Laserfiche WebLink
SECTION 01 33 00 <br />SUBMITTAL PROCEDURES <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. General procedures and requirements for submittals during the course of construction. <br />PART 2 EXECUTION <br />2.01 SHOP DRAWINGS AND MANUFACTURERS' INFORMATION <br />A. Conform to the requirements of Paragraph 6.17 of the General Conditions, except as <br />modified herein. <br />B. The minimum sheet size shall be 8-1/2 inches by 11 inches. Non -legible copies will not be <br />reviewed. <br />C. Submit a minimum of 4 copies of shop drawings, plus the quantity of copies the Contractor <br />wants returned. Each copy shall contain the following information: <br />1. Date of submission and date of any previous submittals. <br />2. Project Title. <br />3. Names Of: Contractor, subcontractor, supplier, and manufacturer. <br />4. Identification of product and Specification Section number. <br />5. Identification of revisions from previous submittals <br />6. A 4 -inch by 4 -inch blank space for Engineer's stamp. <br />D. Engineer's review will be in conformance with the requirements of Paragraph 6.17 of the <br />General Conditions, except as modified herein. <br />E. Engineer will stamp shop drawings and indicate requirements for Contractor's review or <br />resubmittal as follows: <br />1. "Reviewed" - Appears that items covered by the submittal will after installation or <br />incorporation into the Work conform to the information given in the Contract <br />Documents and appears to be compatible with the design concept of the completed <br />Project as a functioning whole as indicated by the Contract Documents. <br />2. "Reviewed as Noted" - Appears that items covered by the submittal will after <br />installation or incorporation into the Work conform to the information given in the <br />Contract Documents and appears to be compatible with the design concept of the <br />completed Project as a functioning whole as indicated by the Contract Documents, <br />except as noted by Engineer. <br />3. "Revise and Resubmit" - Appears that items covered by the submittal will not after <br />installation or incorporation into the Work conform to the information given in the <br />Contract Documents and will not be compatible with the design concept of the <br />completed Project as a functioning whole as indicated by the Contract Documents. <br />Contractor shall revise submittal and conform to the resubmittal procedures described <br />in Paragraph 6.17.E of the General Conditions. <br />SUBMITTAL PROCEDURES <br />© 2015 Stantec 1 193803415 01 33 00 - 1 <br />