My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12-28-2015 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2015
>
12-28-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 3:22:06 PM
Creation date
1/5/2016 2:07:20 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/28/2015
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.09 MAINTENANCE <br />A. Restored areas that have been satisfactorily completed and are disturbed by additional <br />construction activity required by the timing and sequencing of the Work shall be restored <br />over to the same requirements of the original work. <br />B. Any sod that does not show definite growth and establishment 60 days after installation <br />shall be replaced and established at the proper season by the Contractor at his/her <br />expense. <br />C. Seed maintenance shall be done in conformance with the MnDOT Seeding Manual - <br />Maintenance Requirements for year 1. <br />D. Watering of sod areas shall be done for a minimum period of 60 days from installation <br />sufficient to ensure establishment of permanent vegetation. <br />3.10 INSPECTION AND ACCEPTANCE <br />A. Seeding and turf work will be inspected for acceptance in parts agreeable to the <br />Engineer, provided Work offered for inspection is complete, including maintenance for the <br />portion in question. <br />B. At the conclusion of the establishment period(s), a final inspection of planting(s) will be <br />made to determine the conditions of areas specified for landscaping. <br />C. When inspected landscape work does not comply with requirements, replace rejected <br />Work and continue specified maintenance until re -inspected by Engineer and found to be <br />acceptable. Remove rejected materials from the Site. <br />END OF SECTION <br />TURF AND GRASSES <br />© 2015 Stantec 1 193803415 32 92 00 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.