Laserfiche WebLink
responsibility for any damage to any such land or area, or to the owner or occupant thereof, <br />or of any adjacent land or areas resulting from the performance of the Work. <br />2. Should any claim be made by any such owner or occupant because of the performance of <br />the Work, Contractor shall promptly settle with such other party by negotiation or <br />otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law. <br />3. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and <br />hold harmless Owner and Engineer, and the officers, directors, members, partners, <br />employees, agents, consultants and subcontractors of each and any of them from and <br />against all claims, costs, losses, and damages (including but not limited to all fees and <br />charges of engineers, architects, attorneys, and other professionals and all court or <br />arbitration or other dispute resolution costs) arising out of or relating to any claim or action, <br />legal or equitable, brought by any such owner or occupant against Owner, Engineer, or any <br />other party indemnified hereunder to the extent caused by or based upon Contractor's <br />performance of the Work. <br />B. Removal of Debris During Performance of the Work: During the progress of the Work <br />Contractor shall keep the Site and other areas free from accumulations of waste materials, <br />rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other <br />debris shall conform to applicable Laws and Regulations. <br />C. Cleaning: Prior to Substantial Completion of the Work Contractor shall clean the Site and the <br />Work and make it ready for utilization by Owner. At the completion of the Work Contractor <br />shall remove from the Site all tools, appliances, construction equipment and machinery, and <br />surplus materials and shall restore to original condition all property not designated for alteration <br />by the Contract Documents. <br />D. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded <br />in any manner that will endanger the structure, nor shall Contractor subject any part of the <br />Work or adjacent property to stresses or pressures that will endanger it. <br />6.12 Record Documents <br />A. Contractor shall maintain in a safe place at the Site one record copy of all Drawings, <br />Specifications, Addenda, Change Orders, Work Change Directives, Field Orders, and written <br />interpretations and clarifications in good order and annotated to show changes made during <br />construction. These record documents together with all approved Samples and a counterpart of <br />all approved Shop Drawings will be available to Engineer for reference. Upon completion of the <br />Work, these record documents, Samples, and Shop Drawings will be delivered to Engineer for <br />Owner. <br />6.13 Safety and Protection <br />A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety <br />precautions and programs in connection with the Work. Such responsibility does not relieve <br />Subcontractors of their responsibility for the safety of persons or property in the performance of <br />their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 29 of 62 <br />00 72 05 <br />