My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Dress complete embankment, backfill, or fill with allowance for topsoil, surfacing, or <br />slope protection where applicable. <br />B. Foundation Preparation: <br />1. Compact upper 12 inches of foundation soils to 100 percent of maximum dry unit <br />weight as determined by ASTM D698. <br />2. Replace unsuitable foundation soils in accordance with Subparagraph 3.06.E.3. <br />C. Backfill Around Structures: <br />1. Backfill to top of structures, unless otherwise shown, with free draining granular soil, less <br />than 12 percent by weight passing a #200 sieve, in 6 -inch lifts. Compact each lift to <br />minimum 95 percent of the Standard Proctor Density as determined by ASTM D698. <br />2. Fine grained soils are moisture sensitive and are often wet (water content exceeds the <br />"optimum moisture content" defined by the Proctor test). In this case, the soils shall be <br />scarified and dried to achieve suitable water content for compaction. <br />D. For areas beneath unpaved roadways, place materials in accordance with MnDOT Spec. <br />2105.3.E, except as follows: <br />1. Upper 3 Feet of Roadbed: Maximum 8 inch thick loose lifts. Compact to minimum of <br />100 percent of maximum unit weight determined in accordance with ASTM D698 <br />standard compactive effort. <br />2. Remainder of roadbed, maximum 12 inch thick lifts. Compact to minimum of <br />95 percent of maximum unit weight determined in accordance with ASTM D698 <br />standard compactive effort. <br />3. Provide moisture control for compaction requirements. <br />4. All common material shall be used from on Site and be incidental to the Contract. <br />E. Replace excavation carried below grade lines shown as follows: <br />1. Beneath Fill or Backfill: Same material as shown for overlying fill or backfill. <br />2. Permanent Cut Slopes (where overlying area is not to receive fill or backfill). Replace <br />excavated material with Granular Borrow. <br />3. Beneath Footings and Base Slabs: <br />a. Remove softer, fine and fill with clayey soils to retain foundation slab grades. Fill <br />material shall be sandy lean clay or clayey sand compacted to: <br />1) 100 percent Standard Proctor Density (ASTM D698) required to attain grade for <br />footings. <br />2) 100 percent Standard Proctor Density (ASTM D698) required to support floor <br />slab only (outside the 1:1 oversized zone below footings). <br />4. Fill placed under floor slabs/foundations shall extend from planned edges of the <br />foundations to a distance equal to at least 1 foot for each vertical foot of compacted <br />fill required beneath the foundation at that location (1:1 oversize), refer to Drawings. <br />3.07 DISPOSITION OF EXCAVATED MATERIAL <br />A. Conform to MnDOT Spec. 2105.3D, or as modified herein: <br />1. Strip topsoil consistent with Section 31 10 00. <br />2. No disposition of bituminous millings will be permitted. <br />3.08 PLACING EMBANKMENTS <br />A. Conform to MnDOT Spec. 2105.3E, or as modified herein: <br />1. Topsoil placement shall conform to Section 32 92 00. <br />EXCAVATION AND FILL <br />© 2015 Stantec 1 19380XXXX 31 23 00 - 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.