Therefore, containment and disposal per State and Federal Regulations will be mandatory. The <br />Contractor must submit for review and approval to the Engineer and Owner a written plan <br />outlining all the details and equipment the Contractor plans to employ for compliance with the <br />requirements for full containment. In conjunction with full containment, the Contractor shall be <br />responsible to provide adequate dust collection and negative air to the containment system to <br />prevent the release of emissions to the environment and to provide a reduction of dust exposure <br />for workers. <br />B. Recover, remove, and properly dispose all spent abrasives, dust, dirt, paint chips, spent solvent <br />paint containers, and other waste materials, etc. as specified in Article 3.09 of this Section. <br />C. The Contractor expressly agrees to obey the verbal or written direction and instruction of the <br />Engineer, Resident Project Representative, or Owners Representative in determining when the <br />exterior sandblasting operation may proceed or must be suspended due to excessive winds or drift <br />of dust, spent abrasive, and paint chips outside the area of containment. <br />D. Screens used for containment shall be inspected and approved for use by the Engineer, Resident <br />Project Representative, or Owners Representative. Wind screens used for containment shall be <br />solid screens. They shall be UV stabilized, weather and solvent resistant. <br />E. The Contractor shall be fully responsible to provide 100 percent impervious ground coverage in all <br />areas adjacent to the tank for the purpose of ensuring recovery of (a minimum) 95 percent of all <br />spent abrasive, removed paint, and debris from the abrasive blast operation until TCLP testing <br />proves that product is not classified as hazardous. Ground cover shall consist of reinforced plastic <br />or canvas tarps sufficiently overlapped and secured to prevent contamination of the ground by <br />contact of the abrasive and paint chip debris. <br />F. A full containment plan shall be submitted outlining all the details, equipment, containment <br />screens, negative air dust removal equipment, containment structure and installation drawings, <br />other equipment, wind loading calculations, containment support calculations and/or other <br />pertinent information, and inhibitor the Contractor's plans to employ with the blasting operation. <br />1. The full containment plan must be submitted at the preconstruction meeting for approval. <br />Work on the Project will not begin without an approved visible emissions control plan. <br />2. This containment plan must be in conformance with Minnesota State Rules 7005.1100 through <br />7005.1130 and 7005-0550 for the control of fugitive particulate matter and visible emissions. <br />G. The Base Bid includes installing containment shroud lugs for full containment. Containment shroud <br />lugs shall be as recommended for the TEPE Containment Shroud System as manufactured by <br />K & L Manufacturing/Eagle Industries. Containment lugs/mounting pads shall be seal welded to the <br />tank roof. All edges of the lugs/mounting pads shall be ground to a 1/8 inch or greater radius. <br />3.03 BLAST CLEANING <br />A. Use proper equipment and abrasives when blast cleaning to produce the mil profile recommended <br />by the coating manufacturer. Do not re -use silica sand or flint abrasives. <br />B. The abrasive used shall be of the type that is graded as to proper size, shape, and hardness. It <br />shall be free of contaminants and shall not embed itself in the blasted surface. Silica sand, flint, <br />garnet, or quartz type abrasives shall be chemically washed; dried; dust, dirt, and fines free; <br />resistant to fracture (shattering); and contain no leachable contaminants. Synthetic Carbide, <br />Aluminum Oxide, and Refractory Slag products shall meet the above criteria. THE USE OF <br />REDUCED OR DUST FREE ABRASIVE FOR BLASTING IS REQUIRED FOR BLASTING OF EXTERIOR <br />SURFACES DUE TO CONTAINMENT AND THE CLOSE PROXIMITY OF BUILDINGS AND STREETS. <br />WATER TOWER REPAINTING <br />© 2012 Stantec 1 193803415 09 91 55 - 5 <br />