My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-05-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
10-05-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 3:30:49 PM
Creation date
10/7/2015 9:04:48 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Minutes
Meeting Date
10/05/2015
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 6. Low Floor and Low Entry Freeboard Requirements <br />h. Within a landlocked basin, lowest floor elevations must be at least one foot above the <br />surveyed basin overflow elevation. Where a structure is proposed below the runoff elevation of <br />a land -locked basin, the low -floor elevation will be a minimum of two feet above the high water <br />level as determined from an estimate of high water levels determined from the highest of either <br />the 100 -year, ten-day runoff event or back-to-back 100 -year, 24-hour rainfalls. Aerial photos, <br />vegetation, soils, and topography will be used to derive a "normal" water elevation for the basin <br />for the purpose of computing the 100 -year elevation. <br />7) Drainage and utility easements. <br />a. If a stormwater management plan involves direction of some or all runoff off of the site, it <br />shall be the responsibility of the applicant to obtain from adjacent property owners any necessary <br />easements or other property interests concerning flowage of water. <br />b. Easements are required for all stormwater management facilities, stormwater conveyances <br />and on-site floodplain and shall extend a minimum of 10 feet beyond the basin's 100 -year storm <br />high water level elevation. <br />c. Easements are required for all outlet swales and ditches, and for overland overflow routes <br />located downstream of basins located on site. <br />d. If the storm sewer is to be installed less than ten feet deep within private property, the <br />easement shall be a minimum of 20 feet wide. If the storm sewer is ten feet or greater, the <br />easement shall be twice as wide as the depth. <br />e. Easements necessary for maintenance vehicle access are required for all of the above <br />where not directly available on a public road. <br />8) Stormwater management plan required exhibits. The stormwater management plan shall be <br />prepared and signed by a duly licensed engineer in the State of Minnesota. The following <br />exhibits must accompany the permit application: two plan sets, full size (22 inches by 34 inches); <br />one plan set, reduced to maximum size of 11 inches by 17 inches. Additional copies may be <br />draft 06-15 ECS Ordinance.docx <br />23/29 <br />Regional <br />Elevations <br />Local Detention <br />Basins & Wetlands <br />Infiltration Basins <br />Rain <br />Gardens <br />Groundwater <br />Elevation <br />100 <br />year <br />EOF <br />100 <br />year <br />EOF <br />Bottom <br />100 <br />year <br />EOF <br />EOF <br />Seasonal High <br />Level <br />Low <br />Floor <br />2 -ft <br />1 -ft <br />0 -ft <br />N/A <br />0 -ft <br />N/A <br />N/A <br />N/A <br />4 -ft <br />Low <br />Entry <br />NA <br />NA <br />2 -ft <br />1 -ft <br />NA <br />2 -ft <br />1 -ft <br />0.5 -ft <br />N/A <br />h. Within a landlocked basin, lowest floor elevations must be at least one foot above the <br />surveyed basin overflow elevation. Where a structure is proposed below the runoff elevation of <br />a land -locked basin, the low -floor elevation will be a minimum of two feet above the high water <br />level as determined from an estimate of high water levels determined from the highest of either <br />the 100 -year, ten-day runoff event or back-to-back 100 -year, 24-hour rainfalls. Aerial photos, <br />vegetation, soils, and topography will be used to derive a "normal" water elevation for the basin <br />for the purpose of computing the 100 -year elevation. <br />7) Drainage and utility easements. <br />a. If a stormwater management plan involves direction of some or all runoff off of the site, it <br />shall be the responsibility of the applicant to obtain from adjacent property owners any necessary <br />easements or other property interests concerning flowage of water. <br />b. Easements are required for all stormwater management facilities, stormwater conveyances <br />and on-site floodplain and shall extend a minimum of 10 feet beyond the basin's 100 -year storm <br />high water level elevation. <br />c. Easements are required for all outlet swales and ditches, and for overland overflow routes <br />located downstream of basins located on site. <br />d. If the storm sewer is to be installed less than ten feet deep within private property, the <br />easement shall be a minimum of 20 feet wide. If the storm sewer is ten feet or greater, the <br />easement shall be twice as wide as the depth. <br />e. Easements necessary for maintenance vehicle access are required for all of the above <br />where not directly available on a public road. <br />8) Stormwater management plan required exhibits. The stormwater management plan shall be <br />prepared and signed by a duly licensed engineer in the State of Minnesota. The following <br />exhibits must accompany the permit application: two plan sets, full size (22 inches by 34 inches); <br />one plan set, reduced to maximum size of 11 inches by 17 inches. Additional copies may be <br />draft 06-15 ECS Ordinance.docx <br />23/29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.