Laserfiche WebLink
G. If applied by brushing, the coating shall be brushed on in 1 direction and then smoothed in a <br />direction at right angles thereto, so as to produce as uniform thickness of coating and as complete <br />coverage as possible. Such 2 directional brushing shall be considered as "1 coat" within the <br />meaning of these Specifications. <br />H. Sufficient time shall be allowed for each coat to dry properly and in accordance with the <br />manufacturer's recommendations before applying the next coat. All areas cleaned shall be primed <br />within 8 hours of being cleaned. Any areas developing a film or rust shall be re -cleaned before <br />priming. Finish coats of paint shall be free of holidays, runs, drips, or sags. Any areas showing such <br />defects in the prime coat shall be corrected prior to application of the finish coat. Any areas <br />showing defects in the finish coat shall be scraped and repainted to the satisfaction of the <br />Engineer. <br />3.06 VENTILATION AND SAFETY <br />A. The Contractor shall maintain adequate and continuous explosion -proof ventilation during all <br />surface preparation and coating operations, and during all re -coat and curing periods. This <br />ventilation shall be of the suction type and shall be of sufficient capacity to maintain throughout <br />the tank interior a clear atmosphere that is well below explosive and toxic limits. <br />B. Arrange the ventilation system, including all fans and temporary ductwork, so that fresh air is <br />drawn into the tank at the bottom and is exhausted at the top with an upward air movement <br />pattern within the tank that permits no still air spaces to exist in any area. Give particular attention <br />to floor level or lower spaces, and pocket areas where heavier-than-air solvents and particulate <br />matter are likely to accumulate. Said ventilation shall be sufficient for the removal of dust, coating <br />fumes, or other volatile gases and moisture to such an extent as to prevent any undesirable <br />accumulation and prevent hazard to the workmen or the Work. <br />C. All electrical equipment, tools, and ventilation fans shall be explosion -proof and/or non -sparking <br />and shall be maintained in good working order. Spray equipment shall be as recommended by or <br />acceptable to the coatings manufacturer and shall be thoroughly cleaned before and after use with <br />the appropriate cleaning solvents. <br />D. Provide adequate explosion -proof lighting during all surface preparation and coating operations. <br />This lighting shall be sufficient to illuminate clearly the working area without shadows. <br />E. In the event heating devices are used, they shall be explosion -proof and of the type that do not <br />exhaust sooty or oily residues or any other contaminants into the tank. Only indirect heating units <br />can be used which will not cause the products of combustion to condense. <br />F. Prior to use, store all coating materials in a secure area which shall provide protection from <br />weather and temperature below 60 degrees F. The area shall be maintained in a safe, neat, and <br />clean manner and free from fire, explosion, or other hazards. <br />G. All Work shall be performed in a safe and orderly manner, all in compliance with the standards as <br />prescribed by OSHA and the Minnesota Department of Labor and Industry, Division of Accident <br />Prevention. The Contractor will be required to comply with OSHA Regulations, including 5205.1000 <br />through 5205.1040 and 5067.0300 for Confined Space Entry. Management and supervisory <br />personnel shall be responsible for employee training and compliance with this policy. <br />H. Securing Tank Openings: Adequate grating or grills will be securely attached to all openings not <br />otherwise secured at the end of work each day until Work commences again and during the final <br />cure after all interior coatings have been applied, until such time as the tank is filled with water <br />WATER TOWER REPAINTING <br />© 2012 Stantec 1 193803415 09 91 55 - 9 <br />