Laserfiche WebLink
5.09 Acceptance of Bonds and Insurance; Option to Replace 21 <br />5.10 Partial Utilization, Acknowledgment of Property Insurer 22 <br />Article 6 - Contractor's Responsibilities 22 <br />6.01 Supervision and Superintendence 22 <br />6.02 Labor; Working Hours 22 <br />6.03 Services, Materials, and Equipment 23 <br />6.04 Progress Schedule 23 <br />6.05 Substitutes and "Or -Equals" 23 <br />6.06 Concerning Subcontractors, Suppliers, and Others 26 <br />6.07 Patent Fees and Royalties 27 <br />6.08 Permits 28 <br />6.09 Laws and Regulations 28 <br />6.10 Taxes 28 <br />6.11 Use of Site and Other Areas 28 <br />6.12 Record Documents 29 <br />6.13 Safety and Protection 29 <br />6.14 Safety Representative 30 <br />6.15 Hazard Communication Programs 31 <br />6.16 Emergencies 31 <br />6.17 Shop Drawings and Samples 31 <br />6.18 Continuing the Work 33 <br />6.19 Contractor's General Warranty and Guarantee 33 <br />6.20 Indemnification 34 <br />6.21 Delegation of Professional Design Services 34 <br />Article 7 - Other Work at the Site 35 <br />7.01 Related Work at Site 35 <br />7.02 Coordination 36 <br />7.03 Legal Relationships 36 <br />Article 8 - Owner's Responsibilities 36 <br />8.01 Communications to Contractor 36 <br />8.02 Replacement of Engineer 37 <br />8.03 Furnish Data 37 <br />8.04 Pay When Due 37 <br />8.05 Lands and Easements; Reports and Tests 37 <br />8.06 Insurance 37 <br />8.07 Change Orders 37 <br />8.08 Inspections, Tests, and Approvals 37 <br />8.09 Limitations on Owner's Responsibilities 37 <br />8.10 Undisclosed Hazardous Environmental Condition 38 <br />8.11 Evidence of Financial Arrangements 38 <br />8.12 Compliance with Safety Program 38 <br />Article 9 - Engineer's Status During Construction 38 <br />9.01 Owner's Representative 38 <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page ii <br />00 72 05 <br />