My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2002-077 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2002
>
2002-077 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 4:00:37 PM
Creation date
12/1/2015 8:41:31 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/26/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation sites are proposed to be fenced off after grading is completed to restrict <br />construction traffic. If soils are to be brought to the site they must be consistent with <br />existing soil types. <br />Utilities. The City Engineer has completed review of the Utility Plans. His comments, <br />dated July 3, 2002, are attached. Sanitary Sewer is proposed to be extended to the site <br />from its existing location in Sherman Lake Road, north of Birch Street. Water will be <br />provided by connection to the existing 16" trunk water main lying adjacent to the <br />property on the south side of Birch Street. The water main is proposed to be looped back <br />to the system by crossing Birch Street at Pheasant Hills Drive. <br />Adequate capacity exists in the sanitary sewer system to service the proposed <br />development. In addition, the Black Duck Lift Station, which services the area, is <br />scheduled for replacement in 2003. <br />Drainage and Utility Easements. Drainage and Utility easements are proposed being five <br />feet in width and adjoining lot lines, and 10 feet in width and adjoining street lines and <br />rear lot lines as required. Drainage and Utility easements covering the 100 year High <br />Water Level and those covering underground storm sewers are subject to review and <br />approval by the City Engineer. Easements should be provided to access all pond and <br />wetland areas. Specifically, an easement should be provided for access to Outlot F and <br />covering the emergency pond overflow on Lot 6, Block 8. <br />Parkland Dedication. The Park Board discussed the proposed subdivision at its February <br />4, 2002 meeting. The board is recommending 100% cash payment in lieu of parkland <br />dedication. As explained in the Public Services Director's February 5, 2002 memo <br />(attached) the proposed development lies outside the planning limits of the <br />Comprehensive Park and Trail System Plan. The Park Board looked at several <br />alternatives and recommended the payment in lieu as the preferred option. <br />Floodplain. Portions of the site lie within a Flood Plain Zone A. Zone A represents areas <br />of 100 year flood where base flood elevations have not been determined. The City's <br />Floodplain Management Ordinance requires that all principal structures be located no <br />lower than one foot above the regulatory flood protection elevation. <br />The submitted grading plan identifies proposed 100 year High Water Level elevations. <br />The Rice Creek Watershed District's 1998 Calibration Study identifies the regulatory <br />flood elevation for this area as 887.6. As currently proposed, all lot pads are located <br />entirely above this elevation and all first floor elevations satisfy the flood plain <br />requirements. <br />The proposal is subject to the review and approval of the City Engineer and Rice Creek <br />Watershed District. If the proposed subdivision is approved, the Developer will be <br />required to make application to FEMA for a Letter of Map Amendment (LOMA) or <br />Stoneybrook Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.