figure 10-3 <br />and 10-2). The CDF includes consideration of: <br />• Conservation of the most ecologically significant natural resources within <br />the AUAR area (in particular, the "Core" and "Outlier" habitats as shown in <br />Figure 10-2 of the original AUAR). <br />• Protection of ecologically significant natural resources from adjacent land <br />uses by implementing buffering. <br />• Connection of ecologically significant natural resources via multi- <br />functional greenway corridors. <br />Measure was included in original AUAR <br />within the text. <br />5 <br />Mitigation Plan Update - 2015 <br />June 3, 2015 <br />