My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2002-011 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2002
>
2002-011 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 12:31:58 PM
Creation date
11/30/2015 12:18:12 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
03/11/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Meeting <br />TCF Bank Site Plan Review <br />March 11, 2002 <br />According to the Lino Lakes Sign Ordinance, signage in the SC District is limited to one <br />wall sign limited in size to 20% of the building face. Building signage for the proposed <br />bank will be on the west facade, facing Lake Drive, and measure approximately twenty- <br />six (26) square feet (2 X 13). Eighteen inch -high raised black plastic letters spelling out <br />"TCF BANK" will be installed. <br />A 12 -foot high x 9 -foot wide monument sign with a 35 square foot sign face was <br />approved with the Market Place PDO. The proposed TCF monument sign will need to <br />conform to the design requirements of the PDO approval. Standard small directional <br />signage will be located throughout the site. <br />Trash <br />Trash equipment will be confined to a fully enclosed structure, which will be constructed <br />of brick to match the principle building and located at the southeast corner of the site. <br />P & Z RECOMMENDATION <br />The above report was presented at the February 13, 2002 meeting of the Planning and <br />Zoning Board. After consideration of the issues, the board voted to approve the proposed <br />Site Plan, with the following conditions: <br />1. That a site development agreement be executed by and between the City of Lino <br />Lakes and TCF Bank. <br />2. A revised Site Plan is submitted that satisfies the impervious surface coverage <br />requirements. <br />3. A revised Floor Plan and Details be submitted that reflects the change in building <br />entrance. <br />4. Approval of the Final Plat for the Lino Lakes Market Place 2nd Addition. <br />OPTIONS <br />1. Approval of Site Plan with conditions. <br />2. Denial of Site Plan. <br />3. Return to staff and continue to next meeting. <br />RECOMMENDATION <br />The proposed Site Plan is consistent with the City's Zoning Ordinance and the Lino <br />Lakes Market Place PDO. Staff recommends approval of the TCF Bank Site Plan with <br />the four conditions noted above. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.