Laserfiche WebLink
.eqacv at Woods Ed <br />r limi <br />Deliverables: Preliminary Grading Plan, Street and Utility Plan, <br />Preliminary Hydraulic Analysis and Pond Routing, <br />Plan, Preliminary Cost Estimate <br />Preliminary Landscaping Plan, Preliminary Streetscape <br />Task <br />Project <br />Manager <br />Prof. <br />Engineer <br />Design <br />Engineer <br />Specialty <br />Eng/Arch <br />Staff <br />Engineer <br />Word <br />Processor <br />A. Preliminary Grading Plan Preparation <br />Prepare detail sheets and location sheet <br />2 <br />4 <br />4 <br />Lay out preliminary contours and lot pads <br />2 <br />8 <br />12 <br />24 <br />Determine ponding locations <br />1 <br />4 <br />Determine infiltration locations and techniques <br />1 <br />4 <br />Calculate earthwork <br />1 <br />8 <br />4 <br />Prepare preliminary grading plan with supporting calculations <br />4 <br />6 <br />8 <br />2 <br />8 <br />2 <br />B. Preliminary Street and Utility Plan Preparation <br />Prepare profiles, horizontal alignments, and geometric layouts <br />4 <br />12 <br />16 <br />4 <br />24 <br />Prepare typical sections and pavement design <br />1 <br />2 <br />4 <br />Prepare storm sewer piping layouts <br />2 <br />2 <br />8 <br />16 <br />Prepare sanitary sewer and watermain layouts <br />4 <br />8 <br />12 <br />24 <br />Prepare street and utility plan with supporting calculations <br />2 <br />4 <br />8 <br />12 <br />2 <br />C. Preliminary Hydraulic Analysis and Pond Routing <br />Perform hydroCAD modeling <br />2 <br />4 <br />Design and calculate pond volumes <br />1 <br />2 <br />2 <br />4 <br />- Determine drainage routing patterns <br />1 <br />2 <br />1 <br />2 <br />D. Preliminary Landscaping / Streetscaping Plan Preparation <br />Prepare preliminary landscaping plan <br />4 <br />8 <br />8 <br />24 <br />2 <br />Prepare preliminary open space layout plan <br />4 <br />2 <br />8 <br />8 <br />24 <br />1 <br />Prepare preliminary streetscape details <br />4 <br />2 <br />8 <br />12 <br />24 <br />1 <br />E. Prepare Preliminary Estimate of Probable Construction Cost <br />Compute Quantities <br />2 <br />4 <br />4 <br />2 <br />8 <br />Compute Preliminary Estimate <br />2 <br />2 <br />4 <br />2 <br />8 <br />2 <br />Total hours 485 <br />40 <br />52 <br />114 <br />51 <br />218 <br />10 <br />Project labor cost this task $28,712 <br />Expenses <br />Mileage and Expenses $50 <br />Reproductions $1,500 <br />Computers $1,455 <br />Total project cost this task $31,717 <br />