Laserfiche WebLink
City of Lino Lakes, MN 7 <br />Construction Observation <br />The inspector assigned to this project will be a NACE Trained Coating Inspector and/or AWS <br />Certified Welding Inspector. All of our inspectors have extensive practical experience and <br />knowledge of water storage tank reconditioning. They are experienced sandblasters, painters, <br />climbers, riggers, coating inspectors, welders and welding inspectors which allow the inspector <br />to perform inspections alongside the contractor to ensure conformance to the project <br />specification. <br />At a minimum, the field inspections will include the following: <br />• A preconstruction meeting with the client and contractor to clearly define the role of the <br />Engineer and Inspector and to discuss the intent of the specifications. <br />• Monitoring and approval of the structural repairs and modifications for conformance to the <br />specifications. <br />• Inspection of the abrasive blasting media and equipment for conformance to the <br />specifications and to prevent contamination of surfaces during surface preparation with <br />moisture and oil or other contaminants <br />• Monitoring the paint removal and abatement process for conformance to the specifications <br />and environmental regulations. <br />• Monitoring the contractors mixing and application of the coatings for conformance to the <br />specifications and the coating manufacturer's recommendations. <br />• Approving surface preparation samples. <br />• Recording the contractor's progress for adherence to the construction schedule. <br />• Submittal of daily and weekly inspection reports. Prepare and file copies of the reports on <br />construction activities. <br />• Review progress payments. <br />• Coordinate and review testing of materials for conformance to the specification and <br />environmental regulations. <br />• Work directly with residents and property owners to answer questions and respond to <br />Construction related issues. <br />• Monitor punch list items and subsequent corrective action by the contractor. <br />• Final inspection, substantial completion, and project acceptance. <br />The duration of the field inspection depends upon the construction schedule alternate selected <br />during the bid evaluation process and on the time it takes the contractor to perform the structural <br />repairs and coating work. <br />