Laserfiche WebLink
STANDARD GENERAL CONDITIONS OF THE <br />CONSTRUCTION CONTRACT <br />TABLE OF CONTENTS <br />Page <br />Article 1 — Definitions and Terminology 1 <br />1.01 Defined Terms 1 <br />1.02 Terminology 5 <br />Article 2 — Preliminary Matters 6 <br />2.01 Delivery of Bonds and Evidence of Insurance 6 <br />2.02 Copies of Documents 6 <br />2.03 Commencement of Contract Times; Notice to Proceed 6 <br />2.04 Starting the Work 7 <br />2.05 Before Starting Construction 7 <br />2.06 Preconstruction Conference; Designation of Authorized Representatives 7 <br />2.07 Initial Acceptance of Schedules 7 <br />Article 3 — Contract Documents: Intent, Amending, Reuse 8 <br />3.01 Intent 8 <br />3.02 Reference Standards 8 <br />3.03 Reporting and Resolving Discrepancies 9 <br />3.04 Amending and Supplementing Contract Documents 9 <br />3.05 Reuse of Documents 10 <br />3.06 Electronic Data 10 <br />Article 4 — Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental <br />Conditions; Reference Points 11 <br />4.01 Availability of Lands 11 <br />4.02 Subsurface and Physical Conditions 11 <br />4.03 Differing Subsurface or Physical Conditions 12 <br />4.04 Underground Facilities 13 <br />4.05 Reference Points 14 <br />4.06 Hazardous Environmental Condition at Site 14 <br />Article 5 — Bonds and Insurance 16 <br />5.01 Performance, Payment, and Other Bonds 16 <br />5.02 Licensed Sureties and Insurers 16 <br />5.03 Certificates of Insurance 17 <br />5.04 Contractor's Insurance 17 <br />5.05 Owner's Liability Insurance 19 <br />5.06 Property Insurance 19 <br />5.07 Waiver of Rights 20 <br />5.08 Receipt and Application of Insurance Proceeds 21 <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page i <br />00 72 05 <br />