Laserfiche WebLink
ITEM 18. WATER QUALITY: WASTEWATER <br />Item No. <br />Mitigation Description <br />Update <br />18.1 <br />Monitor wastewater flows and not permit new development to proceed if it exceeds <br />the capacity of the wastewater system. <br />This mitigation measure is ongoing <br />18.2 <br />Construct the major infrastructure improvements needed to expand the capacity of <br />the wastewater system (i.e. lift stations, forcemains, and upgrades to the existing <br />systems) in accordance with the Comprehensive Sanitary Sewer Plan and Capital <br />Improvement Plan. <br />This mitigation measure is ongoing <br />18.3 <br />Adequately phase capacity improvements. <br />This mitigation measure is ongoing <br />18.4 <br />Amend the Comprehensive Sanitary Sewer Plan and Capital Improvement Plan to <br />be consistent with any amendments to the Comprehensive Plan that would <br />necessitate expansions or alterations to the sanitary sewer system and regional <br />capacity needs. <br />This mitigation measure is ongoing. No updates <br />have been needed to date for the study area. <br />18.5 Added <br />Each proposed development will be required to provide a detailed projection of <br />wastewater generation and flows. These calculations will be checked by the City's <br />Engineering Consultant. <br />Measure was included in original AUAR <br />within the text. <br />18.6 Added <br />The City will create a year-end report to evaluate wastewater increases by major <br />sewer lines and overall system usage in relation to capacity. Results of this <br />assessment will become the targets for growth for the following year. <br />Measure was included in original AUAR <br />within the text. <br />11 <br />Mitigation Plan Update - 2015 <br />June 3, 2015 <br />