Laserfiche WebLink
4. The amount of water quality treatment volume credit given will be based upon the <br />three year average of the volume irrigated, determined by the average of three years of <br />monitoring records. <br />c. Biofiltration and Filtration BMPs. Biofiltration and filtration BMPs must be designed to <br />provide: <br />1. Adequate pretreatment measures to remove sediment before runoff enters the primary <br />bilfiltration area; <br />2. Drawdown within 48 -hours or 72 -hours from the end of the storm event for surface or <br />sub -surface features, respectively; <br />3. A minimum of 12 -inches of organic material or sand above the rock trench or <br />draintile system; and <br />4. Drain tile system must be designed above the Seasonal High Water Table. <br />d. Stormwater Ponds. Stormwater ponds must be designed to provide: <br />1. Water quality features consistent with NURP criteria and city standard plate; <br />2. Permanent wet pool with dead storage at least equal to the runoff from a 2.5 -inch <br />rainfall over the area tributary to the pond; and <br />3. An outlet structure capable of preventing migration of floating debris and oils for at <br />least the one-year storm. <br />4. An outlet structure to control the two-year, ten-year and 100 -year frequency events to <br />existing peak runoff sites; and <br />5. An identified overflow spill way sufficiently stabilized to convey flows greater than <br />the 100 -year critical storm event. <br />e. Outfalls. An outfall structure discharging to a wetland, public water or public water <br />wetland must incorporate a stilling -basin, surge -basin, energy dissipater, placement of ungrouted <br />natural rock riprap or other feature to minimize disturbance and erosion of natural shoreline and <br />bed resulting from stormwater discharges. <br />f. Freeboard Requirements. All new residential, commercial, industrial and other habitable <br />or non -habitable structures, and all stormwater basins, must be constructed so that the lowest <br />floor and lowest entry elevations of structures comply with the following <br />g. Table 6: <br />draft 06-15 ECS Ordinance.docx <br />22/29 <br />