Laserfiche WebLink
City of Lino Lakes, MN 8 <br />Documentation of the Project <br />KLM will provide electronic documentation of the following: <br />• Project Specifications <br />• Submittals <br />• Daily Logs <br />• Weather Logs <br />• Surface Preparation <br />• Daily Digital Photo's <br />• Weekly Meeting Minutes <br />• Project Acceptance Certificate <br />The city owns and retains this documentation. KLM also retains these records for future <br />reference. <br />Construction Service Administration and Inspection Fees <br />Based on the project duration of fourteen (14) weeks, a 2016 construction and coating schedule, <br />KLM's current Fee Schedule, and Terms & Conditions, and an anticipated 48- hour work week, <br />our field inspection services will be charged on a time and material basis with an estimated <br />average of $6,514.00 per week. Total construction management and inspection fees for the <br />project are estimated at $91,196.00. Fees are subject to change if proposed work exceeds 12 <br />months from this bid proposal. <br />This cost estimate includes the attendance of a qualified and assigned Inspector at the <br />preconstruction conference in Lino Lakes, MN. <br />Warranty Inspection <br />We propose to perform a Warranty Inspection on the referenced tank prior to the expiration of <br />the performance bonded two- (2) year warranty for a Fixed Fee of $3,200.00. This fee includes <br />one (1) copy of the warranty inspection report for the Owner and one (1) copy of the report for <br />the contractor. <br />Prior to the expiration of the warranty period, KLM will request verification to proceed with the <br />warranty inspection under the terms of this contract. <br />This phase of the project will be billed upon submittal of the Warranty Inspection Report. <br />This fee does not include any necessary inspection(s) should warranty repair work be required. <br />Antenna Inspection <br />KLM recommends the owner to set up an escrow account for the antenna providers for any <br />antenna related work on this project. KLM recommends $7,000 per carrier and $2,000 for any <br />city antennas. <br />