Laserfiche WebLink
www.olsonsinthepink.com <br />Keep Your Sewer in the Pink! <br />Olson's Sewer Service, Inc. • Olson's Excavating Service <br />17638 Lyons Street NE <br />Forest Lake, MN 55025 <br />(612) 464-2082 • Fax: (651) 464-9029 <br />PROPOSAL SUBMITTED TO <br />City of Lino Lakes, ATTN: Ed Youngquist <br />PHONE <br />651-982-2455 <br />DATE <br />12/23/2015 <br />STREET <br />600 Town Center Parkway <br />JOB NAME <br />Lino Lakes Sediment Control <br />CITY, STATE AND ZIP CODE <br />Lino Lakes, MN 55014 <br />JOB LOCATION <br />ARCHITECT/DESIGNER <br />DATE OF PLANS <br />EMAIL <br />eyoungquist@wsbeng.com <br />We hereby submit specifications and estimates for: <br />Site #1 7257 Meadow Court <br />Place 150' of mats, remove two small trees, salvage existing rip rap, scrape up dirt that eroded from the flared end, haul in, and place 1 — <br />12 cubic yard load of Anoka County sand, haul in, and place 1 — 12 cubic yard load of topsoil, install non -woven fabric, and place salvaged <br />rip rap, install seed, fertilizer, and two sided erosion blanket, install 30' of bio -roll, remove mats. The cost is $3942.92. <br />Site #2 630 Lois Lane <br />Place 128' of mats, utilize existing dirt by the flared end to replace eroded dirt, haul in 12 tons of 6' to 12' rip rap, install non -woven fabric, <br />place rip rap, haul in up to 12 cubic yards of topsoil, install seed, fertilizer, and two side erosion blanket, install 30' of bio -roll, remove mats, <br />sweep road where topsoil and rip rap were dumped. The cost is $4434.31. <br />Site #3 1588 LaMotte Circle <br />Place 128' of mats, load, haul away and dispose up to 60 cubic yards of soil, clean end of culvert, remove mats. The cost is $3510.00 <br />Site #4 6385 Deerwood Lane <br />Install 128' of mats on the east side and 50' on the west side, remove tree on the west side, load, haul away and dispose 60 cubic yards <br />on the east side and 40 cubic yards on the west side, clean culvert ends, remove mats. The cost is $4366.00 <br />Site #5 2231 LaCasse Drive <br />Install 260' of mats, remove two small trees, install 1 mat between east and west flume, remove east and west side flumes, place removed <br />dirt on the north side of the pond, install seed, fertilizer, and bio -roll on north side of pond, install 60' of bio -roll on north side of pond, install <br />seed, fertilizer, and erosion blanket on west side of pond. Install 60' of bio -roll on west side of pond, remove mats. This cost is $4633.95 <br />Any person or company supplying labor or materials for this improvement to your property may file a lien against <br />your property if that person or company is not paid for the contributions. Under Minnesota law, you have the right <br />to pay persons who supplied labor or materials for this improvement directly and deduct this amount from our <br />contract price, or withhold the amounts due from us until 120 days after completion of the improvement unless we <br />give you a lien waiver signed by persons who supplied the labor or material for the improvement and who gave you <br />timely notice. We reserve the right to file a lien if payment in full is not received within 30 days of the invoice date. <br />Any additional costs will be added to the bill for interest, legal expenses, attorney fees, and /or collection costs. <br />We Propose hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: <br />AS STATED ABOVE <br />Payment to be made as follows: <br />TO BE PAID IN FULL UPON COMPLETION. <br />A SIGNED CONTRACT IS NECESSARY TO PERFORM THE WORK DESCRIBED ABOVE. <br />All material is guaranteed to be as specified. All work to be completed in a workmanlike manner <br />according to standard practices. Any alteration or deviation from above specifications involving extra <br />costs will be executed only upon written orders, and will become an extra charge over and above the <br />estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to <br />carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen's <br />insurance. <br />Authorized Signature <br />JON M. OLSON <br />Note: We may withdraw this proposal if not accepted within 30 days. <br />Acceptance of Proposal <br />conditions are satisfactory <br />do the work as specified. <br />Date of Acceptance <br />— The above prices, specifications and <br />and are hereby accepted. You are authorized to <br />Payment will be made as outlined above. <br />X <br />Signature <br />X <br />Signature <br />www.olsonsinthepink.com <br />Keep Your Sewer in the Pink! <br />