My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2002-161 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2002
>
2002-161 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2015 3:51:57 PM
Creation date
12/1/2015 11:01:24 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
10/28/2002
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 71 <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: October 28, 2002 <br />TOPIC: Resolution No. 02-161, Accepting Feasibility Report, 12th <br />Avenue/Holly Drive Street Reconstruction. <br />VOTE REQUIRED: Simple Majority <br />BACKGROUND: <br />Due to the continued development and growth of the area increasing the traffic <br />on this roadway and the deteriorating condition of 12th Avenue and Holly Drive <br />between Ash Street and Birch Street, the City Council order a feasibility study for <br />the reconstruction of the street. This segment of roadway is designated as a <br />Municipal State Aid Street and serves as a minor collector within the City's <br />Comprehensive Transportation Plan. In addition, some properties adjacent to <br />and beyond 62nd Street do not have access to sanitary sewer or water. <br />The street reconstruction portion of the project will be funded mostly through <br />Municipal State Aid. The utility extensions will be minimal at this time. <br />The study will be delivered to the City Council at the meeting Monday evening. <br />The next step in the process will be to accept the feasibility study for the <br />proposed improvements. Construction of these improvements is projected to <br />start in 2004. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution No. 02-161, Accepting the Feasibility Report for the 12th <br />Avenue/Holly Drive Reconstruction project. <br />RECOMMENDATION: <br />Option No. 2 - Staff recommends that Resolution No. 02-161 be adopted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.