6.03 Final Payment <br />A. Upon Final Completion and acceptance of the Work, in accordance with Paragraph <br />14.07 of the General Conditions, Owner shall pay the remainder of the Contract Price as <br />recommended by Engineer as provided in said Paragraph 14.07. <br />ARTICLE 7 - INTEREST <br />7.01 All moneys not paid when due, as provided in Article 14 of the General Conditions, shall bear <br />interest at the maximum rate allowed by law at the place of the Project. <br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS <br />8.01 In order to induce Owner to enter into this Agreement, Contractor makes the following <br />representations: <br />A. Contractor has examined and carefully studied the Contract Documents and the other <br />related data identified in the Bidding Documents. <br />B. Contractor has visited the Site and become familiar with and is satisfied as to the general, <br />local, and Site conditions that may affect cost, progress, and performance of the Work. <br />C. Contractor is familiar with and is satisfied as to all federal, state, and local Laws and <br />Regulations that may affect cost, progress, and performance of the Work. <br />D. Contractor has carefully studied all: (1) reports of explorations and tests of subsurface <br />conditions at or contiguous to the Site and all drawings of physical conditions relating to <br />existing surface or subsurface structures at the Site, and all drawings of physical conditions <br />relating to existing surface or subsurface structures at the Site (except Underground <br />Facilities), if any, that have been identified in the Supplementary Conditions as containing <br />reliable "technical data," and (2) reports and drawings of Hazardous Environmental <br />Conditions, if any, at the Site that have been identified in the Supplementary Conditions as <br />containing reliable "technical data." <br />E. Contractor considered the information known to Contractor, information commonly <br />known to contractors doing business in the locality of the Site; information and <br />observations obtained from visits to the Site; the Contract Documents, with respect to the <br />effect of such information, observations, and documents on (1) the cost, progress, and <br />performance of the Work, (2) the means, methods, techniques, sequences, and <br />procedures of construction to be employed by Contractor, including any specific means, <br />methods, techniques, sequences, and procedures of construction expressly required by <br />the Contract Documents; and (3) Contractor's safety precaution programs. <br />F. Based on the information and observations referred to in Paragraph 8.01.E above, <br />Contractor does not consider that any further examinations, investigations, explorations, <br />tests, studies, or data are necessary for the performance of the Work at the Contract Price, <br />within the Contract Times, and in accordance with the other terms and conditions of the <br />Contract Documents. <br />G. Contractor is aware of the general nature of work to be performed by Owner and others <br />at the Site that relates to the Work as indicated in the Contract Documents. <br />AGREEMENT FORM <br />© 2015 Stantec 1 193803415 00 52 10 - 3 <br />