Excavation Plan shall be submitted describing construction sequencing, limits of <br />excavations, methods of protection for surrounding pipes and structures, and locations <br />and extent of temporary bracing and sheeting employed. Such Excavation Plan shall be <br />prepared or reviewed, approved, and signed by a geotechnical engineer registered in <br />the State of Minnesota. <br />E. Remove all organic and clay materials and material not suitable for load bearing <br />structures. <br />F. Excavate soft spots, fill with aggregate backfill material and recompact to densities <br />specified. <br />G. Backfill excavations made too deep with aggregate backfill and compact. <br />H. Surface compact natural and fill soils prior to placing reinforcing steel. <br />I. Contractor may use 4 to 6 inches of clear rock as a mud mat for a working platform for <br />steel placement. This mud mat shall not displace any concrete thickness required. <br />J. Protect bottom of excavation from frost at all times. Do not place foundations, footings, <br />slabs, or fill on frozen soil. <br />3.05 USE AND STORAGE OF EXCAVATED MATERIALS <br />A. Incorporate suitable excavated material into backfill around structures, embankments, <br />trenches for piping and roadways. <br />B. Use excavated materials which are unsuitable or exceed quantity needed as non- <br />structural, grassland fill. <br />C. Do not stockpile excavated materials near or over existing facilities, adjacent property, or <br />completed work, unless approved in writing as part of Excavation and Embankment Plan. <br />D. Do not place snow, ice, or frozen material in embankment fill or in backfill. <br />E. Do not place stone or concrete fragments exceeding 3 inches in any dimension into the <br />embankment fill or in backfills or trench backfills. <br />F. Confine stockpiles to within property lines of the proposed water treatment facility site, <br />refer to Drawings. <br />G. All material needed for construction and grading, with the exception of topsoil, is to be <br />excavated from within the Site limits. Contractor shall excavate material from approved <br />areas if additional fill is required. <br />3.06 PLACING FILL AND BACKFILL <br />A. Outside influence areas, beneath piping, structures, slabs, and other facilities and pipe <br />trench backfill, place materials as follows: <br />1. Allow for 4 inch thickness of topsoil in sodded areas. <br />2. Allow for an additional 12 inch thickness of cohesive soil (clayey sand or sandy lean <br />clay) to retard infiltration of water. <br />3. Maximum 6 -inch thick lifts. <br />4. Compact to minimum 100 percent of maximum density as determined in accordance <br />with standard compactive effort ASTM D698. <br />EXCAVATION AND FILL <br />© 2015 Stantec 1 19380XXXX 31 23 00 - 4 <br />