My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00 52 10 <br />AGREEMENT FORM <br />THIS AGREEMENT is by and between the City of Lino Lakes, Minnesota (hereinafter called Owner) <br />and (hereinafter called Contractor). Owner and Contractor, in <br />consideration of the mutual covenants hereinafter set forth, agree as follows: <br />ARTICLE 1 - WORK <br />1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The <br />Work is generally described as follows: Repainting Elevated Water Storage Tank No. 1 and <br />related work. Tank No.1 is a 1.0 M. Gallon PDM Hydropillar with 138 Ft. to TCL. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part and is generally described as follows: Repainting of Elevated Water Tank No. 1 for the City <br />of Lino Lakes, Minnesota. <br />ARTICLE 3- ENGINEER <br />3.01 The Project has been designed by Stantec, (Engineer), 2335 Highway 36 West, St. Paul, MN <br />55113 who is to act as Owner's representative, assume all duties and responsibilities, and will <br />have the rights and authority assigned to Engineer in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for Final Payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Dates for Substantial Completion <br />A. The Work will be Substantially Completed on or before July 1, 2016, including removal of all <br />equipment and materials from the Site, passing disinfection requirement, filled and <br />hydraulically tested and the restoration of the site as required herein and on the Drawings. <br />B. The Project completed and ready for Final Payment in accordance with Paragraph 14.07 <br />of the General Conditions, on or before August 15, 2016. <br />4.03 Liquidated Damages <br />A. Contractor and Owner recognize that time is of the essence of this Agreement and that <br />Owner will suffer financial loss if the Work is not completed within the times specified in <br />Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 <br />of the General Conditions. The parties also recognize the delays, expense, and difficulties <br />involved in proving in a legal or arbitration proceeding, the actual loss suffered by Owner if <br />the Work is not completed on time. Accordingly, instead of requiring any such proof, <br />Owner and Contractor agree that as liquidated damages for delay (but not as a penalty), <br />AGREEMENT FORM <br />© 2015 Stantec 1 193803415 00 52 10 - 1 <br />