My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2003-181 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2003
>
2003-181 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2015 1:27:10 PM
Creation date
11/25/2015 12:39:41 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
10/13/2003
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.._lacy at Woods Edge Concept Plan Refinement (Task #1) <br />Deliverables: Refined Concept Plan showing street <br />and utility layouts, ponding / infiltration areas, <br />and streetscape / landscape features. <br />Task <br />Project <br />Manager <br />Prof. <br />Engineer <br />Specialty <br />Eng / Arch <br />Staff <br />Engineer <br />Word <br />Processor <br />Survey <br />Crew <br />A. Data Collection <br />Gather as-built data <br />2 <br />2 <br />Review as-built data / add as-built utilities to basemap <br />1 <br />2 <br />2 <br />Import electronic base mapping from Hartford Group <br />1 <br />2 <br />2 <br />Import electronic base mapping from YMCA <br />1 <br />2 <br />2 <br />Import proposed development scheme from Hartford Grour <br />1 <br />2 <br />2 <br />Develop overall base mapping <br />4 <br />2 <br />8 <br />Preliminary Survey of Lake Drive <br />20 <br />B. Concept Plan Preparation <br />Define property line configurations <br />1 <br />2 <br />4 <br />Develop roadway geometrics correlating to site usage <br />2 <br />8 <br />4 <br />12 <br />Identify right-of-way requirements <br />1 <br />4 <br />8 <br />Identify landscape / streetscape elements <br />1 <br />8 <br />8 <br />Identify preferred architectural treatments <br />1 <br />4 <br />4 <br />_ Create concept plan defining roadway and drainage areas <br />2 <br />8 <br />12 <br />Present plan for City and developer review <br />2 <br />8 <br />8 <br />2 <br />Total hours 172 <br />16 <br />44 <br />18 <br />72 <br />2 <br />20 <br />Project labor cost this task $17,766 <br />Expenses <br />Mileage and Expenses $100 <br />Survey Expenses $515 <br />Reproductions $1,000 <br />Computers $516 <br />Total project cost this task $19.897 <br />
The URL can be used to link to this page
Your browser does not support the video tag.