www.olsonsinthepink.com
<br />Keep Your Sewer in the Pink!
<br />Olson's Sewer Service, Inc. • Olson's Excavating Service
<br />17638 Lyons Street NE
<br />Forest Lake, MN 55025
<br />(612) 464-2082 • Fax: (651) 464-9029
<br />PROPOSAL SUBMITTED TO
<br />City of Lino Lakes, ATTN: Ed Youngquist
<br />PHONE
<br />651-982-2455
<br />DATE
<br />12/23/2015
<br />STREET
<br />600 Town Center Parkway
<br />JOB NAME
<br />Lino Lakes Sediment Control
<br />CITY, STATE AND ZIP CODE
<br />Lino Lakes, MN 55014
<br />JOB LOCATION
<br />ARCHITECT/DESIGNER
<br />DATE OF PLANS
<br />EMAIL
<br />eyoungquist@wsbeng.com
<br />We hereby submit specifications and estimates for:
<br />Site #1 7257 Meadow Court
<br />Place 150' of mats, remove two small trees, salvage existing rip rap, scrape up dirt that eroded from the flared end, haul in, and place 1 —
<br />12 cubic yard load of Anoka County sand, haul in, and place 1 — 12 cubic yard load of topsoil, install non -woven fabric, and place salvaged
<br />rip rap, install seed, fertilizer, and two sided erosion blanket, install 30' of bio -roll, remove mats. The cost is $3942.92.
<br />Site #2 630 Lois Lane
<br />Place 128' of mats, utilize existing dirt by the flared end to replace eroded dirt, haul in 12 tons of 6' to 12' rip rap, install non -woven fabric,
<br />place rip rap, haul in up to 12 cubic yards of topsoil, install seed, fertilizer, and two side erosion blanket, install 30' of bio -roll, remove mats,
<br />sweep road where topsoil and rip rap were dumped. The cost is $4434.31.
<br />Site #3 1588 LaMotte Circle
<br />Place 128' of mats, load, haul away and dispose up to 60 cubic yards of soil, clean end of culvert, remove mats. The cost is $3510.00
<br />Site #4 6385 Deerwood Lane
<br />Install 128' of mats on the east side and 50' on the west side, remove tree on the west side, load, haul away and dispose 60 cubic yards
<br />on the east side and 40 cubic yards on the west side, clean culvert ends, remove mats. The cost is $4366.00
<br />Site #5 2231 LaCasse Drive
<br />Install 260' of mats, remove two small trees, install 1 mat between east and west flume, remove east and west side flumes, place removed
<br />dirt on the north side of the pond, install seed, fertilizer, and bio -roll on north side of pond, install 60' of bio -roll on north side of pond, install
<br />seed, fertilizer, and erosion blanket on west side of pond. Install 60' of bio -roll on west side of pond, remove mats. This cost is $4633.95
<br />Any person or company supplying labor or materials for this improvement to your property may file a lien against
<br />your property if that person or company is not paid for the contributions. Under Minnesota law, you have the right
<br />to pay persons who supplied labor or materials for this improvement directly and deduct this amount from our
<br />contract price, or withhold the amounts due from us until 120 days after completion of the improvement unless we
<br />give you a lien waiver signed by persons who supplied the labor or material for the improvement and who gave you
<br />timely notice. We reserve the right to file a lien if payment in full is not received within 30 days of the invoice date.
<br />Any additional costs will be added to the bill for interest, legal expenses, attorney fees, and /or collection costs.
<br />We Propose hereby to furnish material and labor — complete in accordance with above specifications, for the sum of:
<br />AS STATED ABOVE
<br />Payment to be made as follows:
<br />TO BE PAID IN FULL UPON COMPLETION.
<br />A SIGNED CONTRACT IS NECESSARY TO PERFORM THE WORK DESCRIBED ABOVE.
<br />All material is guaranteed to be as specified. All work to be completed in a workmanlike manner
<br />according to standard practices. Any alteration or deviation from above specifications involving extra
<br />costs will be executed only upon written orders, and will become an extra charge over and above the
<br />estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to
<br />carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen's
<br />insurance.
<br />Authorized Signature
<br />JON M. OLSON
<br />Note: We may withdraw this proposal if not accepted within 30 days.
<br />Acceptance of Proposal
<br />conditions are satisfactory
<br />do the work as specified.
<br />Date of Acceptance
<br />— The above prices, specifications and
<br />and are hereby accepted. You are authorized to
<br />Payment will be made as outlined above.
<br />X
<br />Signature
<br />X
<br />Signature
<br />www.olsonsinthepink.com