My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and openings are secured for service. Grills or grates shall be at least 1/4 -inch wire mesh with <br />minimum 2 square inch mesh openings and shall allow adequate free air passage. <br />3.07 DISINFECTION <br />A. Upon completion of the coating and confirmation that the coating has been properly cured, the <br />inside of the tank shall be thoroughly cleaned and disinfected by use of chlorine applied in a <br />concentrated solution, sprayed over the entire surface and then washed down with clean water in <br />accordance with the specifications of the Minnesota Health Department, and AWWA C652-02, <br />Section 4.3.2: Chlorination Method 2. <br />B. The disinfected surfaces shall remain in contact with the chlorine solution for at least 30 minutes. <br />Then all disinfected surfaces, including the inlet and outlet piping and any drain piping, shall be <br />washed and purged with clean water. Remove all chlorine solution and purge water from the <br />interior. Following this, potable water shall be admitted. <br />C. After chlorination and before the facility is placed in operation, water from the full facility shall be <br />sampled and tested for coliform organisms in accordance with the latest edition of Standard <br />Methods for the Examination of Water and Wastewater. If the sample is negative, then the facility <br />can be placed into service. If there is a presence of coliform, repeat samples shall be taken until 2 <br />consecutive samples are negative or the reservoir shall be redisinfected using the above specified <br />method. <br />D. Bacterial tests will be taken by an independent laboratory designated by the Owner. Initial tests <br />will be paid for by the Owner. Any retesting required because of failure to meet the specified <br />quality will be paid for by the Contractor. <br />3.08 MISCELLANEOUS <br />A. Paint Thickness: Dry film thickness (D.F.T.) readings of the coating are taken to provide <br />reasonable assurance that the specified minimum D.F.T. has been achieved. A minimum of 5 <br />separate spot measurements shall be made over every 100 square feet in area. Each spot <br />measurement shall consist of an average of 3 -gage readings next to each other no further than <br />6 inches apart. Each spot measurement must meet at least the specified minimum thickness. The <br />single gage readings, however, making up the spot measurements are permitted to be no less <br />than 80 percent of the specified minimum thickness. <br />3.09 CLEAN UP AND DISPOSAL <br />A. After completion of the tank painting, the Contractor shall remove all excess materials, paint <br />products, blasting sand, and debris of any kind caused by the Project. He shall leave the premises <br />in a neat, clean condition, and shall restore all areas, such as driveways, grass, sod, etc., that have <br />been disturbed by his operations to a condition equal to or better than that which existed when he <br />started the Project. <br />B. The Contractor shall at all times keep the premises free from accumulations of waste material or <br />rubbish caused by his employees or Work. He shall clean-up abrasive material or rubbish on a daily <br />regular schedule as directed by the Engineer. All unneeded construction equipment shall be <br />removed from the Site and all damages, required expeditiously so that the adjacent property is <br />inconvenienced as little as possible. <br />C. During exterior sandblasting and coating operations, the Contractor shall provide adequate <br />protection and containment to prevent damage to adjacent structures and property by his <br />WATER TOWER REPAINTING <br />© 2012 Stantec 1 193803415 09 91 55 - 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.