My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-14-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
09-14-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 9:18:56 AM
Creation date
9/29/2015 2:05:44 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/14/2015
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 18. WATER QUALITY: WASTEWATER <br />Item No. <br />Mitigation Description <br />Update <br />18.1 <br />Monitor wastewater flows and not permit new development to proceed if it exceeds <br />the capacity of the wastewater system. <br />This mitigation measure is ongoing <br />18.2 <br />Construct the major infrastructure improvements needed to expand the capacity of <br />the wastewater system (i.e. lift stations, forcemains, and upgrades to the existing <br />systems) in accordance with the Comprehensive Sanitary Sewer Plan and Capital <br />Improvement Plan. <br />This mitigation measure is ongoing <br />18.3 <br />Adequately phase capacity improvements. <br />This mitigation measure is ongoing <br />18.4 <br />Amend the Comprehensive Sanitary Sewer Plan and Capital Improvement Plan to <br />be consistent with any amendments to the Comprehensive Plan that would <br />necessitate expansions or alterations to the sanitary sewer system and regional <br />capacity needs. <br />This mitigation measure is ongoing. No updates <br />have been needed to date for the study area. <br />18.5 Added <br />Each proposed development will be required to provide a detailed projection of <br />wastewater generation and flows. These calculations will be checked by the City's <br />Engineering Consultant. <br />Measure was included in original AUAR <br />within the text. <br />18.6 Added <br />The City will create a year-end report to evaluate wastewater increases by major <br />sewer lines and overall system usage in relation to capacity. Results of this <br />assessment will become the targets for growth for the following year. <br />Measure was included in original AUAR <br />within the text. <br />11 <br />Mitigation Plan Update - 2015 <br />June 3, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.