My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2002-078 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2002
>
2002-078 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 4:00:08 PM
Creation date
12/1/2015 8:51:32 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/26/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drainage Review Page 2 July 3, 2002 <br />for Stoneybrook <br />3. The City's design standards for storm sewer are the following: <br />Minimum Full Velocity — 3 fps <br />Minimum Mainline Storm Sewer Size —15" RC pipe <br />Minimum Culvert Size —1 5" RC pipe <br />The submitted design seemed to use a minimum full velocity of 2.5 fps and minimum <br />pipe size of 12" RC pipe. <br />The storm sewer chart included in the new plan set reflects the above <br />requirements. <br />4. The City's Local Water Management Plan calls for ponds to be built with a 15 foot, <br />10:1 side slope bench. The pond detail submitted show a 10 foot, 10:1 side slope <br />bench. This detail need to be corrected and the proposed pond adjusted to a 15 foot <br />wide bench. <br />The pond detail has been revised to show a 15 -foot, 10:1 side slope bench. <br />5. The supporting information, soil types, and land use, used to determine the curve <br />numbers needs to be submitted. <br />Supporting information was included in the response letter. <br />6. An SCS TR -55 method should be used to determine the Time of Concentrations, not <br />the Lag method. <br />Response letter reiterates the Time of Concentration from the HydroCAD <br />Model, which was a Lag method computation. An SCS TR -55 method is the <br />preferred method to calculate Time of Concentrations. <br />7. Pond 6 is landlocked, according to the model. The 100 -year flood elevation for the <br />pond will need to be determined allowing for a 100 -year snowmelt, 10 -day runoff of <br />7.2 inches and a Curve Number of 100. <br />The flood elevation has been revised to reflect a 100 -year, l0 -day snowmelt <br />situation. The supporting computations need to be submitted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.