Laserfiche WebLink
Work of any invention, design, process, product, or device not specified in the Contract <br />Documents. <br />6.08 Permits <br />A. Unless otherwise provided in the Supplementary Conditions, Contractor shall obtain and pay <br />for all construction permits and licenses. Owner shall assist Contractor, when necessary, in <br />obtaining such permits and licenses. Contractor shall pay all governmental charges and <br />inspection fees necessary for the prosecution of the Work which are applicable at the time of <br />opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement. Owner shall <br />pay all charges of utility owners for connections for providing permanent service to the Work. <br />6.09 Laws and Regulations <br />A. Contractor shall give all notices required by and shall comply with all Laws and Regulations <br />applicable to the performance of the Work. Except where otherwise expressly required by <br />applicable Laws and Regulations, neither Owner nor Engineer shall be responsible for <br />monitoring Contractor's compliance with any Laws or Regulations. <br />B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws <br />or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not <br />limited to all fees and charges of engineers, architects, attorneys, and other professionals and all <br />court or arbitration or other dispute resolution costs) arising out of or relating to such Work. <br />However, it shall not be Contractor's responsibility to make certain that the Specifications and <br />Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of <br />Contractor's obligations under Paragraph 3.03. <br />C. Changes in Laws or Regulations not known at the time of opening of Bids (or, on the Effective <br />Date of the Agreement if there were no Bids) having an effect on the cost or time of <br />performance of the Work shall be the subject of an adjustment in Contract Price or Contract <br />Times. If Owner and Contractor are unable to agree on entitlement to or on the amount or <br />extent, if any, of any such adjustment, a Claim may be made therefor as provided in Paragraph <br />10.05. <br />6.10 Taxes <br />A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid by <br />Contractor in accordance with the Laws and Regulations of the place of the Project which are <br />applicable during the performance of the Work. <br />6.11 Use of Site and Other Areas <br />A. Limitation on Use of Site and Other Areas: <br />1. Contractor shall confine construction equipment, the storage of materials and equipment, <br />and the operations of workers to the Site and other areas permitted by Laws and <br />Regulations, and shall not unreasonably encumber the Site and other areas with <br />construction equipment or other materials or equipment. Contractor shall assume full <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 28 of 62 <br />00 72 05 <br />